Back to Matters
Development Permit - 25 Stillwater Road
First seen: March 3, 2015
Last seen: March 3, 2015
Lifecycle Timeline
March 3, 2015Council
Full RecordingEnvironmental Development Permit No. 2014/14 - 25 Stillwater Road
Council approved a permit for building at 25 Stillwater Road with special conditions to ensure the home remains safe from rising sea levels over the next 100 years.
Formal MotionPassed
"THAT Development Permit No. 2014/14 be approved as per the report from the Planner dated February 26, 2015; AND THAT Development Permit No. 2014/14 include the following variances: - Variance to the setback from the rear lot line within the R-1B: Detached Residential (Medium Lot) zone from 6m to 3.5m; AND THAT Development Permit No. 2014/14 include the following conditions: - A geotechnical report from a qualified geotechnical engineer be submitted indicating that the lot will remain viable over a one hundred year period in the context of potential sea level rise due to climate change; - A shoreline reclamation plan be submitted, consistent with both the Environmental Report attached to this report and to the Natural Watercourse and Shoreline Areas Development Permit Area Guidelines within the Official Community Plan, to the satisfaction of the Director of Development Services; - A Deposit for 125% of the reclamation cost estimate be provided to the Town as a security against damage to the natural environment or landscaping deficiencies."
Moved by: Heidi Rast
Seconded by: Ron Mattson
David Screech
Aaron Weisgerber
Ron Mattson
Heidi Rast
John Rogers