Meeting Overview
The Committee of the Whole meeting focused heavily on the 2025-2029 Draft Financial Plan. The Director of Finance reported that maintaining current service levels would require an 11.25% tax increase. Council subsequently debated strategies for reducing this impact. Several new capital and non-core projects were discussed and voted on, including tabling a Permits and Licensing Portal (C-185/N-130), defeating a motion to remove the Parks and Trails Master Plan (N-129), and deferring the Island Highway realignment (C-175) to 2026. A key outcome was the motion to reduce the planned tax increase for a representative home from 11.25% to 9.8%, utilizing $174,000 from the accumulated surplus to cover the difference. Council also requested reports reviewing service levels for future budgets and specific traffic signal modifications at the Helmcken/Watkiss Way intersection.
Key Decisions
- THAT the minutes from the Committee of the Whole meeting held March 11, 2025 be adopted as presented.
- The proposed project to digitize permit applications and licensing was tabled pending an options analysis report that would investigate compatibility with provincial systems and long-term operating costs.
- This infrastructure realignment project was deferred to 2026 to better align its timing with the adjacent planned development (339 Island Highway).
- A motion to defer the program to update traffic calming policy based on new residential speed limits failed due to lack of a seconder.
- Staff is directed to review all municipal service levels and identify potential cost savings to inform the creation of future operational budgets (starting 2026).
Transcript
1725 segmentsGood afternoon, View Royal, and welcome to this meeting of the Committee of the Whole.
Um this will be this will be a budget meeting in particular for the entirety of the meeting.
Uh I'm got a so I'm going to call this Committee of the Whole meeting to order.
We recognize the Lakwungan speaking people, known today as the Esquimalt Nation and Songhees Nation, and that their historic connections to these lands continue to this day.
This afternoon we will hear from the public during the public participation and question period portions of the agenda.
And for members of the audience, the council chambers is a safe, respectful, and inclusive place.
All members of the audience are asked to refrain from clapping, cheering, or openly expressing your opposing opinions when others are speaking or when they are done speaking.
When it's your turn to talk, do not speak disrespectfully about anyone else, including council and staff.
Do not make statements or allegations that call into question the character of anyone else.
Do not use rude or offensive language.
Do not speak or act in an aggressive, bullying or harassing way.
Council wants to hear the views of those participating in the meeting in an open and impartial forum.
To provide comments virtually during the public participation period or to ask questions during question period, you'll see a QR code or a URL on the live webcast stream screen or a URL on the town's website under live Webcast.
Scan the QR code or type in the URL and through the forum that pops up, type in your comment or question to be read out loud at the appropriate time by a member of our webcast team.
You will need to provide your name and street name on the forum or if you're speaking in council chambers.
Public participation comments are limited to five minutes for each speaker and must be related to items on the agenda.
Question period is open to any question and is limited to two minutes for each speaker.
You will be timed.
This meeting will be recorded by participating in this webcast.
You're consenting to being recorded, and the recording will be available on the town's website for future access.
Can I get a motion to approve the agenda, please?
So moved by Councillor Brown.
Secondary, secondary by Councillor Mattson.
All those in favor?
Motion approved, agenda approved.
And minutes of the previous meeting, motion to adopt.
Second.
Moved by Councillor Brown, seconded by Councillor Rogers.
All those in favor, move adoption.
Chair's report, as I stated earlier, this is a budget meeting in which we'll be looking at the financial plan.
And uh through that, we'll be looking at uh various projects throughout that are proposed for the coming year.
And uh hopefully this will be a smooth and effective meeting, hopefully, and we hope to end end the evening.
This meeting will go into the evening, um, with some knowledge of what the tax rates could be um so uh public participation period we've got nobody in the in the chambers um carl anyone online or any calls chair we have uh no message on the message system this evening okay thank you very much and uh reports staff um it's over to you.
Staff reports 2025 draft financial plan.
Director vella, I would think this it's over to you.
Thank you, Madam chair.
Good afternoon, Council uh this report presents the 2025 draft financial plan for council's consideration.
I have just a couple of slides.
Little has changed since this information was brought forward during meetings in March, but I'll go over the highlights for you again.
My ask is that I may finish reviewing the information with you and then open it up for questions afterward if that works for you.
The budget is being prepared based on maintaining status quo service levels from the 2024 financial plan, plus non-discretionary increases, and new services or staffing either approved by council or referred to the 2025 budget.
The result is an increase in taxation revenue of $1.4 million or 11.25%.
Table two of the report breaks out the $1.4 million to display the main cost drivers.
Here is a chart displaying the same information.
You should also have a copy of the pie chart in front of you.
You can see that the uh increases relating to protective services make up the majority at a combined $900,000 of the $1.4 million.
Council's commitment to sustainable funding of asset infrastructure replacement accounts for $400,000 through contributions to reserves.
$60,000 for cost escalations relating to Greater Victoria Public Library and West Shore Parks and Recreation, including the continued shift from casino funding of West Shore Parks and Rec.
Staffing the IT coordinator position full-time contributes $54,000.
Staff project that development permit revenue will decrease by $72,000 in 2025.
This reduction, coupled with other operational expense and revenue changes, result in increased taxation of approximately $150,000.
Staff increased the budget for investment income, which has been quite favorable over the past couple of years.
While maintaining a conservative outlook, staff feel the $150,000 increase is appropriate, resulting in a slight offset of the overall taxation revenue requirement.
I'll just touch on strategic non-corn capital projects.
Given its size and staff capacity.
Projects are detailed in Schedule 2.1 and 3.1 of appendix A of the report.
Staff have provided committee with individual project summaries for information, and later we will deliberate the projects with a focus on the first two years of the plan, keeping in mind that outcomes of your decisions will have little impact on tax revenue as projects are funded from grants and reserves.
Two amendments have been identified which will be identity will be added to the financial plan for council approval.
They are the school district crossing guard program moving from an annual grant and aid to a core service item.
2025 funding was omitted from the draft budget in error, and $45,000 will be added to the transportation operations budget for 2025 to 2029, funded from Casino Reserve in 2025, then moved to taxation funding in 2026.
Capital Project C54, the Helmick and Curbs sidewalk from Eagle Creek Village to Aspire will be removed from the budget as per council motion at the March 18th, 2025 council meeting.
The 11.25% increase to an average home based on 2024 tax multiples and 2025 revised roll values, which is the final role for tax purposes, is detailed in Table 1 of the report and comes in at $249 per average valued home this year.
In terms of tax revenue reduction strategies, there are options available while maintaining existing service levels and the budget drivers as presented.
For every percent reduction in taxation, alternative funding of approximately $120,000 is required.
2024 saw an operating surplus of approximately $1.2 million, contributing to an unrestricted accumulated surplus of $8.4 million.
This number is not final with the town's financial statement audit being undertaken this week.
Staff recommend the use of unrestricted accumulated surplus as the tax reduction strategy.
Use of surplus is preferred over reduced reserve contributions while a contra while a combination of the two is a possible alternative.
Staff cannot stress enough the importance of maintaining the positive work council has done thus far to implement recommendations brought forward by sustainable by our sustainable infrastructure replacement plan, specifically increasing contributions to reserves.
Staff recommendation is that committee recommend to council that staff prepare the 2025 to 2029 financial plan bylaw for consideration based on the feedback received during the public financial plan consultation and today's financial plan recommendations both the financial plan and tax rates bylaws require final reading by may 14th thank you that is all for now and um happy to take questions thank you state um just before we get into questions can you um repeat did you give a number for the school crossing guard program right now we have a placeholder of forty five thousand dollars based on uh previous costs the most recent information uh that may be subject to change in the near future and so with that addition is that included in the 11.25 or would that even that's or would that be operational it is casino funded so there's no taxation impact on that okay thank you all right um questions for my colleagues counselor rogers are there did you sorry staff did you mention that um we had uh the feedback from the community was there a a table or or uh some survey results there are survey results attached to the draft financial plan report oh there's an appendix there okay um what it in this?
Or you don're doing no the the j the staff report actually.
Okay.
Okay.
Right, I'll I'll dig into that in a minute.
Uh if I may, another question.
Yeah.
That's the Rogers.
Uh oh, are we good?
Okay.
I was waiting for you to come back somewhere.
Hi there.
Okay, so um the recent um stock market turmoil.
Uh how does do how do we prove um consider, project, ponder uh the impact on our um revenue savings that is a good question.
Uh the town currently has as of as of the end of 2024 has 52 million dollars in cash.
And the money is sitting in um three of the chartered banks as well as MFA invested in uh interest-bearing financial instruments.
So in terms of the market risk, we we don't really worry about that.
It's mostly interest rate risk, which is affected by the economy if there's a recession and then um monetary policy by the the Bank of Canada could affect that.
And and so there is a little bit of risk there.
Uh that would be how I'd see that.
So are I gather then um our monies are we're in conservative um uh streams versus the uh uh tenuous situation that we see right now.
Is that what you're saying?
Correct.
Okay, good.
Um I'm curious, um the the property assessments um uh uh can anyone speculate what kind of uh increased tax uh revenue benefits um we could receive with the new uh Canadian tire building?
I do not have that information in front of me here.
Because uh that would that would be interesting um to compare the tax revenue of of what we have today and and uh with the massive new building that's going on.
I'm sure that would be a considerable increase in tax benefit next year.
Okay.
Um that's uh my two main questions right now.
No other questions?
Um Mayor Tobias.
Yeah, thanks for um the report, Steve.
So um I uh can you walk us through a little bit about what you left for us?
Or is that later on the agenda uh on our tables about kind of explaining the pie chart and the um and this is specifically for the increase drivers for the um 1.4 million uh for increase saying i i just signed the e comm 911 just that uh sorry I didn't have my microphone on um uh some of the other things i think council's already aware of.
Victoria Public Library, we've already approved the information technology coordinator um position.
The uh the other ones seem to make uh sense, but I'm wondering if you the RCMP contract and civilian support, uh is that for another member plus another support staff?
Maybe that's a Scott question.
It's something that council had agreed to, but it's coming out of this budget as new increase, correct?
Um we might want to take advantage of the fact uh Chief Hurst is here, although he's maybe immersed in an emergency.
Um do you want to do you want to talk about the staffing increases for the fire department?
Yeah.
Just in in particular, um, you know, what was budgeted for last year and as part of the unionization and the service improvements related to the staffing?
Thank you, Mayor.
Of course.
So as a result of the uh unionization, there was some uh letters of understanding entered into with the with the local with respect to changes in their hours and shift patterns and that resulted in us having to acquire additional staff to make that happen.
So there was a uh proposal for I haven't got that document in front of me so about 99% here.
Um two positions uh last year and then two this year.
We had to shuffle that to take on uh three firefighter positions last year to achieve and satisfy that letter of understanding to get the staff to the two-day, two-night.
We we had until December 31st to switch over to that shift model.
Um so the original plan was a total of five people.
It was four firefighters and one assistant chief.
Um my apologies.
Um, so we hired um three firefighters uh right away to satisfy the MOU and then an assistant chief uh in secured that position in November of last year with a January start.
So there won't be any additional hires until there's one on the books for 2026 that we can discuss at a later later date.
But there's no more hirings for 2025.
Those have been satisfied, and we've met the uh the terms of the collective agreement with the unionized staff.
Okay, so for operational expenses for increase for this year, is that 100% staff or is anything coming out uh for the increase that is not capital?
Is that all staff right there, Paul?
For uh the half a million dollars or 400.
That is pretty much 100%.
And that's the the staff that we've already hired plus the assistance chief that we've already hired.
That's all that's done.
That's correct.
Thank you.
And that's for the full year, Mayor.
That's for the full year of 2025.
Full year.
Okay.
Thank you.
And none expected for next year, correct?
Out of that.
There is one position uh on the books for 2026, but we can have that discussion as we go into 2026 deliberations.
And so the e com uh is understandable.
Thanks, Paul.
I think you went through that, uh, Scott.
And with the e com as well, can you just confirm that there was another police officer the council had already been uh approved of commencing this year?
Uh there is no additional police officers added this year.
Uh last year we decided to add one to bring us to a complement of 14.35.
Um based on the cops to pop ratio.
We don't expect another police officer for a few more years.
Okay, and so the and and and but there was an increase to support staff or no?
Um there was about a seven and a half percent increase per officer uh cost for the RCMP.
And uh due to the sharing we do with Langford and Callwood and now Machosin as well, there was a new formula derived for splitting the costs of the municipal support staff.
Um council agreed to uh pay our fair share back in November or December of last year.
Um so I'm not sure how many uh municipal support employees that will relate to, but it's it's basically a a percentage share of the entire cost of the rule of clerical support.
Thank you.
That's all the questions I have, Chairman.
Councillor Manson.
Thank you.
I've expressed concerns over the years that we keep adding and adding and adding and we never look at the services that we are providing on whether there are savings to be achieved.
And I see this year we're adding 1.4 million dollars that's added to the taxes and will be carried forward forever.
Uh so 11 and a half percent increase and we will do something similar next year.
It might be a smaller number, but we continually add, but we don't ever subtract.
I know some of our residents think that we have great services in View Royal but they're really expensive at times.
And so I my question is have you looked at where we can make cost savings and reductions in services from what we currently provide?
Well, as you know, Councilor Mattson, it was a bit of an expedited budget process this year, but it it's important to have an ongoing service review for all of our expenditures.
So I would say one thing we're looking at this year uh is our contract with VIC contracting.
Um we provide the most amazing boulevard maintenance services.
Uh I think are the envy of the CRD.
Um but based on uh based on a recent quote, um we we may not be able to afford that.
So council's direction to staff has been maintain service levels.
Um we we got that loud and clear last year through the budgeting process.
So this budget is based on maintaining service levels.
Um if council would like us to look at changing service levels, we can um create a list of low-hanging fruit and bring bring those recommendations back to council.
I thank you.
And I I guess my comment is to my colleagues.
It's never ending, and maybe we should start looking at low-hanging fruit and the types of services we provide.
That's Fit Brown.
Just a quick comment on our fire service.
Uh kudos.
We had two calls for service to our residents at 199 Atkins.
Um as usual, you beat the ambulance, which I'm not downplaying the ambulance service.
They I know they're just have staffing shortages, but it was really impressive to see the chief and the deputy chief attend.
And for a change, it wasn't me you were coming to see.
So but but thank you for that.
And he's back home.
The fellow you took, he's back home now.
Uh Councillor McKenzie.
Yeah, just just a comment.
I I wanted to echo what Councillor Mattson was saying.
We just need to look to you know, provincial government.
They are not increasing funding, they're reducing funding, they're not staffing, they're not doing things like that.
And um, I'm sure the same thing is happening at the federal level and across all um governments, levels of governments.
So I think it's only fair that we also look to see where we can um reduce some of that impact on our residents because you know, the if you're talking about the stock market, things are just going to increase and we need to prepare for um not a great time ahead financially.
So thank you.
Councilor Roger.
Um it's one thing that we've we've identified that we want to maintain a level of service, but if the cost of maintaining that level of service, that seemed to be a great idea when we had lots of money.
And now, if I've heard uh correctly, the um the roads maintenance contract may be uh uh considerably more.
So I I think it's it's something in a lot of um residents have said um, you know, when the you know, the flower beds and so forth, um, it may be time to really start re reevaluating that level of maintenance and uh to um a scaled-down version that um would still be adequate, beautiful, but not as costly.
So that um I I went do we know when the next uh roads maintenance contract is coming due?
Ivan.
Thank you, Madam Chair Ivan Leoung, Director of Engineering.
Uh report, we're endeavoring to get one to council at the next council meeting.
Um kudos to Ben Lubertz, who's been working with Victoria Contracting on that contract and providing with myself and um Scott Somerville with numbers.
At this point, the contract will amount to pretty much the same as what you see in their budget.
What I mean by that is that uh staff have been doing estimates over the last few months as to what it could look like.
Uh we have asked Victoria contracting to sharpen the pencils a bit.
Um we're only out of probably a 1.8 million dollar.
She scratched that, but basically, there's only going to be a point zero or 0.3% increase to uh our transportation budget.
So there's only been a $5,000 difference between what you see in your operational package and what our contract is.
There's been several numbers going along.
This is the most recent numbers that we've gotten.
So it's pretty much on par with what we have estimated right now.
That said, it's a five year contract that we'll be presenting to council.
And should council wish to for us to explore other options, we can certainly do that.
Contract is expected to expire in May, though, so time is kind of the essence, which is why we want to present this to you on the ASAP.
And so that that'll be coming to us soon.
Yeah.
Okay, thank you.
Um if I may another another point that um uh yeah, I appreciate uh staff raising at the report is um the level of DCCs and fees and so forth from construction, as we've obviously seen in the monthly the comparisons uh year to year, uh, it's been significantly decreased.
Do we have a sense of um or a budget projection of what um reduction of um fees and services and DCC contributions from developers are likely to occur from the difference of two thousand last year to this year?
Any projections of reduction?
Uh Madam Chair, so DCCs are predicated predominantly on master planning.
So the soon the sooner that the town can get started on updating its master plans, the faster it can update its DCC bylaw, which as you know it's uh coming up in their five-year plan.
Uh we have generally uh provided increases um based on CPI, which is uh through the local government act we're allowed to do that, but that's as far as as we can do in terms of increases at this time uh until council adopts our future master plans.
We do have uh two this year and one next year.
Okay, so that I I guess that's um we were getting um maybe that that table and that showed us uh a simple one line color graph of you know one year after the next, and and we were doing reasonably well.
But um I guess I wonder how much less we anticipate we're going to receive, how that's gonna be spread, what those number those um those amounts typically went into and you know have we anticipated that and is that anticipation reflected in this budget increase what is reflected in the budget increase is the reduction in permit fees so that can be extrapolated um to the fact there there's not a lot of development going on in 2025 we shouldn't expect a lot in DCCs and and those typically go into reserves and form the pool of money that we draw from to do our capital projects.
So, you know, depending upon how how much is rolling in for DCCs and what the list of projects is that Ivan is speaking about will dictate how those DCCs are used in the future.
But I I would anticipate, I would expect them to do the contributions in uh DCCs to decline over the next year.
And on the same point, if I can, with uh Council McKenzie raised a good good point.
The province is scaling back, and we all know that the provinces canceled the gas tax.
They're cheaper at the pump, but that means we gather less revenues.
And so the um the gas tax contributions that municipalities will receive, and even though it's through UBCM, that's not a certain certainty anymore, is it?
Do we know when and uh how much that is likely to decrease if the provinces broke the bad news to us?
Uh we have not heard anything about a decrease in in uh gas tax.
Um can't guarantee it won't happen.
But uh I will state that unlike other levels of government uh municipalities um have to have a balanced budget.
So we we don't find ourselves in the same situation as the federal government or provincial government.
Um we're we're legislated.
I would say luckily we're legislated not to spend more than we have, and and so we don't have huge debt maintenance costs.
Um they're actually quite quite low in V Royal.
And hopefully we'll be insulated um from those impacts, but um hard to predict right now, isn't it?
I guess it, yeah, and it's also when looking at that gas tax column, well, which we have always taken for granted.
There's always going to be what half a million each year, no problem guaranteed.
Um, but uh I I think we have to think about um the uncertainty that it comes that comes about.
Um yeah.
Yeah, that would be a curious to see.
Okay, thank you.
Oh no, one more question.
One more question.
Um I'm trying to figure out the five year estimates of tax increase of it's 11 to 12 this year, how much next year, how much next year, how much for the five years.
Do we um do we have a breakdown of that?
I do not have that information here.
Because I'm wondering if we were going from a twelve to say a seven percent in the following year, would it be of strategic uh consideration that we might want to go half and half one year to the next?
We do show on page fifty-six of the report, um we do show a seven percent budget increase uh in twenty twenty-six, seven percent in twenty twenty-seven, six percent in twenty twenty-eight, five percent in twenty twenty-nine.
Um that that can be diluted by non-market change, which is new construction, um, but that is the total amount of taxation that we require to maintain the levels of service we currently provide.
So I I get I'll ask the question, knowing if, and thank you for the information.
If we're going from a 12 this year and we got a seven projective for next year, could we shift some of the uh projects to the following year to um uh keep it under 10?
Well two two things I I need to correct there.
Um the tax increase is not 12 percent.
Uh we're currently looking at 11 and a quarter.
Um and shifting projects does not reduce the tax burden.
Um contributing to the reserves reduces the tax burden.
Um so if we contribute less to the reserves um we push a problem further down the road and create an infrastructure deficit for future councils uh thanks and just um for colleagues i i know we've discussed service levels and reviewing those which i think we should do on a on a course but we've got to be a lot more specific than that like what services are we actually talking about what do we want to see done.
I think it's perfectly okay for council to go to staff and ask for uh a a staff report on adjusting those service levels and what it would actually look like as far as cost goes.
That's one thing as a council we have and we haven't done yet this term anyway is saying and I'm not sure Ivan if we're talking about boulevards does that come under parks or does that come under road maintenance?
Does come under road maintenance, right?
So we got to be specific about it.
We obviously don't want potholes like Montreal, but we might want to revisit boulevard maintenance, right?
Or whatever.
So as long as we're specific about that or give staff options to go uh to to deliver for us.
Um so I I'd be happy to second or or or move a motion that staff generate a report um that that is a review of services so uh council's informed on on what that looks like so uh our decision making would be our our current level of services if we consider that high um what would the impact be at a medium level of services means no flowers and I guess low would be putting astroturf like Langford on Oliver Boulevard uh which there's now weeds growing from um which needs maintenance so I I think there there's if we we just need to to make a motion for staff to come back so that uh in in in a way that council can make a decision on service levels, and if it's anything specific, then we could do that.
Councilor McKenzie, to your point, it could mean what what would the impact be if we didn't mow the first time in a park until I don't know, June, you know.
Um some of those things that could provide not only savings but might have some other benefits.
But I'm happy to second your motion that you were just referring to, which again to my mind would also include staff's opportunities for low hanging fruit as well as drops in service levels.
So if that's what you're looking at, that's your motion for, I'm happy to second it.
Yeah, and and I would that be for this, probably not this go-around, right?
Because we're kind of tight to get a staff report on service levels and have to make a decision by May, but that could be further.
But I we'd have to go to Scott for that to see if it was even viable for service levels.
I'm just maybe the low-hanging fruit ones they could pick out as for this year and maybe next year look at the service levels.
I'm I'm I'm cognizant that we're um talking over the chair, and that's never a good practice.
So was that a motion?
And did you let you now I can phrase it as one chair?
Okay.
So the the specific motion would be for staff to generate a report on service levels for council for uh in two parts.
One is for this fiscal year for anything that might be possible, particularly with contracts coming up, and number two, a more fulsome report going into next year for service levels for council to decide on.
Okay.
Um questions.
Council Brown.
Well, personally, that's just me.
I'm a retired police officer.
So to me, no call too small is important.
Whether it's police fire, ambulance, it doesn't matter.
People call and they want the service, and I uh I don't hear complaints from people.
I hear people say there was a pothole.
I called an engineering, well, not engineering, but our contract was out and prepared the pothole.
Um, I wouldn't want to start seeing this prioritizing calls.
Um, I know they did that in Burnaby, prioritizing calls.
And uh guy wrote a letter to the editor of the newspaper said, you know, they should have a contest in Burnaby.
Everyone gets their complaint put into a hat and they draw one out of month, and then again an investigation.
And that's the last thing I would want to see.
We have good service, we have good staff.
Um, and as far as I know, our contractors do a good job as well.
Uh uh it's great.
You want low-hanging fruit, maybe we should take a look at um counselors' expenses.
I wouldn't want to be, I won't name the municipality, but you know, when you have all seven counselors going to AVICC, UBCM, uh, some going to the federal one, and people see that, and they are pissed off when they see that.
And there's no need.
We have no policy.
There's nothing to stop all of us from going to ABICC, staying in a nice hotel room.
In fact, when it's UBCM is here, you bet some counselors, I'm not going to name any names or count councils, some of them are going to be staying in a hotel, even though they have a house right here.
So low-hanging fruit, that's a good one to start at.
It it is, although you um you're right to to suggest it's not on this council.
No, it's not this council.
Right.
Um, who is next?
Council Councillor McKenzie.
Uh, just two comments on uh I think what Mayor Tobias was speaking about.
I do think some of the reductions could uh relate to this year's budget.
I know in again, different levels of government uh we've said here's our target reduction.
We want to reduce it by one percent, and then let staff figure out how they would meet that.
So that's uh and obviously that they might not get to that, but that's the goal, and they could um do that for this year.
And then um the other thing I just wanted to um touch on around you know, our levels of service in that survey in the report, you know, most of them are extremely satisfied.
And while that's great, we are a public service.
And how many other public services do you know are consistently getting extremely satisfied?
Um, so again, that's great to hear, but I think that's you know, we can we can um lower that service level to just satisfied.
Thank you.
Um there's room.
Councillor Rogers.
Speaking of the motion.
Um so I I I agree that um um we should be looking at uh the um particular road service maintenance contract that's um staff are going to be bringing us to to us very soon.
I would be very keen to hear uh since that report is coming to us, that we break out and understand the costs of the boulevard maintenance and to be able to in that um um avenue uh be prepared to negotiate for a um uh a lower standard of of maintenance because we're gonna have different plantings.
We're gonna have ones that will be a lot less labor intensive and still giving the the town uh a good um good look so um and uh to to councillor brown of course um dealing with safety issues like potholes obviously we would expect that to continue and snow removal and you know all those um important things but the um the beautification thing has to be reevaluated and i would appreciate staff coming back on that report when it comes to us to itemize that out and see what that costs so we can be informed ourselves as well as the public.
Thank you.
So um let's vote on the motion.
All those in favor of the motion to for a staff report on services.
Motion passes.
A question to staff and and my colleagues and this just to guide me here as chair uh we have we have several projects um associated with the financial plan do do we staff do we um colleagues um wrap those into the the um staff reports a one.
Or do we vote on the um staff recommendation that staff prepare the financial plan bylaw for consideration?
Thank you, Chair.
I believe what we're trying to accomplish tonight is have each of the directors present the new projects in 2025 and the new projects in 2026.
Um kind of the spirit of no surprises.
Uh a lot of these projects you've seen before.
Um, but we really wanted to focus on on the projects council hadn't seen yet or had changed.
So we we've sort of uh arranged ourselves to uh make director presentations and we would uh I guess we were hoping council would um what what uh Sarah Jones calls a negative billing option.
If there's a project in there that you don't want on the list, um, you know, certainly raise a motion at that point and and we could we could remove it or modify it.
But it's it's fairly pared down already.
And uh I like to think there's nothing on that project list that will surprise council.
Okay, great.
So once we've seen heard the the staff project um uh proposals, that at that point then we'll vote on the financial plan as a whole.
Yeah, we're we're seeking direction and recommendations tonight.
Um ultimately uh we've got to go away and and develop a uh bylaw, um and that will ultimately be uh council's final say on the financial plan.
But um we're we're really seeking guidance here tonight.
Okay, so then can we move on to the projects starting with still have a question?
Go ahead.
But you were first.
You were you were first.
Uh I I think there's an a number of ways we could do it.
We could go through this, but um just for my colleagues, if we want at the end of this to turn to staff and say we would like a a uh tax increase of no greater than X after we hear everything, please give us some options to reach X uh in a report that would come for a meeting next week, Scott.
Am I saying that right?
Uh that report is before you this evening.
So if council would like to set a a target for taxation um we have a few recommendations that director provided earlier um and and keep in mind that projects do not affect taxation so um this is more about uh the the merit of the projects themselves as opposed to any perceived impact on taxation but certainly setting um setting a uh tax rate that council's comfortable with is is a good way to go about it and and staff's recommendation is we can borrow from prior years accumulated surplus to balance the budget.
We don't want to do that every year um it it's kind of a rainy day fund, but it it's uh it's a way to reach that goal of taxation without disturbing the budget too much.
Thanks, Scott.
And I uh j just for my colleagues, I think we were a bit overzealous last year of cutting deep into capital projects that didn't affect taxation at all.
We just got on a bent and started doing what we could to save things, and we got all wound up about saving money where it probably didn't affect the the operate or the operational budget, which is really our taxes.
So I council can do as it wills.
I'm not supportive in postponing or shipping problems to the future of us doing a project because it's uh out of casino funds or or reserve that if we don't do that, then it it will cost us more next year as we're seeing now cost of construction or building anything is not going down.
So if we're deferring something, then all I'm saying is we gotta be prepared to pay more later.
Uh and if it's not going to affect taxation, then I would uh need strong justification to support uh putting off a project that in the end we've asked for either through a master plan or some sort of other planning.
Thanks, Chair.
Council Swimetsk.
So one of the concerns I've expressed over the years was the amount we spent on consultants year after year after year.
And one of the things I'd heard was we need these additional staff, different increased staffing levels because it's going to reduce our uh the amount we need to spend on consultants.
And uh I still have concerns that the number of dollars I see spent on contractors, even in this budget.
So I I guess when staff go through these, if they could take provide comments on why staff can't do some of these and we have to hire consultants.
And I'm all for when we've actually have a grant from someone to spend that money doing a project.
That's fine.
But you know, it may be from casino or or from another pot from the town has, but it's still the town's money that we're spending on consultants.
And in general, I'm I find that very frustrating because I think we've got a lot of staff and maybe work can be jigged around so that the work can be done by staff as opposed to the consultants the and the other thing i heard from staff was sometimes we have too long a list of projects whether they be capital projects and staff just can't get to them all in a year so it'd be nice to actually see whatever the list is prioritized on the things that staff feel that absolutely have to do this year versus those that can be delayed just because some of them might not get to anyway but they're on the list and they can be pushed back uh and they may be pushed back just because we don't have time energy or staffing resources versus we're trying to just save money on projects okay counselor routers then we can perhaps so uh just point a clarification in uh the presentation there was uh there's an eight million dollar surplus uh where have we put that and how we use that so far that is a portion of the 50 million dollars i referred to in uh in terms of the end of 2024 it's not committed it's available for use for general operations.
It's not not committed in this budget at this point.
Thank you.
Yeah and and to uh uh council maxie's point um um, I see we have a number of projects, but what impresses me is that we are having to update all our master plans.
And I really respect that, but uh updating those master plans.
But we are saying we've got projects we want to do before we update the master plans, but maybe if we do those right now, the uh master plans may have said, no, you don't need to do it, or we could have been more efficient in having that opportunity to get the community public their response and feedback about a particular project, as opposed to investing, you know, in um 12 different parks.
So that's just one of the things that I'm thinking, I'm seeing here.
You know, I see the projects, I see what we're spending now.
Could we do those before or after those master plans?
So that'll be the point I want to focus in on today.
Okay, so what's your pleasure that we move on to the projects now?
Good.
Dr.
Taylor.
Good evening, uh Chair and members of the committee.
I'm Leanne Taylor, the Director of Development Services, and I will be presenting on three new projects that are coming forward in 2025 and 2026.
So if you I hope everyone has their draft financial plan.
So I will take you to the first summary, project summary, which the number is N-083.
The project name is Secondary Suites Online Renewal.
And this project council considered a few years ago with a project budget of $25,000.
And the purpose of this project is to allow type 2 secondary suite permit holders to renew their permits online, similar to how we do that for business license renewals.
And there is a desire with our ever increasing online world that the community is seeking convenience of interacting with the municipality in an online format.
And this will also help streamline and reduce the amount of staff time that is involved in doing manual renewals of 244 type 2 secondary suite permits on an annual basis.
Back in 2020, the project budget was 25,000 and we were able to reduce it to 5,500 because a lot of the work was done in-house and then it was put on pause.
However, we do need a consultant to help us get it to the finish line.
And this proposed funding is going to be uh sourced through casino revenue.
Um Leanne, would this be a standalone this or would it be linked in?
There was another project that that encompassed, well, what did it encompass?
This will be a standalone project.
Okay, thank you.
Yes, thank you.
Um in this binder here, um, the one that we received, uh, there was a N130 and a C 185, both of which, with respect to uh this this uh project, permits and licensing portal.
So, you know, I've got one and both were the same amounts of money in year one, year two.
So does that mean that we're going to spend um 440,000 this year for N130 and 40,000 for 185?
Through the mayor, they are both, or through the chair, they're both separate projects.
And so the secondary suite renewal work was done by the town in-house several years ago, but it was put on pause because um there was a thought that these permits are not licenses or not licenses, and so we don't want to treat them as licenses in terms of um renewals, but we're just we're not talking about the type of is it a permit or a license, we're just talking about the ability for our residents, people who have type two secondary suite permits to renew their licenses online instead of coming down to town hall to renew.
And we've done this, we've done a lot of the work has been done.
We just need to get to the final stages and getting up and running.
Okay.
Um, I'm not making myself clear.
There is a N130, which is the permits and licensing portal.
Then there is a C185, exactly the same title, exactly the same cost.
Or are there is it is it uh so that's my confusion.
Why is it in the N?
Why is it in the C section?
And um are we actually going to be paying 80,000 in year one or 40?
Um there's two separate projects, and so I will get to um uh N dash one hundred thirty and C dash one hundred eighty five afterwards.
Okay.
And um the reason why it's like this is because well let me uh the there are two separate projects, so I d I don't want to I don't want to muddle the two of them.
And that that was my question, um Councillor Rogers, and she's you did say it was stant away.
Uh council McMurdo.
Excuse my ignorance, but what is a typical fee cost?
The renewal fee is a hundred and fifty dollars.
And um is it safe to assume that now the provincial government's pushing more secondary suites, carriage homes, et cetera, et cetera, et cetera, that possibly the revenue from that will go up?
The um council may recall back in 2023, staff brought forward a report to um get rid of type one secondary suite permits because these are secondary suite permits that comply with the BC building code, and we're just we're double dipping and we are creating more bureaucratic bureaucratic process um um for for secondary suites, whereas uh type two secondary suites are ones that do not comply with the BC building code.
So back in 2007, I believe when counts when council approved the secondary suite permit policy and bylaw um at that time people in the community who had uh secondary suites that were that were built um likely not with permits um were able to keep those provided that they keep they apply for a type two secondary suite permit and renew it annually and it basically it's it's to um to to protect the town of of any of any liability of something that were it ever to occur in these these secondary suites so and it's also important for renters to know that just FYI the suite does not have a uh building permit and of course with the system it would give staff time to do work and other other things right any number of things correct there are staff spend a lot of hours dealing with um sending out secondary suite permit letters um through our mailing system where we could just make this all digital right and the mailing system would cost about five thousand a year as it is yeah I'm not sure how much it costs do we have a motion to um approve staff recommendation oh director jones i i would suggest that um as we we could just do the negative option billing which is things can stay in unless they come out if that would be acceptable to the committee yeah okay so it stays in yeah does that mean someone needs to ask for a vote if they don't like something okay next.
Thank you, Chair.
The next project summary is n 130 permits and licensing portal.
Or C one or C 185.
Yeah.
And I'll explain why there's two.
Yeah.
Yes, C-185 and N-130 are the exact same project summary.
The reason why they have two project numbers is that in year one, uh 2005, the the funding source will be uh casino revenue.
And uh the second year it will be, well, they're both be, pardon me, um yes, so it takes uh casino revenue, and then into the future it would be uh capital.
So let me explain what this project summary is about.
So in the 2025-2027 IT strategic plan, the development services department identified business goals, barriers to achieving those goals, and strategic initiatives to overcome the barriers to provide a high level of customer service and processing building permit applications, to support building inspection services, which are crucial for maintaining health, safety, and compliance with the town.
A building permits portal has been identified as a strategic initiative to significantly improve business value, workflow efficiencies, streamlined application processes, and customer service.
Furthermore, a portal will make it easier for the public to request, submit, and pay for permit fees online to eliminate the need to visit town hall in person.
This project would be undertaken in two phases.
So the first phase would be exploratory, so in 2025.
And what this would include is looking at the building permit workflows, the context, integrations, and processes.
We'll undertake a thorough requirement, thorough requirements for elicitation with all stakeholders.
And then we will review modern web-based software services and carry out a cost benefit analysis to determine the optimal software to meet the stakeholder requirements.
So that would be the first phase.
And then phase two would be to develop a portal.
So that would be in 2026.
And this would be funded using casino revenue.
Yeah, I'm just gonna if you don't mind.
Um this would be residential, largely commercial, but it wouldn't it wouldn't apply to developers.
Am I right?
This would uh apply to building permit applications, and so all building permit applications as well as plumbing permits.
Uh it is a it's it is a very big project.
There are other municipalities within the region that who have started this project, it's a multi-year project, um, to try to get uh your the workflows into a digital format, into a digital application format.
And so again, it's to improve workflow efficiencies.
This is the way of the future.
Uh there are a lot of different uh software options out there.
Um the province has also is also establishing a portal.
We have met with them and unfortunately um their portal is is used um on a different um with Tempest, and we don't have Tempest, and so but there's other options out there.
Honey, anyways, it's a uh a way to um improve workflows, business values.
Got it.
But my question was it excludes development permits, simply building permits.
Currently, but we're hoping in the future that it will incorporate um development applications.
Um it is easier to start with building permits, uh, and there's a lot, building permits are a lot more um involved, and there's a lot more documents going back and forth uh through the building permit process and inspections, and uh it will make our building services department uh a lot more efficient.
Thank you, Leanne.
Yes, thank you.
Okay, now I understand it one one is the um uh capital and the other one's the operational right and um it it kind of confusing that there would be the capital in year two when the operational is year one consultant to do with the operational is that a consultant it's a consultant that is correct we will we will require consultant to assist us with this okay project so this is then um the consulting and then the implementation correct uh huh-huh.
And thereafter it uh falls under taxation as is as an ongoing maintenance or whatever.
I will have to refer that question to our director of finance.
Okay.
It would, yes.
Thank you.
Okay, thank you.
That helps.
It would be helpful, you know, for um it took a while for me to grasp this, but um, yeah, additional words were to help me along.
Thank you.
Yeah, so again, my frustration of having to hire a consultant.
Uh the other part I don't know is like how many of these are there a year and what what's the cost of processing now versus what will the savings be if this was implemented?
Like is the town gonna save money, is gonna keep us from needing to hire somebody else, uh, or if we're already currently doing all the building permits and plumbing permits in person.
Um what's the benefit to the town for spending 90 000 and will we make that money back through the uh through the chair i i can't answer the question if we're gonna um get our money money back that's kind of a a loaded question um but what i can say is that uh our processes are very manual and take a lot of staff time and there are other projects that it would be great that staff could work on, but they just don't have time to work on it because we we deal with because our processes are quite manual.
Um when we look at our mailouts, when we're looking at um our sending out um notifications, when uh there's back and forth between the applicants on the different applications.
And so uh it's it's a way to improve customer service, um streamline the process, improve efficiencies, and um and also um protecting our records as well as we move to more of a dig into the digital world.
So McKenzie.
Yes, so you mentioned the provincial governments um system that they've been developing.
So I I don't know a ton about it, but I have heard about it, and it's part of the, you know, the province's goal of expediting, you know, development and and the housing targets.
Um so I was wondering, do you know would there have been a cost if we had gone with their portable portal?
Or the province is still developing their portal.
And again, it it's it wouldn't be compatible with our our software that we have.
It's comp they've been working with municipalities who have Tempest.
And so I have met with the province on on their portal to learn more about it.
They're in the sort of the infancies of it too and they have they're piloting it with other municipalities.
And it's it's um but it's it might not be sort of a one fit, you know, it uh what is the word I'm looking for so uh sock can be it might be not a one fit all like it's that's not coming out right but it it might it as part of our exploratory work we will look into it a little bit further but at the same time too they might have a long I don't know what their time frame is go ahead um yeah sorry I I'm not sure what Tempest is but um I just know like they're probably going to be continuing to look at it that portal and whatever they're doing is going to continue to work and and I wouldn't want us to lock ourselves into a system that um in the future might not be compatible with additional um things that their system can do.
So for instance if they move to a thing for prefabrication and in the in their portal you can have the measurements that are uh in line with our bylaws already set up in there and that's something that the province's system can do in the future I wouldn't want us uh to be with a system that we couldn't benefit from that in the future so I I would probably want to align with the provinces system if we could it's really hard to it's really hard to say um again we'd have to do like um the first the first year is is exploring the different the different options out there and uh I I I can't make assumptions right now because there's a lot of work to be done.
Um Leanne, my struggle with this is that there's there's months when you report to us on building permits and it's like a deck, and that's all there was.
Um there's so few building permits come our way, and and uh you know, granted I don't know all the work that goes on behind it, and and we do have a small staff.
Um that you know, sometimes I'm surprised at how little building there is in this town.
That's all.
That's all I've got to say about that.
Council Brown.
Just a comment, uh t tempest is amazing.
Is that what you're gonna use, Tempest?
No.
No, we don't have that.
Okay, because uh that's what uh that's what C or D uses for uh dog licensing uh file uh for electronic files um system and uh I know the revenue increased dramatically when they use that, but anyways, if not using it then as a moot point.
Counselor Matt.
That's a quick one.
Do you Scaff have the skills necessary to do the work that the consultant is gonna be hired for to do?
No.
Um Mayor Tobas.
Everybody's chiming in, I guess.
Um uh I've just got uh uh one point, and I uh similar to the um comment that Councillor McKenzie had, I'm really supportive in you digitizing and being able to offshore some of the boring stuff off your desk and getting on to meaningful work.
I think that's important.
Um, but I don't know how you would build this for the amount that you've got for $90,000, to be honest with you.
Um that's specific to View Royal, the same with um the next project.
My concern there is that um we'd greatly exceed that and then probably look at operational, what's the total cost of servicing that over a period of time?
I would be really supportive of looking at combining um this into something that we could work with other communities on, like um surely Langford or Callwood or Sanich has a system that's online and does everything that uh they need to do that could create some efficiencies.
But are we able to replicate some of the work that's already been done or are we creating a bespoke system for VROF?
Um so the places uh so Sanaich, um actually Sanich is one of the the pilot the is part of the province's pilot project, but they also have uh they have tempest.
Uh Victoria has Tempest.
I've you I've I'm I you've I've used Tempest.
Uh Langford does not have Tempest.
Uh Central Sanich as well, they also have Tempest, and they're also doing this work right now as well.
Um that I'm aware no, uh they have a different, and uh they are also working towards um having uh an application portal as well.
One more question.
Operational costs.
I mean, I've seen us put systems in place where we then have like a 10 or twenty thousand dollar a year cost to maintain these and keep them up and running.
And so do we know what the operational costs for whatever this is, if and when it's created would cost uh we do not have that information yet.
It will really depend on um the results of the phase one of exploring the different options out there and those costs and how much it would be to build and making sure that the software is compatible with our current software that we use in in in the finance department.
Okay, um colleagues keep it or drop it.
Well, I'm not feeling warm and fuzzy, so I'm happy to have a vote.
Okay.
Yeah, I I would I'll I'll toss this motion out there, colleagues, and see if there's a secondary.
I for this one and for the next one, and maybe even including the permitting thing that we didn't have an issue with.
I would be more than happy for staff to come back with uh an options analysis uh for us that might be a little bit of money, right?
To look at options that might meet staff's needs.
Um, but it's an overall how we're gonna blend that into total cost ownership to your point, um Councilor Mattson.
Like what's it gonna cost to maintain over time some of these questions and how compatible might it be with the province?
So I I'm I'm not suggesting that we don't need to do this.
What I am suggesting is if we're gonna look at this and probably look at a greater IT project, then um let's get some options analysis for the sum of things we need.
So um I would be in support of not supporting these, but uh have staff come back and replace it with an options analysis that would fit in with their system if I could get a seconder.
I'd be happy to second that especially if it includes seeing if we can work with other municipalities.
Doesn't make any sense that each of us goes and creates our own system.
All those in favor of um the motion for staff to develop an options analysis disposed motions passed.
Just to clarify, is that an option analysis with um that we do in-house without a budget or how I'm I'm not totally clear.
I I was thinking that there if you came back to us with um we would need a consultant for an options analysis, it might cost some money to do it, but it would probably uh working with director of finance and the uh CAO look at the sum of everything, like would it make sense to move to Tempest or whatever?
But yeah, I would come back to us with a dollar amount that what it would cover and that would might be uh a thing.
That's what I meant.
Council Brown.
I'm certainly not an IT specialist, I'm not a salesman for Tempest, but um to me it it it it it it potentially uh it's it's basically off the shelf.
So I I don't know have you even have has it been considered or even looked at?
Um we're not considering changing our accounting software.
We were on our third director of finance in the last six months.
Now is not the time.
I'm just hoping we can be a little more binary about these projects and just a a simple yes or no will work.
We don't need to problem solve and come up with options.
Um we hear you loud and clear this project will be shelved for for the 2025 budget, and uh we'll move on to the next project if the chair sees fit.
Director Jones.
I just wish to seek clarification.
Is that C one eighty five and n 130 okay one is one is getting the contract consulting the other thing offer and going to think that you have probably one follow the other so effectively we're shelving it for now got it okay so the last project summary that i'm going to present this evening is the parks and trails master plan n 129.
The town's 2023 2026 strategic plan contains a goal under Strategic priority A, Enhance Livability, which states the following Goal 6: sufficient and appropriate parks and open space.
To achieve this goal, the work plan includes two projects: update the parks master plan and develop a trails master plan in 2026 and 2027.
This is stated in the strategic plan.
Given the interconnectedness between parks and trails, it is recommended that the town develop a combined parks and trails master plan.
This plan will guide the future of the town's parks, shoreline accesses, and trail networks, and ensure they will reflect the evolving needs of the community, promote active lifestyles, and protect the natural environment over the next 10 years and beyond.
This would uh follow the OCP review and update.
Combining the two projects will likely save the town money because we will be doing engagement on both.
Engagement is a huge uh cost, and uh we would likely um do uh do that in-house, and um it makes sense to do both concurrently.
So this project would uh start next year in 2026 and uh be completed in 2027.
But I'm speaking to it because uh we're talking about our first the projects over the next two years.
This project would be funded under our local government climate action program.
We have LG Cap money that must be used up by a certain time.
This is the perfect project for that because it'll have a climate focus, and um it will also be funded with casino revenue.
Thank you.
Thank you.
I fully support uh what you're proposing.
But my question is that we have, and as we've identified in the uh staff's report uh on the front, uh we've got a um this parks master plan, we have a Helmican Centennial Park Master Plan, we have a View Royal Master Plan.
So is and and one of the things that concerns me, but the Helmican master plan is happening in the same year, proposed year two, um, yeah, as this one right here.
Could we there would be an uh and because everyone's gonna be coming together, everyone's using the same parks, we don't have a uh you know, a lot.
Is there any um rationale to separate these three parks into separate plans with the um through the chair?
No, the town, it's important that town has an a master plan of our park all parks and trails in the town.
Um, you may recall um by considering the Halkin Centennial Parks Master Plan, that is more of um a detailed getting into the weaves, we weaves, weeds uh master plan.
It's very specific.
Uh whereas a parks and trails master plan is a bit to a certain extent more high level in terms of policies.
Um, but um a master plan gets down to the details like where are you gonna put a plague around?
Where are you, you know, where are you gonna undertake some greenshores work where it gets into the specifics?
Whereas a parks and trails master plan doesn't get into the the design of a park specifically.
So they are two separate projects.
However, you make a really good point, Councilor Rogers, is that some of these parks projects, there's um going to be quite a few of them take place in 2026.
Um some of these have been um in the in the strategic plan for a couple of years now.
Makes sense to complete them after the OCP, and we'll be able to combine engagement on them.
So we're not reinventing the wheel multiple times, and so um we don't get engagement fatigue.
But um it's it the both projects are separate, um, but we will there'll likely be some synergies between the two as well.
So if I if I can just clarify or understand, you're suggesting that um we carry on with the Parks Master Plan, because it was 2017 and pretty old, uh, but we would probably leave the Helm to uh a subsequent year after that.
Uh no, it's in the budget for the Helmkinson Tennessee Parks Master Plan to um to be um kickstart in next year in 2026 as well.
Um, because again, we're looking at the whole town.
Um the Parks and Trails Master Plan is looking at the entire town, um, not into the the the details of a specific park.
And uh again, uh this is also comes out of the strategic plan as well.
Okay, thank you.
Good to keep it a question another question yeah so did you say two questions one of them did you say it was being done in house and two what are we getting for what's that cost of a hundred thousand for no we're not doing the master plan in house uh we'll be doing the similar to the OCP we would likely do the engagement in house because we have um the entire we have a team um but when you do a parks and trails master plan there are um uh and who knows if you know if council wants to um hire uh a temporary you know to someone to has a park background to to do a to do um to work on this plan in-house um on a temporary basis that's something that we can definitely look into but um no the it's um it's a fairly large project and um we we would be looking at consultants um for for that in uh this isn't again in in 2026 okay thank you so for me it's a lot of money and I'm not sure what we're getting still so I'll have a motion that probably won't go anywhere but I don't want to do we have a secondary I'll second it.
Okay.
Any discussion?
Do you want to motivate?
Again, it's another $100,000 worth of consulting money.
I don't know what how better off we will be at the end of this than we currently are now.
And so because of that, I'm reluctant to spend the money.
Yeah, and I um unfortunately I don't think we're going to be expanding our our parks in any way.
If anything, the land is getting more scarce with the developments.
So I'm not sure how uh, as Counselor Matson said, the value to review and and do this, what is the uh additional value that residents and us get from that?
Um, I don't see it given that we're not expanding our parks and trails.
I'm gonna speak in favor of it mainly because we do have park land that is undeveloped, that's a little road.
We've got the largest density densification that we've ever done right next to it.
We do need a plan, right?
Otherwise, people will be using that piece of land for whatever they desire to use it for uh without a plan, without any support.
And I think as we densify, our parks are gonna become that much more important to us.
Um, you know, my my question uh that I get frequently is balancing out not only the dog parks, but also children's play areas.
I I don't believe it's the responsibility of developers to put those things on what limited land they do have available uh for us.
So I think I think we do have an obligation to look to the future on this one.
And I think if I had a heuristic that was guiding me, it's saying don't cut anything that's forward looking that's possibly gonna cause us problems down the road.
I think having a plan that we could get is is important for uh our planning is just as important as the OCP to ensure that we do that.
I in my mind I question um how what is our balance for park space um proximity to that park space with new developments, right?
Are we being fair about it right um you know even to something like land banking or if land does become availability we've got a very high density area council should at least be considering um you know uh with that development uh the purchase of of land next to us for green space so i i i'm supportive of this um i think uh it says it's it's view royal we're about parks and spots and uh i think we need to look to the future with our densification to balance that it thanks chair.
Councillor Rogers.
Yeah i i speak in favorites well.
Um we have um had uh a number of trail projects and and thank you very much for putting trails and embedding this into the plan.
Um we made a huge mistake um um when we were doing back in 2017, we took trails out.
It was a really dumb idea, but we took trails out.
And I think it was because we were frustrated with the limited funds and the limited skill sets of our consultants to be able to handle the whole concept of trails.
So um uh we got what we paid for.
Um but uh indeed um you know the the whole high high level of you know, like the little little road.
We could do a local plan, but this is has uh regional municipal ramifications that you can put on there, and it's an opportunity to tell everybody about that.
Yes, we will have uh parkland uh that is uh you know extremely valuable, ecologically uh remarkably sensitive, that we uh should be considering protection of.
So it's um uh it's it's very much necessary necessity and necessary necessary.
And the other thing too is that if we're going high density in any particular places and we have these really pocket parks, that's going to be an aspect that um I think we've never had a concept of that we should now start seriously assessing.
So thank you for uh putting this forward.
Just my last comment.
One last kick at the can.
Yeah, we've had a number of parks plans that come out, and a number that I've been really unimpressed with, and um, you know, I I don't get any confidence from this that this is gonna be something that's gonna do the things that you suggested.
I don't keep um yeah no sorry um that was my my thought as well like under the proposed project objectives I fully think yeah what um mayor uh tobias was saying is important but it's only one bullet in in that list and I hope should this continue this um project go forward I would hope that would be the focus as opposed to reviewing existing parks and how we make improvements to existing parks.
Okay, well personally I think this says Vie Royal like no other project um so I'm in support.
All those in favor of um councillor mattson's motion to deny this councillor mattson and counsel McKenzie though um those opposed to councillor mo counselor matsen's motion motion defeated so we keep the parks and trails master plan thank you director taylor.
Hello.
Good afternoon, Mayor, members of council, uh Paul Hurst, Fire Chief and Director of Protective Services.
Um I'm gonna go over our project summaries for 2025.
Um I'll note that all of the uh fire emergency program and bylaw uh capital projects for 2024 were completed on budget.
There are no outstanding twenty twenty-four projects.
For twenty twenty-five, there's six projects um that I have proposed for a total of two hundred and nineteen thousand.
The breakdown of those six projects, there are three involving the fire department worth 56,000, two in the emergency program for 108,000, and one in the bylaw department for fifty fifty fifty-five thousand.
Of those six projects, five are funded by casino.
One is funded by grant.
So the casino funding for four of the projects is 171,000, and the grant funded project is 48,000.
I just wanted to note before I go any further.
Um Captain Mullen in the emergency program and firefighter Eason in the FireSmart program for 2025 have already secured uh 518,000 in grants and funding for projects for 2025-2026.
As for existing projects in the 2024-2025, um, over the next three to five years, those will expire.
I don't anticipate any significant capital projects for the years 26 and 27.
Focus will be on um collective bargaining and uh upcoming labor costs.
So as I move into the capital projects, I will point you to C 190.
Project summary is for the bylaw department and it's in office reconfiguration.
It's moving our bylaw officer and clerk from inside the fire station to upstairs to one of the vacant spaces that is currently a vacant apartment.
As part of the department's uh construction plans and expansion plans, when we built the four apartments upstairs, it was anticipated that as the fire department expanded and services grew.
Those um units, as they became vacant, we could convert those into office or storage space.
Uh currently, one two of the units are rented out to paid on call members.
One of the units is now occupied by the emergency management uh department, the ESS group, and we have a vacant one that we're going to move the bylaw office upstairs into simply because we need the office space in the fire department.
There is a capital cost of approximately $55,000.
That includes uh all building renovations, office furniture, wiring, IT, computers, that's all uh baked in our preliminary cost estimates or quotes that we've been received down.
I've shown it's uh under fifty five thousand,000.
So I anticipate that coming in under budget, and I'll adjust the budget accordingly with the director of finance when those final numbers come in.
The second project.
Oh, sorry.
Any questions on that?
Um, who is first?
My apologies.
Allison.
My uh okay.
My question is um, does the bylaw officer have to be on site?
Is this a job that could be like done elsewhere, like hybrid from home?
Like in my mind, the bylaw officer is often out and about, anyways.
Um, so just wondering if it needs to be at the fire hall.
That's a fair question.
I I'll position my personal philosophy on working from home.
I'm not a I'm not a supporter, I believe, in seeing the lights of the eyes and and interacting with the employee.
You're right, the bylaw officer does spend time outside the office.
Um right now the bylaw clerk and the officer work together.
So of course the clerk takes the complaints, compiles the files, the officer comes in in the morning, grabs those files and and does the business that he does.
Um I'd never considered a hybrid model of being outside.
Uh I did explore the options of moving the bylaw department, the officer and the clerk down to here to the city Hall, but this building is is maxed out in its space, and they're doing a reconfigure there as well.
And I figured with the the available space in the fire hall, moving them upstairs would be the next viable option.
But no, I hadn't I hadn't considered a viable option.
The officer does spend a considerable amount of time in the building other than the patrols in the morning.
It's sort of you pick up your files in the morning, uh, you organize your day, you're out on the road, you're back by lunch, and then you're usually in the office doing the files for the afternoon.
Our First Nations liaison officer, uh Corporal Brewer.
Um, will he be working under that office or is that space available to him?
Thank you.
Good question.
That initiative, um, I think what you could say diet on the vine.
The um the RCMP, it appears they have found uh space out in Langford and they want to keep their office and their their staff all together in one one location.
It was disappointing, I was looking forward to having them move into View Royal.
That's the nuts.
But right now I I believe that's on hold.
So Paul, my my house cost 55,000 when I bought it.
So I'm just wondering why why 55,000 seems a bit excessive and with with all the skilled individuals you have sleeping overnights and working there during the days you can't put some of their time and energy.
That's a good that's a good point.
I I would um I would ask you know our our director Jones to speak on the costs of office furniture these days.
Just to give you an example, um this this will this will shock you two desks um and chairs and some some cupboards was almost $20,000.
I know it it's crazy.
I I was shocked as well.
We're gonna repurpose a lot of the furniture.
Like I said, we're getting quotes in now that's gonna be it's gonna be less than 55, but the initial numbers we had were around 55,000.
So I'm hoping it'll come in far less.
Maybe I can take you to Lunds and we can get some really nice.
We could probably pick up a nice 1800s oak desk and and a credenza, maybe.
I'm hoping that'll come in lower.
But no, I I I echo I was a little surprised as well.
And I was kind of serious about you you can't do any of the work like in-house with all those very skilled people you have prior to March 3rd, 2023, pre-union.
Absolutely.
Not now.
That's the job of a painter and a carpenter.
All right, are the apartments never always are is there always a vacancy or are they never fully in use?
It's very fluid it it comes and goes right now we have we we've gone down to zero we've been full at four we have two right now I I see that program winding down and and as we I have two choices I can I occupy the association space which wouldn't be popular I can occupy that space which we anticipated anyway.
Great I move approval okay the next on the list is uh C 193, uh secure outdoor storage.
That's for $24,000.
That's just for um to put a roof over top of a shipping container.
And when we constructed the public safety building, there was a approximately about a $500 or $600,000 reduction in the scope of the building, which eliminated a significant footprint and square footage of the building, which eliminated my storage.
So the plan is right now our emergency program has trailers that are outside and uncovered.
This is just to put a roof structure over two existing shipping containers, the electrical, the fence, and store the um store the items uh undercover so they're not damaged by the weather.
Okay, we good with that.
The next item is C199, that is a emergency support services vehicle replacement.
Currently, our volunteers are driving a handed-down 2002 Chevy Venture, which is sitting in a parking lot at the fire hall, um, not functional.
This is their primary response vehicle when they support us on fires and emergency call outs for displaced residents.
Um this is a project that'll be managed by the emergency management coordinator, uh Captain Mullen.
Uh he's been successful so far in locating used vehicles.
We plan on uh purchasing a used something along the lines of a transit van or uh an Astra van uh with seats and an area where they can store their paperwork, just a more reliable uh as part of the fleet replacement plan.
It was identified several years ago to replace.
We anticipate we should be able to cover those costs for for about sixty thousand dollars.
That's the beginning.
Oh wondering too if we'll take into consideration uh electric vehicles.
I believe that's part of our um one of our objectives too.
Yeah.
I'd be more than happy to explore that as an option.
I know um Director Leonga's been more versed in the electrical vehicle market right now, and I'll I I can look into electrical vehicles.
I'm I'm sure there's a probably a lot of used Teslas out there right now that we could look into.
You mentioned non-functional.
Did you define that?
Yeah, if I if I asked you to go jump in it and start it, it probably wouldn't.
And uh it's it's on its last legs.
It um yeah, it's it's not a reliable vehicle anymore.
It's uh it was used by the engineering department for many years.
Uh and then it was handed down to the fire prevention division, that was handed down to the emergency social.
We're we're spending more money repairing it than it's actual worth.
It's worth probably $500 now.
It's completely shot.
Yeah, uh just general question, Paul, on uh counselor McKenzie's uh uh if this is an ESS vehicle and it's electric charging, I guess my comment goes uh a bit beyond that for all emergency service vehicles, um, given that they're gonna have to be post-disaster vehicles.
No power, no anything.
Um is is it your policy right now that that would likely involve a gas powered engine at this point?
Um, seeing how if it was a disaster and there's no way to charge an essential vehicle.
Um I'm just wondering if you've got a position on that.
I have a robust position on electrical vehicles at this point.
The there's a lot of debate right now in the emergency services on emergency on electric vehicles for emergency services.
Some applications work really well, I think.
Some don't.
I think the fire truck electric market is experimental at this point and extremely expensive, uh, probably doubles the cost of the vehicle.
I'm not saying it's not a good idea, but I don't know if the technology is there yet.
Um I'm more than happy to explore an electrical option, but you're you you raise a good point.
If if those vehicles are out and about uh for an extended period of time, how long will they last?
Um currently the fire station doesn't have the infrastructure installed uh for charging.
I would have to install that.
And I don't know what that entails.
I don't know if that's as simple as a a 110 outlet on the outside of the building, or I have to install a proper charging station.
I'm not sure what the costs are associated.
I know our director of engineering has uh has a budget proposal for upgrading the electrical services for his building next door, and it's six figures.
So I'm I'm it's something I didn't anticipate.
And just a follow-up.
If um for refueling, um do we have a uh petrol reserve at the fire station?
And that could that be run by battery to refuel in the case of a prolonged uh post-disaster.
Good question.
Yes, we do.
We store just over 6,000 gallons on site at the fire hall, diesel and gasoline.
There was a decision made in 2006 to uh purchase our own fuel tank and and service our own vehicles.
That investment uh in 06 paid itself off about 10 years ago, just in the cost savings of fuel buying the bulk fuel and of course the control of our own fuel.
We're not reliant on going to the shell station or uh uh where we're fighting consumers for for fuel.
That system is also backed up by the generator, uh which is fueled by the diesel in that tank.
So we're we're self-sustaining for probably 15 to 30 days in the event that we lose power.
Counselor Rogers.
Yes, thanks.
So yeah, did we discuss whether this could be an electric vehicle?
We did I've got welcome to the budget meeting.
Okay, right, right.
Uh no, he spoke to it.
Okay.
It's all good.
We good with this, folks.
Make a quick, I have two left.
Yep.
Good.
Uh C one eighty-seven, uh ten thousand dollars for a canopy for a pickup truck just to house some equipment that's currently sitting in the station and sitting um out in the weather.
I I could purchase it out of my operational budget and shuffle shells around, but I would exhaust the operational budget.
It's a it's a minor expense.
I think you missed 194 Paul.
Yeah, 180.
Oh, sorry, my apologies.
One nine one ninety-four.
Oh, now I I can get into battery operated.
So we are we are in the we are in the um process of phasing out all our small tools, all our gas powered, uh small tools, whether it be saws, jaws, cutters, anything like that.
Um this is just replacing an old piece of technology that's gas powered.
It's a it's a cutting tool for auto extrication.
It's uh $22,000.
So educate me about yes.
Why electric over gas that's been used forever.
Yeah you know I I wasn't a believer until we used them they're faster they're quieter they're lighter they last longer they're they're more reliable the the technology in the in the hand tool like we our lawn mowers are we everything at the fire hall now is electric this is the only piece of equipment we have left that's uh that's gas powered and i would i would choose the uh the battery operated over the the gas powered any day and it's just new technology is working now all good good um 122 and 122 is indigenous engagement requirements now this is emergency management this is a grant funded um it's a this you'll notice this is a 2024 grant uh that we received for $48 000.
I just want to point out that money.
Um sorry, the $10 000 for the truck canopy.
Did we uh sorry?
I thought we talked about that one.
There's a canopy for uh for one of the pickup trucks.
I was saying I could I could cover it in the operational budget, but it would exceed the uh it would exceed my operational budget, and then our new director of finance would send me a nasty note that I've expended further than I was allowed.
So that's why the 10,000 for the capital.
Any comments on that, questions?
No, and then just in discussion there.
So was are are you talking about N122?
N122.
I'm gonna get to that one.
Uh yeah.
Uh C 187 was the 10,000 for the canopy, and the previous one, the C194 was the 22,000 for the electric uh rescue tool.
Yeah, the those $48,000 have been ex have now been allocated and expended.
And I'm pleased to report that Troy was able to secure another $48,000 for uh 2025.
Those funds were used um in conjunction with the city of Esquimalt to set up a scholarship for the Esquimalt First Nations for uh emergency management initiatives and also a larger uh indigenous engagement initiative with uh throughout the CRD.
So these are provincial funds that we uh that we received.
That's it for you.
Thank you.
That's it.
Thank you, Chief.
Yes, you're welcome.
Thank you, Madame Chair.
Ivan Young Director of Engineering.
Um, I have a few projects here.
What else uh chair, what I'd recommend is I just do a quick five minute spiel on all of these, and then if there's any questions that comes up, I'd be happy to go over them again.
Um, there's a few in here that are operational in nature, um, and then certainly some that I'm sure that there'll be some discussions.
Uh so uh these are new projects for the next couple of years that council has not seen.
Um, main of it has been thanks to our uh Ben Lubers and their asset management program, they've been able to identify programs uh on the adage of no surprises.
So we're creating programming to help um uh efficiently replace infrastructure.
Um, there are some items that are uh emergent in nature in the sense that uh some some items have um finished, they're basically uh dead in the water, or they've they've basically obtained it, they've gone through this useful lifespan.
Um, and then there's a couple of non core uh planning related ones too.
So the first one is the town hall partial roof and gutter replacements.
So basically, through inspections, we found that the gutter needs to be replaced, and only a partial a portion of the roof needs to be replaced.
Figure that uh we don't need to do the whole roof just yet.
Um that could be done later on as part of a better more of a depreciation report that we would likely do in the future.
$20,000 under uh capla works.
The the bridge rehabilitation program, so that's C 184.
Again, that's a minute I think we have a question on that.
Oh okay.
Never thank you Madam Chair.
So the bridge replacement program, C 184.
This one is um again, Ben has been working hard on creating a a uh rehab program for many of the bridges.
A lot of them are super important.
So what was identified is basically within the next five years, um, two years in which we have to do some improvements.
Fiscal year one would be uh expansion, uh expansion joint replacement um on Craigflower Bridge, repairs of corroded structures on Highland Bridge South, and then the Garbell replacement on the Parsons Bridge Pedestrian Walkway.
Um, and then fiscal year three would be when we would do the remaining that's in the table there.
We want to do a we want to give ourselves a one-year break to reassess.
How'd you come up with 150,000?
Has somebody gone out and done an evaluation and costed it?
Or is this just sort of a the real high end and the costs are going to be lower?
Like um yeah, Madam Chair, this was done through structural engineers that we've hired to do the assessments.
They're the ones that are qualified to do the work.
Yeah, Ivan, it's good on the bottom of the recommendation that um the funding source is kind of a question mark.
So just is this operational?
Is this gonna be coming out of taxes for this year, or is this something that the reserve kicks into or the continuous improvement?
Uh yeah, Madam Chair, that's uh no not to taxation is capital renewal reserve.
Go ahead.
Yes, thanks.
That's right.
So um the uh with respect to the uh bridge um Watkissway Highland, I don't know which which what's which one it's called, but um um I I guess one of the problems was the bridge where um I think we've leveled it off, but underneath the bridge is um when um the the stream keepers and a variety of folks were looking at the uh with with the ministry of highways looking at the replacing of the Gallup and Goose Trail, that bridge and and so forth.
Um the concern was the large boulder that had been placed in Craigflower Creek and its um um propensity uh to create a a um nasty flood back backing uh the uh debris backing up and flooding weaver.
And um uh we saw that obviously in in the last uh um atmospheric river 2021, and uh one of the houses had uh you know significant water damage, insurance costs, and so forth, road got flooded, and they attributed that lot to the boulder.
Have we given thoughts of um removing that impediment?
Uh Madam Chair, with respect to this project summary, uh I can't comment on that, but we can certainly take a look and see what can be done operationally.
So once once you're there, the um it's it's reasonable to have as you're doing the estimate of remediation, you could uh assess that as well.
Uh Madam Chair, again, I can't comment on that because it's not within this project summary, but we'll take a look at at that.
Wacus Bridge is not identified within this program at this time.
Um, but certainly should the come up again, we'll take a look.
But that said, you know, we'll we'll take your comments in consideration and uh look at see to see where this uh boulder is.
Okay.
Yep, thank you.
I thought we were talking Highland, but uh see we're talking another bridge.
Okay, thank you.
Well, good, good.
Carry on.
Perfect.
Thank you, Madame Chair.
This third one was uh C 175.
Council's actually seen it before.
I'll breeze through it.
Um is that it's slated for this year.
However, it's best to time this with the 339 Island Highway development.
So that's the big one that's next to the the public safety building.
We haven't seen any works around that area, so we recommend deferring this another year.
Um we won't be spending any time on it anyways.
Uh yeah, um question to whomever.
Perhaps it's to Director Taylor.
Is there any indication that there is going to be a build there?
We haven't heard from the developer since the line was rezoned.
Yeah.
Yeah.
I I don't I would be surprised.
Um, Councilor Rogers.
Yes, um it's not likely that the uh 339 345 Island Highway project will will go ahead.
They're they're now focused on um uh the project in Esquimal.
This is last on their list.
So um with that in consideration is this um even if we didn't have this uh particular project possible um uh the work that you're recommending is it still um important enough to proceed on uh madam chair n I don't think so I mean the road's operating well enough as it is right now the only reason why we want to do as part of the development is because when that development happens, half that road's gonna go.
And so we need to push it over.
So would mean make it contingent upon getting more news if the project is going ahead?
Uh yeah, Madam Chair, that'd be correct.
Um, usually like big developments like this take about 18 months to complete.
We'll we'll usually see furniture improvements, you know, maybe 12 months down the road, and that's like after building permit.
So we have plenty of time and staff can certainly provide uh informed um information for for council.
Okay.
Um second.
Second.
Okay.
Favor.
All um all in favor.
Thank you.
Thank you, Chair.
Uh so the next uh project is C 186, the traffic signal renewal program.
Um so bands it's been going through our traffic signals to see how many are outdated and how many are good.
Right now it looks like we have an eight signal replacement program that we want to undergo.
These basically haven't been updated since they were installed.
So there a lot of them are due for replacement.
Council has uh approved traffic signal replacements for us in the last uh few years, and uh those signals work like a hot dang.
So they um we're looking to see more uh improvements.
These are the ones that do see regular problems.
Uh we do have staff that have to spend after hours to um go to the site and um and review and call Raylect to get them done.
So by installing these signals, you would reduce the amount of staff time and consultant times to to uh to fix the issue.
Um project C195 GPS unit replacement.
We do have one GPS unit.
Uh it's predominantly meant to reduce the amount of consultants that to do fuel pickups for us.
Uh we do it ourselves and then we provide it to consultants when they do our designs.
It is a good cost-effective manner of of uh of um managing our infrastructure.
That GPS unit that was purchased 15 years ago is now uh the technology does no longer support it, so it's basically dead in the water.
So the idea is to uh replace it with a new GPS unit.
Um, it's about $13,000, which is why we're going coming forward the council.
Um, but it would basically last another 15 years.
And in doing so, uh it would result in less consultant costs for field pickups for master planning for detail design.
Um definitely a good uh value for money there.
So um yeah, obviously uh huge support.
The um I'm wondering how much um uh work that we've got yet to do on in um using GPS to identify in uh essential infrastructure.
Is that pretty much all done?
Um in just and whether or not this this um project uh helps assist in ensuring that.
Um what it does is it uh basically there's a couple of staff that will use it uh our GIS Tech, our summer student, and our uh Sanitai Sewer technologist that will all use this um it's done usually in the summertime when there's good weather and the information there is automatically imported into our GIS system uh from uh to answer counselor Rogers' question about how it's used in master planning um basically we just give a data dump to the consultants and then they just import into the models it's a lot more efficient way of doing things okay chair.
Next project is C200, the sewer SCADA pack upgrades um I'll try to simplify this project summary.
Generally speaking, we only have a staff of one for sanitary sewers.
So in doing so, we have to lower a level of risk when it comes to making sure pump stations don't overflow.
By doing that, we do have uh SCADA monitoring, which basically gives us alarms when things aren't going not going well.
This SCADA pack would provide more detailed or more precise information.
And it's a little bit less on the operational side.
It's more to because you know, with OCP coming in, uh sanitary master plan um proposed for next year, and the SMA housing that's coming in, it would be beneficial to the town to obtain better information uh so that we're not over designing and also we're not uh giving ourselves any surprises to say hey look this something is undersized because of the the information we receive right now is is it's not as precise so it is a hundred six thousand dollars through sewer capital reserve not through taxation but through um through our sewer rates and um it would be for this year so that we have a year's worth of data to plug into our sanitary master plan uh next project is a non core n125 speed limit reduction implementation proof um I have a question from councillor Matson yeah so I'm wondering like is this one of the things that's just sort of a nice to have, but we've been going along fine with the current system, and it's like a a new toy that we have to we can put in place and will give us some better better results, but will it really make a difference?
And can you quantify the difference?
Yeah, I mean I I can I mean I wish the the answer the quantified answer is 42, but it's not.
Um at the end of the day, the additional information could delay upgrades.
So it could delay the need to uh do upgrades, quite simply because the data um does not have as many round-off errors.
Uh this was provided to myself uh through uh through our tech, who has uh done some research on what other other pump stations in the region have.
I would say that because the the small scale multi-unit houses coming in, it would be good to have it.
That said, you can ask yourself the question, council can ask and solve some questions how many small-scale multi-unit housings are gonna happen in the next five years.
And perhaps you know there that is something that could be deserved.
But at this time the sanitary master plan would have more value if it had a year's worth of data or better data than we have now.
Okay, carry on.
Thank you, Chair.
Uh so yes, N125 speed limit reduction implementation program.
So council uh has directed staff to reduce our speed limits uh on every single or all residential roads and island highway.
And in doing so, it does render the current uh traffic calming policy as too onerous and and not exactly reasonable.
To give you an example, the the policy states if the X amount of vehicles go over 10% of the speed limit, then this basically you can basically look for traffic calming.
If speed limits are 30 kilometers an hour, then we're looking at 33 kilometers an hour.
It's one thing to to acknowledge that, but it's another thing to understand reasonableness and how and and how uh accurate our speed signs are.
They you know there's usually a two to three kilometer an hour uh kind of uh uh standard deviation.
Uh so it's not exactly reasonable.
So the idea here is to engage with a qualified transportation planner to tell us what we can do based on the level of service we have, the staffing we have, and to come up with a better policy.
Um and again, the uh the recommended changes we brought forward to council for review.
This is uh to be funded through casino revenue, about twenty thousand dollars.
That's a little on the higher side.
We figured that we could probably save some costs by doing our own kind of uh data data collection.
Uh we did not receive the Vision Zero grant either, so it would be the full amount.
So I mean we're not talking about signs here, which would seem to be to be kind of the obvious.
We're uh we're going to 40 on island highway and 30 in neighborhoods.
We're talking about a policy for the signs?
Yeah, we're it's actually both.
It's gonna be policy and signs.
So the policy will tell us kind of where to put the signs, and then we'll use it's actually fairly cheap to install signs, and we'll probably use the balance of it to install many of the signs.
Um it will come down to uh you know the the budget will will probably do a good chunk of the signs.
Um perhaps not all, but the future ones could be done through operations.
Okay, good, thank you.
Um, Counselor Brown.
I move that this be moved to year two.
A motion from Councillor Brown that this project be moved to year two.
Do we have a seconder?
No seconder.
Okay.
Question?
Two Ivan.
Two Ivan.
Yeah.
So uh uh yes, no, I thank you um uh for for moving this along.
Uh it's an important component of out of the um uh studies that we've done on on traffic calming.
The um there was another you've got another um project about traffic uh counts, right?
That's coming up.
Okay.
Uh I believe that was brought forward by yourself, Counselor Rogers.
So is is it possible when you're doing the traffic counts you're gonna be able to do the traffic speed so that you'll have some, you know, uh an idea of baselines um, you know, with the uh to be able to test and prove the viability and success of speed limits.
Um yeah, thank you.
Uh so Madam Chair, not to skip to that particular project summary, but um that particular project summary for doing speed counts is not recommended by staff because staff have already done a good chunk of it and a lot of it's gonna be further done through the transportation master plan.
So it's almost redundant in nature.
Uh so to answer your question, no, we would not use that.
Uh we would use existing data that we have already uh obtained.
Sorry.
Question?
I guess my question is at this point, wouldn't it be just easier to just put up the signage and not worry about the policy?
Because the reality is if somebody's going 32 in a 30, that's not the problem right now.
It's when they're doing 55, when they're going over 50 kilometers an hour.
But now that we've dropped all the speed limits down to 30, wouldn't just the signage be sufficient?
Uh yeah, Madam Chair.
Signage is one thing.
The implementation of traffic calling measures is another.
So to give you that same kind of anecdote or example, if 33 kilometers is what is the trigger point to up to put in traffic calling measures, then you would have speed tables and chickenes and a lot of infrastructure very costly to the town being implemented quite simply because it meets policy.
So the idea here is to create new policy that uh balances uh safety and traffic calming and also um takes into account the fact that it'd be very costly to install traffic calling measures.
And by just keeping the existing policy would exponentially increase uh our cost to install traffic calming measures.
Just to follow up.
Wouldn't it just be easy to ignore the policy when it doesn't make sense that that this if if we've dropped the speed limits down like we're not anyway I I just hate to see us spend a lot of money on a consultant to do this but I really want to see the signage up yeah uh through the the chair it's a symbiotic relationship between uh putting signage up and the enforcement of the signage so that's the reason why we want to to have a policy document that helps us establish level of service and so that um the amount of traffic calming is done equitably throughout V Roll.
My only other comment the lives of our children are worth the 20,000.
Maybe I'm just uh like the example that you provided to me is um quite a simple change like to what triggers um traffic calming is would be quite a simple change to policy, I would think.
Um so is there other examples?
Because I I agree, could we just change um make small changes that are required and then use and put up the signage?
Yeah, through the chair.
Um what we find is that the small changes are the ones that result in higher operational costs or higher staffing costs.
So the there is a Transportation Association with Canada um booklet about traffic calming that does provide metrics on how you can manage traffic or the speeds uh in line with how much staff you have.
So if we were to take say a policy from a big city like Victoria Vancouver we can certainly do that.
We'll require approval of about 10 additional staff to do that though.
So that's the reason why we need to come up with something that um definitely uh is in line with our staffing and our capabilities.
The smallest projects to create the greatest amount of discussion.
Yeah, moving on.
Thank you, Chair.
Um, next project is M123.
This is a five-year invasive species removal program from Portage Park.
Um, as Mary Tobias previously said, this is an OPM, other people's money.
Uh the developer at uh 181 Island Island Highway provided the town with $50,000 to remove invasives.
And so we would tie this with, we recommend tying this with our invasive species removal volunteer coordinator and greater Victoria Green Teams.
Um, basically like one or two events a year and until the the fifty thousand dollars runs out.
Uh project C191.
So this is in year two, so not this year.
Uh this one is the parkshed electrification upgrade and so we've re we've heard loud and clear from council they need to upgrade our or electrify our our vehicles.
I believe we're about uh in terms of engineering parks we are 40% electrified.
The next two are kind of doozies though there is the dually dumped truck and then a Mitsubishi Husso which are uh big vehicles there's not exactly one uh electric vehicle that is par for par with that but the next one, uh which is a they call it a class three equivalent, so a commercial vehicle, that actually requires a hefty upgrade to our park shed uh electrical.
We basically need to take the hydropole that you see right front by the the parking lot, drop a brand new um dedicated high voltage service, bring it to the park shed, and it is quite costly.
So what you see there is it happening in fiscal year two because it still requires a lot of thinking and it requires a lot of engagement with BC Hydro, and we don't think we can get it done this year.
So it'll be it'll be a little bit of chats this year, but next year we'll where we would probably see it.
Yeah, so just just clarification a hundred thousand is for just for the electrical, right?
To be able to do the EV vehicles that we had to have.
Yeah, so uh council's direction was to electrify, so we we're telling council this is this is the opportunity cost to electrify the next couple of vehicles.
Um it requires a drop, it requires us basically taking out the asphalt path, putting a new one on top of it, going into the building.
Um all the electrical, it's you know it's high voltage, it's something that staff can't simply just plug into.
It's it's it's dangerous and we don't want that done our staff.
So um it it is uh I would say in terms of the preciseness of the cost, it's a class class D.
So it's a little bit of contingency there, but that's quite simply because we don't have the ability to hire engineers just yet to give us the design.
That'll be as part of the this that project.
Um I see that dinner has arrived.
You've got two more projects.
I would love to get through the two.
Let's do that.
So with uh the chair's permission, I'd like to move forward with the next one, which is the DCC update.
So that's uh project N124 for fiscal year two.
So this is the development cost charge update.
Um certainly very important when it comes to obtaining uh fees from developers to pay for infrastructure.
It's uh plan for fiscal year two because that is when all of our master plans are um would be done.
It should council approve our budget.
Uh the big three for us is for engineering is the um sewer, drain, and transportation.
There is the parks and trails as well that could also fall in line with that.
It's $75,000 now.
Um, and that's on the cheap end, and we think we can do it for that amount because uh we'll have all our master plans in place.
If we don't have our master plans in place, then that amount doubles.
So the more reason for us to kind of have our plans in place first, understand what infrastructure needs to be done that's growth related, and then it's just a really easy exercise to do our DCCs.
Um Councillor Rogers.
Uh thank you.
Um certainly um I'm in support of the DCT up update.
Um but yeah, I think you mentioned that you wanted to get the master plans done first.
That is correct.
That's the way you do it.
Yeah, right.
Uh because uh looking at the the master plans, then the sewer master plan was going to happen the same year.
So um hopefully we get the sewer master plan done in time.
Um the the Parks Trails Master Plan was split between two years, start uh going from the DCC year to the following year.
So um is that still going to be um and I don't want to and of course then we have the amenity charges by law uh that I'm sure is going to compound things in the same year as the DCC.
We're gonna be able to do all in that one year.
Uh yeah, the parks DCC component can be done later.
So we don't need to do all at once.
We can break it down.
So the idea for doing it now is because all our master plans are quite old.
Uh we have new developments coming up, new small-scale multi-use.
So the risk of delaying it a year is is high.
Yeah.
Um the opportunity to do it as as in 2026 is actually more important.
Thank you.
Counselor Matson.
Yeah, I'm certainly okay with the project.
We can argue consulting costs next year.
But my question is the uh public engagement like for DCCs, like most members of the public wouldn't have a clue uh about the topic.
And I'm just wondering how much public engage I'm I'm just curious, is like why public engagement for something as complex as DCCs?
Uh yes, that's a good question.
Um, so Madam Chair, it is legislated to provide engagement for a major up for a major update.
For minor updates like what we did two years ago, which is just a CPI increase, we don't need engagement.
But uh for these major updates, it does, and it's mostly to the development community.
Last one, uh perfect, thank you.
I really appreciate the time you've spent with me here.
Second last year.
So this next one is the traffic count data collection.
I mentioned before.
We've already done the work uh in anticipation of a transportation master plan, and the consultant will be doing more, the ones on the more collector roads.
So staff actually rec recommend not including this in our financial plan.
It's redundant.
It's it's an operational thing that we'll do from time to time when we need it.
Yeah.
And then the final one is the sanitized sewer master plan for 2026, uh paid for predominantly through DCCs.
And this is the one that uh will tell us what we need to do to keep our sanitized sewers running for the next 20 years and also will help our DCC programming.
I have just uh one um that can wait until after our recess for supper, but it is for Ivan.
I just wanted to prep Ivan for it and I'll disclose it when we return.
Unless it can be fast and you're we're willing to uh extend a little bit.
Okay.
Um so should we break now or cut uh is it related to this this particular one?
No, it's something that's not on here.
Oh, okay.
A surprise.
All right, quick one to get rid of.
So let's do so let's could let's do this one and then yeah, get another way.
I get a quick one.
Question minutes.
Yes.
Well Paul's not here, so I can't give him kudos for his $400 and some odd thousand dollars he's getting in grants this year.
Is this something that we can apply for grants on this project?
Um maybe, but a lot of the grants are conditional to not being funded through DCCs.
This one is funded 100% or 98% through DCCs, uh, which means the developers are paying for it.
So yeah, it's already in our DCC program.
Um so it's it.
So we're good with the okay.
Um so stay for supper.
Um Ed, can we have a motion to recess?
And seconder.
Moved by Mayor Tobias, second or um by Councillor McKenzie, all those in favor.
Return at 6 30.
Sound right?
Quarter after?
Okay, quarter after.
All right.
There's more.
We're going to be consider um continuing budget discussions on this Tuesday evening meeting of the Committee of the Whole.
And we were when we broke, we were um broke off, we were going through engineering department projects.
And um Director Leong, there was one that we need to vote on.
It was your N196, 126, and that was, and we haven't we we needed to um oh so we we need we need to vote to pull it pull it out, colleagues.
So we apparently the the traffic count data collection.
Yeah.
Did we support just um yeah, so uh madam chair, the this one was the project requested by council to do traffic down count data for a lot of residential roads.
So staff recommend actually taking this out.
It's already been done by staff and it's going to be done more so through a transitation master plan.
Taking it out.
There you go.
So but we but we but we need a motion.
Well we already did.
No, we didn't.
We didn't.
I'll move it.
Thank you.
Second.
Thank you.
Okay, moved by Councillor Brown, seconded by Mayor Tobias.
All those in favor of removing it.
Uh removed.
Thank you.
Thank you, staff.
We have one more under engineering, and that is something from the mayor.
Mayor, Mayor Tobias, would you like to raise the subject?
Thank you, Chair.
Yeah, uh colleagues, if you recall, we had a um a staff report before us on improvements to the Watkiss Helmkin intersection.
It involved, was it an Alberta curve, a Calgary curve, an Edmonton curve, McDavid curve?
What was it?
It was a Calgary curve.
Calgary Calgary.
So we voted to table it at the time because it involved a lot of everything.
Um and uh my concern about that is as we were doing that, which I thought was a wise idea, now I realize it's at budget time.
My neighbors are very concerned about the light that now that we've tabled it, um all they wanted, they didn't want a Calgary curb or anything else.
They just wanted a change in that light, particularly for the pedestrian timing uh for it.
Uh literally the um green arrow uh turns into a green light for turning off a Watkus Way onto North Helmkin at the same time that there's a pedestrian green light on.
So those not familiar that that you're not supposed to do, uh, have got my neighbors literally on their hoods.
Um, and uh so that and there's no left turn out of uh Chancellor Avenue as well.
So we've restricted left turns on Camden.
So that's the north, but on Chancellor, there is no advanced left turn.
So literally, there is no way to come into town from uh from the Almaken hospital neighborhood uh that you can do that is legal or safe.
Um so I was just wondering with um that we've tabled that, it's not on the budget, it may not even get done this year without uh study or something else associated with it.
But what I was gonna request is that I make a motion hopefully to elicit your support that at least in the sake of safety we factor that in for this year.
It's not an endorsement of approving it right now.
It's a waiting for Ivan to come back with us for that specific piece out of it later on this year.
But if we advance it past the budget, then it's really too late to get it on the books.
So uh your worship, are you suggesting that um um we enable uh C 128, which is the intersection of Watkinsway Helm Helmogan, uh for the purposes of um um light modification.
I uh I will move that, yes.
Correct, that might be as easiest to understand.
Okay, you moving that?
I second.
And uh motivation this is just about safety more than wants or needs.
It's just strictly a safety thing.
And and my comment is that it's um it drills down to the specific wants and needs of the community um without uh the other enhancement uh aspects that are still contentious.
Council Matson, just for clarification, what this is is for staff to bring it back with comments on the lights.
Uh that that would be my intent, Councillor Mattson.
It would just be uh what would it cost?
What what time period it's not approval or endorsement, just asking staff to come back uh with something just for the light, because we have tabled that whole thing and it would stay tabled until we pulled it back.
So so um am I on?
Um looking at C 128, it's for year two and it's 1.166 million or one 1.166 million.
Um so what you're proposing there, Tobias is some probably some reduced version of that.
Uh affirmative uh chair, just just the light.
Okay, okay, thank you.
If I may, we'll just the question and um a very valid point to uh pull this up for discussion.
Um, you know, we'll go through staff's list of the new ones, but um I'm hoping that we'll also have an opportunity to go through the existing to um uh you know either amend, remove, question, whatever.
There's still outstanding ones that uh I think we should be looking at, even if they're called existing.
What do we think of that?
Well, if that's a question, I mean there's one for like hundreds of thousands of dollars for View Road Park, and I'd certainly like to see us bring that back for discussion.
So there's a number of those, and I guess once we're finished with a stash list, we need to figure out what we're going to do with with the rest of them.
Okay.
Director Jones.
Hi, good evening.
I am here to talk about three new projects that you will have not seen, although you perhaps saw them in the accessibility plan, but not in a uh in a budget before.
Uh the first one is C 189 Accessible Entrance Town Hall.
I am now Rick Hanson certified, and one of my projects that I did to become Rick Hanson certified was to look at our front entrance.
And um, this project addresses some of those issues that were identified.
And that is the in basically as we strive to become a barrier-free community.
Part of that is our building.
And the first one is replacing our activation switch to something that's elongated.
Right now we have the small circular.
The elongated is something for people who are unable to perhaps use their hands, can use some other device, such as their realed mobility device, to open it, which is the way that is the more modern way that people are able to now use power opening doors.
Also, either creating a larger glass pane on the doors or new doors, perhaps something a little bit lighter.
They're very challenging to open if you don't use a power assist door.
And then as part of the project would be instituting a cane detectable component at the front because right now those doors can open and people can walk into them without actually knowing that the door is going to open into you or into your face.
And so there is something in there's visuals provided in the attachment that show you what this cane detectable component is, and those are for people with visual impairments.
And finally, if there is funds left over, uh, perhaps to create a little bit of a lower threshold.
Um, right now it's a little bit high and harder to get over for people in wheeled mobility devices.
And we actually have had issues in the past with the door closing on people in uh wheeled mobility devices, and it's actually also a problem for small children who can't push the door back open themselves.
So we do have some issues, and this project summary seeks to address those.
The next one is tied uh interestingly to a project.
So I'm going to ask for a recommendation from the committee this evening to move this item C 188 to FY2, and this is council chambers exterior ramp.
It's tied to a project that Ivan has talked to you about earlier this afternoon, uh the park shed electrification Upgrade project.
That project sees work happening outside this building, outside this door.
So the thought was at the time if we're making improvements in that general area.
There's machinery, things are being changed and ripped up anyhow.
Perhaps we can improve accessibility or egress from this room and this building out this way by including a ramp project.
And so that's what you see in C 188.
I had listed it in FY1.
That project C191 is not slated until FY2.
So the ask would be that we move to FY2 for the project known as C 188.
But we'll get to that in a minute, and I'll finish with the third one dealing with accessibility as well.
And that is a little bit more of a nuanced project.
It's not a physical project, it's more technology related.
It's N047, a website refresh.
This project is talked about in two plans.
The strategic plan addresses it, and also the accessibility plan.
In the strategic plan, it's more around a communications modernization approach.
In the accessibility plan, it's more discussed in terms of how do we make it more ease of access for people who perhaps have more visual impairments or issues using technology.
So we would perhaps seek to have described images, which we currently don't have, perhaps colors that are offering more visual contrast, so something easier for people to use that have accessibility issues and improve the user experience.
And from the communications perspective, just make it a much more accessible website, more user-friendly that way.
So that would tick off the box for the strategic plan items.
And so those are the three making town hall more accessible both physically and then technologically.
And so those are what I have for 05, and then moving C 188 to 06, 06 as well.
Yes.
That just the exterior ramp, not a ramp going down into the chambers themselves for somebody who's on a mobility device.
Correct.
We have not put that in, although that is something we have talked about as well.
We did when we did this project make this wide enough to ramp so we can eventually do that project.
And that's not to say in our accessibility plan there won't be more projects over the years to come.
Okay.
What about new stuff coming in?
Like as we develop new web pages, are we going to have a template to do that or will we have to do an accessibility refresh periodically?
I believe what we would be doing is setting up the standard that we would be able to follow for new content as it comes in.
And I think I mean it's been since 2010 since this website was created.
I would like us to refresh on a more regular schedule than every 15 years to keep us more fresh and modern.
But I I know our staff is capable of taking taking the template and and uploading and embedding our content to that.
So I'm fine with that.
I would like us though to refresh more regularly, uh corporately and and more globally.
That's the right.
Yes, thanks.
I'm really happy to see the uh website refresh uh absolutely since 2010.
Good grief.
Um the one of the um uh shortcomings of the current website is the the difficult search functionality.
And so is there plans to in improve that search uh ability, other exact word and um you know advanced search?
I am hopeful.
But I have we haven't put out any sat down with the the proponent, you know, we haven't sat down to to address this project because there's no funding yet to spend time on it.
Yeah.
I guess what I'm I'm what I'm asking is that um uh we have a budget estimate of nineteen five and uh depending on what uh what we may or may not be getting I'd be happy to reassess the amount to make sure that we are going to get what we what we had long since hoped for and I will be happy to come back and ask for more if the project actually requires more because I don't want to do a disservice to our residents and our businesses and in particular our community that requires enhanced accessibility.
I agree but that's cheese so first off, I'm curious where's the council chamber exterior ramp supposed to go?
And why do we need that when people can come around to the front?
The project summary discusses that in the event of uh disaster or a need to exit the building quickly.
Any member of council, should they be in a wheeled mobility device, would need to leave out that door.
I guess from my perspective, we should probably wait till people actually would potentially need it as opposed to put something out there that's gonna rot in four or five years and we're gonna have to redo it.
So from my perspective, wait till it's needed.
I just don't see it.
So that's that one.
None of us are getting younger.
Yeah.
Well, yeah, we don't need it anyway.
Anyway, they don't need a ramp.
And didn't we just hire somebody, make them full time to do websites and communications and things?
And why why are we spending why why don't we get the staff that we've just got to full time to do it?
So I mean again, it's one of these things where we're hiring consultants when we have staff.
So I can't support that either.
Yes.
Just wanted to jump in.
Um we've only hired a halftime communications person.
Uh the IT manager um has been moved to full time, but that's he's not a web developer.
And he's supposed to be offsetting some of our contracted services um for our managed service provider.
So great they don't do our website either.
Your mic wasn't on but uh and and web development and communications are two different fields.
Yeah.
Are you I actually can I note grant funding I think you you noted there's the ability for grant funding as well.
Yes, I will be making an application should there be support from um council to move forward.
I would like to make an application to Spark uh BC.
There's up to $25,000 that can be used if we are successful to help offset the cost of the projects.
So are you making a motion to remove support?
Wouldn't do that.
We respect anything you have to say here.
You know this.
So well just just hang on.
Should we stick with the agenda and go to uh director Vela's next piece?
Or um I'm look I'm looking for guidance here, or should we um tackle the other stuff in the project list?
If I may, I I think it's actually reasonable, um Madam Chair, to carry on with staff's agenda and then um ask to get an opportunity afterwards.
Yeah.
Staff.
Thank you, madam chair.
So this is an overview of the 2025 tax multiples and rates report.
The town's current tax rate setting language is identified in the annual financial plan bylaw, including the objective of maintaining consistent tax burden for all property classes, and a policy of regularly reviewing affordability and distribution of tax burden.
This has resulted in the town reviewing tax multiples each budget season.
The tax multiple is the factor that council determines for the utilization of municipal services between different property classes, specifically between residential, business, and recreation classes, which make up over 99% of the town's assessment base.
2023 and 2024 multiples were the same except for class 8 recreation, which was increased from 6.0 to in 2023 to 6.5 in 2024.
For 2025 and 2026, staff are rendered recommending that the same multiples as 2024 be used to calculate tax rates.
Existing multiples are very comparable with other municipalities in the region, and this maintains consistency and fairness from year to year.
Tax multiples, rates, and taxes on an average home for municipalities in the region are included in the report and appendices for information.
In addition, as identified in the report, primary property taxation principles include fairness, predictability, and consistency.
Reviewing and changing tax multiples on an annual basis can deteriorate these principles.
Therefore, staff recommend redefining the policy statements to review tax multiples less frequently.
Staff do plan to come back to council in the future with budget and tax policy framework to help guide our future approach.
That's all I have.
Happy to take any questions.
And questions for staff.
Yeah, so my question is like over the past 30 years, what we used to do is have a quick review of what the impact on various, you know, and mainly was to do with residential.
If we took we added a percent to uh to business and removes we fiddled around and so we ended up coming up with rates that we thought would work for the taxpayers.
It didn't seem like it was a huge effort in terms of staff's time because uh they used to just do it right while we were chatting.
So my my question is from your perspective, I know you dealt with the fairness and those other issues, how much work would it be to leave things sort of where they were where we we might decide that say for example 11.25 percent is too much on residential and we're gonna shift a little bit of that burden over to uh business or something.
So that is a very good question.
Um it can be as much work as we want to make it based on the number of scenarios the council would like to see.
So if this isn't to say that if you know staff were directed to go and come back with various scenarios that can't be done, I'm not sure it's a quick on the fly exercise.
Um it's a little bit difficult to because the tax impact to specific properties can vary greatly uh depending on the average assessed uh home increase, assessment increase within a class, and where that specific property uh out as part of our role sits in terms of their own increase relative to the average.
So depending on what that end game is and what what the result is the council wishes for, it's I'm not even certain that you're gonna necessarily get what you what you want just because there are so many nuances within the classes.
We can provide an idea, but it's not it's not black and white.
Yeah, and the reason I ask is it's something we did on a regular basis, and it seemed to didn't seem staff didn't seem to have much problems in playing with those numbers if council wanted to to adjust them.
So well it was a conscious decision this year to not use counselors representative homes as an example.
That's not usual to do.
So it might have worked in the past but it it really creates a perception of conflict of interest which we're trying to avoid.
So we went with the average representative home which is produced by BC Assessment.
We know what the dollar amount is on that.
I think for the purposes of of this year, we decided to keep it simple and we're hoping that council will keep the ratios the same.
Nothing's changed that dramatically.
We we don't have any major new uh light industry or businesses in town.
But um what Mr.
Bell is proposing is that when we get to the point later this summer where we come back and create some tax policy to guide how we do this, we'll have more time to do that.
But certainly was intentional.
I I think um, Counselor Matson, what you're referring to as seven different assessed values that might look very familiar to council.
And um uh previous director Ziegler saw that and thought um that might not give the right perception.
Counselor Brown.
Yeah, thank you for that, uh Scott.
Uh that's exactly what it was.
It was uh uh what Councilor Mattson's referring to.
They um gave us a list of spreadsheet and it showed our own personal homes what our uh uh assess our tax would be and um I think they threw in Highlands Golf Burst and a couple other ones to but it was just to give us an idea of what the increase would be.
But yeah I agree.
Um yeah has a perception of a conflict of interest for sure.
Here to buy it thank you um a couple of points I just want to make and I'm I'm kind of happy with the way things are and and two of the reasons I'm saying that is one is the Globe and Mail did a tabletop exercise and rated View Royal the best place for an entrepreneur to live in Canada.
We're doing something right.
Including one of the reasons and the criteria was our tax rates.
Right.
So it might be out to lunch, but for many, it was a pretty good indicator that we were doing something right.
Being cheap and proud of it paid off.
There's a couple of points I'd highlight here that I have questions about.
I think we could discuss them in time.
I'm not really in a hurry to discuss them this budget cycle.
I don't think our tax rates are out to lunch, to be honest with you.
I think they're working.
Most of them are median.
There are two things that speak out to me that are the high point, actually.
It's our utilities class and our farm class, right?
That were the highest in in CRD.
And it depends what this council wants to put forward as most important.
Is food security and farming important to us?
Because I'm looking at the low as 0.17, probably for Sanich or North Sanich, and a median of 3.19, and a high of 11.58.
We are the high point in CRD for farms.
Property tax multiples for town of Uroyal.
Table two.
Table two.
Page three.
Page three.
And the other one is utilities, where we are also pretty much the high point there, uh, with uh a low of four point two seven, a medium of eight point zero one, and the high of nineteen point nineteen.
So we we we are the highest on two of those categories in CRD.
No, I this is just an observation that that those two are the highest.
And yeah, I'd I I'd be okay with for now, but um yeah, I'd like to be able to have an answer.
With that.
I'm wondering if this is a time or opportunity for us to do a a uh for each of us to weigh in on what we would be find acceptable, could live with, and then relay it to staff and see what they can pull out of a hat I think that's I mean as a percentage increase for yes can we just finish the discussion of the table that is information on absolutely so quite staff question the um appendix A and B uh actually which I found a little more useful um I didn't know what yellow signified in this case it just uh is is highlighting view royal there there.
There's no further meaning behind um that see that I you know I guess I think you've got I was there's a high low royal on the with yellow be a medium.
You know, I don't have the answer for that, as I have to admit I did not create this.
No, it's not table.
No, because if you look on uh appendix B, yellow is a city of Victoria.
Well i if if it's been highlighted um then yeah I I uh it w it leads one to ponder.
Just if if you provide the information I need you know all right so anyway we don't know cool I think we're gonna change it tonight so it doesn't really matter yeah you know and I if I could just speak to uh to one of the one of the things that uh we had pondered years ago was you know could we have a um a special tax for vacant land so we get the uh the landowner the baron uh to start moving it so that we could actually get some reasonable taxes that would be of benefit to the community not just that one individual sitting on it.
Um you know, any any thoughts of staff and in um how that might be.
CAO Summerville.
Yeah, uh just I'll answer that one first and then I want to come back to the utility rate.
But um there was for a certain number of municipalities uh something called a flat tax.
And um I think five communities are grandfathered in now.
Um they don't allow it anymore, but you were you were allowed things like flat tax or parcel tax.
You are allowed to have different tax rates depending on vacant or not.
But under our tax scheme, there's no method to do that.
Um just wanted to come back to the highest rates for utilities.
Um URL should be very proud of that.
There's no reason for any municipality in the CRD to have anything less than $40 per thousand.
That's the maximum, which is also set in uh set by the province based on another municipality I worked in.
But we should absolutely be uh setting that tax rate for utilities as high as possible, which is 40 per thousand.
So can you define what areas in View Royal are utilities?
Uh anything owned by the utility company, so that would be um electric gas, uh telephone fine.
I'm I'm happy with the E19.
Uh what about the farms in View Royal?
Consider as farms.
Are those the farms by close to Highland Pacific and perhaps on months?
On Atkins.
Yeah, and our little road is ALR.
And we own, so I don't think we're paying taxes on it.
Yeah.
Okay.
Use obsessed a high tax rate just so that we pay a decent amount.
So well yeah be nice to be able to see on a map where those farms are and again that would be just my concern for my colleagues.
I mean if it is a useful functioning farm um are we is that really high considering the CRD low and and median for it.
Just an example years ago, there was a farm assessed property in off beach drive, and they grew tulips or something that were worth $25,000.
Yeah, and so they had a $10 million house, and they were paying next to nothing and farm properties, so they increased.
And so we've got all these big houses on big properties.
Well, not that big, but we have you know, someone's got a nice piece of property, they aren't really doing much farming on it.
And because it's a farm, unless you raise they're paying next next to nothing on tax.
Yes, they brand a Pollock farm on Atkins Road.
He has his own personal residence and he also has a rental house on the property.
So there's two houses, big piece of property, uh, cows, horse, uh, veggies, uh, which he sells commercially, so it is a farm, but there are also two houses on it, and it's a big piece of property.
So um that would well, he I'm sure he's making money, so um it's not a case if he's gonna fold or anything, but he should be paying uh a decent rate for sure.
And I believe it's the only functioning farm in Barbara.
I believe it is, yeah.
Yeah.
Yes.
Uh I can volunteer that staff could bring a report on which ten properties are classed as farm, and we could bring that to the next council meeting.
Yeah.
Ten is surprising by that.
Yeah.
Yeah.
Okay, so back to the suggestion that we do a round table on what we could live with, um, or with we've, you know, the best we can do for our taxpayers.
Should we do that?
I got to start.
Start with you, Councillor Brown.
Oh, thank you.
Um, to me, anything below 10 is great, 9.9 or bust.
Mayor Tobias, do you want to weigh in?
This is about tax rates, not about percentage for this year's taxes, so correct?
This is about the percentage that when you when you write when you write your letter and your tax your tax letter, you're gonna say on average they're gonna go up X percent.
Right.
This is Yep, this is how much rates we're all paying for the different classes of taxes, right?
Uh for for us.
So I am happy with the tax rates as they are for this year.
Great question.
So 11 the what has been presented to us is that on average, am I correct?
Um Director Bella, um residential taxes will go up 11.25%.
11.25% represents the 1.4 million dollars in incremental taxation revenue required to follow through on the draft financial plan the operational yes as presented understood yeah i i would be more comfortable with something like 8.8 9.9 8.8 um i'm gonna say nine point nine five counselor rogers i support staff's recommendation i think it's certified uh it's in keeping with the other municipalities and and yeah staff's recommendation 11 was 11.25 John it's in mic please, Councillor Rogers.
Or Matt.
Under ten, sorry under 10 counselor matt macilor Matt Mackenzie.
Uh similar around nine.
Okay.
Here we go.
So we've got a range of eight point eight, generally under ten, with the exception of Counselor Rogers, who is content with eleven point two five.
Cool.
Oh.
The Director of Finance will do the math.
Come up with an average of what council discussed.
I just wondered if I could change my number to fifteen.
Locked in.
Um CAO update.
Yeah.
Uh we weren't sure we were going to put that on this meeting because we have other pressing business, but um, before you this evening is a review of different departmental activities.
And uh those of us that are still here are happy to take questions.
I would like to say that the newsletter was very newsy and well done all around.
And I've been asked from a member, the member, other member of my household to relate that.
Speaking to the newsletter, um, I think one of the the well, very good information.
I would I'm specifically thinking of uh Canada Day, and I'm glad that we uh we noted uh you know and give it a heads up for volunteers and um uh but I couldn't find the website reference to Canada Day July 1.
Is it actually posted on on the uh website?
Because I you know coming from what the newsletter said, I couldn't find it.
There may not be a lot of information yet, but I will look to see that it's there.
Yeah, we're and we're we're working with Gary.
We're um uh gonna do a very close um review of what um Sanus is doing with their uh gorge days and start some coordination uh on what uh the times, the amenities, the uh where the amen uh washrooms and so forth, what the bus routes are so hopefully uh we'll we'll be able to produce a map that's going to be really really useful for everybody and I was wondering which staff followed those geeks around for the full day to come up with an average of three pounds yeah you have to ask Steve Pomero about that quick use fact I didn't know it myself but figured it'd be a fun fact uh I must have turned it off.
The um business mixer workshop um was really well it was well attended, but it was well well conducted.
And um the those who participated were not sorry.
They really appreciated it.
So thank you, Staff.
Okay, so the resulting uh average percent came out to 9.8 as recommended uh not formally uh but within the report uh the um strategy of pulling in prior year surplus to offset that would be our plan.
That would be to the tune of $174,000.
Not cutting some costs out.
Sorry, I m my only thought is that if we take if we use revenue for that next year, we're just gonna have to bring that one and a half percent back in.
So we're really not, we're just deferring a percent and a half, is that not correct?
It would be a shift to next year, correct?
So that seven percent that we were gonna do next year would be eight and a half percent.
So it's not really cut, it's just a deferral.
Councilor Rogers.
Yeah, so uh let me uh see if I understand.
Um from what the staff's recommendation was to the an average of nine point eight, uh that can easily be achieved by taking a portion of the uh surplus cash.
Is that correct?
And sorry, how much was that surplus cash that would uh achieve that?
Sorry, you're asking how much are key.
Yeah, how much of the surplus eight million would uh achieve um uh bring it from just for this point five down to nine point eight.
Oh, is that right, eh?
174,000.
Yeah.
Interesting.
Because um, you know, the other, as I'd asked earlier this evening was um uh whether staff had given some thoughts of moving um some of the projects or some of the initiatives um for this year to um the following year.
I just uh wondered if staff could comment on that.
Um staff wouldn't do that for the purposes of changing the tax rate as the projects aren't funded out of direct taxation.
So thank you.
I I think there's no good time for a tax increase.
There was COVID, there was after COVID, now we got Trump tariffs.
There's no good time for a tax increase.
This is going to be a significant tax increase as it is.
Um I'm glad we didn't get into the habit of cutting things that weren't affecting our tax law.
Um I I also have a concern about borrowing from tomorrow to pay for the day.
There is a fuzzy area though in my mind.
Nobody's been able to convince me otherwise, and it's not because of um experimental drugs as a youth.
It is a fuzzy area in my mind about different people's perception of how much you put away into a surplus, how much you put away into it.
We have over 50 million dollars put away.
Right?
There are those out there that says say you're not putting away enough.
There's a whole other people that's saying you're putting away too much.
Right.
So there's no consensus on the best way to do.
If you talk to an a risk adverse accountant they're saying you should double that.
You know if you're talking to somebody that's paying the taxes we're putting in too much.
You know, somewhere there's a balance in between there.
And really I think about one percent is about a hundred thousand dollars.
Steve, is that about right in View royal Language?
About one twenty or so.
About 120 now?
Approximately.
Um so that's what we're talking about.
We're talking about uh borrowing less than a director's salary to offset our taxes for everybody across the board.
I don't have a problem with that.
Thank you.
Thank you.
I don't have a problem with that.
And you know, and I and I think people feel, you know, not just worried and, you know, uh packing around a kernel of dread in their in their gut, but they're being hammered in really basic things except gas now.
Um, you know, I uh I I uh I I I think it's really hard for a lot of people who are, you know, juggling mortgages and and uh where they were paying, you know ten dollars a few months ago for a big square thing of yogurt now they're paying 17 uh so it's it's I I think that if if we have some surplus that well we have surplus I I would like to keep it under 10 so I'm I'm gonna stick to that line.
So um again I just want to have to uh be sure because um one of the um page four of the sustainability infrastructure replacement plan um is is so critical.
So I just want to make sure that um um again we are going we are on target to um achieving those bullets on uh page four for the inf infrastructure replacement plan financial strategies.
I'll just speak to that really quickly.
Um last year, I think it was my first meeting here in January, uh Chris Payne came and talked about how much money we should be putting into the infrastructure reserves.
Um off the top of my head, I believe that was about 4.9 million dollars per year.
Um I suppose we should be we should be proud that we're halfway there.
We've got a ways to go uh to put money aside for future generations, but this is likely the most money that's been put towards that in View Royal's history.
Wait, my next question now that we've kind of got did the averaging, um, um, you know, do we have make a motion on um on what you know we set the rate at 9.8?
I guess that's when Allison comes back.
So you probably need that confirmation.
Uh that would be fantastic.
Yeah.
My second question is um still some outstanding uh questions on the projects list.
I don't know if we want to do it tonight or another time, but you know, there's some things that I I um you know um I want to address.
When would you like to do that?
How many a lot of them we've already approved.
And I think we're about halfway through that.
Yeah.
No, no, I mean a lot of them we pre-approved at council.
Well that that was last year.
You see this you know the the a lot of these were last year's items and so we've there is the presumption that sorry um the presumption is that we approved them last year, and so we're just going to carry on with the approvals of this year.
And uh with you know a few changes.
Ron's point is the um the expenditure on VOL park.
I want to adjust that.
And um so the question is when can we have that discussion too?
Because of course not only, you know, did we have great discussions about the new items, um, I think we have to do a uh reality check on the existings and those implications of do staff have enough time to actually do it?
Uh it's still a hell of a lot of project money that's going out.
And um I'm st I'm still one of the things I haven't talked about is my comfort level on where the reserves are and how good we are, how solid those are, given uh the lack of development funds that's gonna be coming in this year or maybe next, whenever Trump is in.
So okay.
Um just want to remind council that when when you approve the five-year plan you're approving the year that you're in so tonight we're approving 2025 and we're basically approving until May 15th of 2026 so um any projects that haven't been started that were in year two of the previous financial plan any projects that are are not started already are fair game to discuss um but there might be some of the projects that were scheduled in 2025 that have already begun.
I that I fully appreciate, but um uh the mayor's point about uh C zero one twenty-eight or whatever it was, you know, on Watkins and Helmaken, you know, we put the brakes on it and um you know f for good reason.
So now we're uh and that was just starting we I would hold out of that just in the nick of time.
So I think there's others that we should um that haven't started that we need to have a look at and and uh for example we haven't started the work on V Well Park yet, I assume, because there's no budget approved.
Um yeah.
Uh Chair the in twenty twenty-four the town did complete one project there.
So I'm confused what the question is.
So uh my question is, um when shall we have uh you know a full discussion on this?
Do you want to do it now?
I'm I'm okay, but maybe others would like to I I think first let's have the vote on the tax rate.
And then if you know um you guys are people good to stay for what another till nine o'clock.
8.8 was it?
9.8 uh with the uh difference made up from our reserves.
The surplus, yeah.
Second.
All those in favor?
Opposed.
Tax rate will be set at 9.8.
Thank you all.
Thank you, staff.
Um, so we're gonna how are we gonna do the the projects in the book?
Do you want I have one that I would like to take a look at.
And um do you have any counselor brown?
Oh whoops let's pull specific ones out rather than going through the whole thing.
Oh absolutely that's why I wondered if you had any in mind.
Personally I'm tired.
I'm sure other people are too but let's just if we have specific concerns let's deal with that.
Fair enough.
Absolutely.
Counselor Matson.
I'm just wondering if given the people are tired and cranky of whether we do it tonight or bring it back for the next meeting and just come half an hour early or something and do them then when we're awake.
Sounds good to me.
So are we all right?
Do we do it?
That's a reasonable solution.
You know, if we block an hour.
Sorry, if we block an hour for a next meeting to uh get through those.
I thought we tentatively planned uh a meeting on the 10th, did we not?
Okay.
So can we not do it on the 10th?
I'm happy to.
You're gonna be at the West Shore meeting, Weshoe Parks.
Do you mind if we carry on?
Thanks.
I won't be here.
What?
Where the heck are you gonna be?
So moving on then to portfolio reports, and I'm gonna pass the chair to you if you'll accept it, Mayor Tobias.
Uh I'll just be brief, but I'll let you keep the chair because it's nice that you have it and I don't tonight.
Um just a brief update.
We're doing the majority of the finance we do every year with this budget.
I just want to give folks an update that I've been working with the two other mayors to come across some I wouldn't call it governance.
It would be um working with the RCMP to figure out some of the service levels, the things we should be paying into or paying attention to, uh, and just in improving our ability to work with decision making.
Um, so it may not be me on that one.
That's something council will decide.
I'm just setting up a framework that works for um the other two communities as well as the RCMP, so that in the future we can have proactive discussions.
Doing things like um when we get into the cop for pop ratio, doing things like what population data are we using?
The RCMP uses one, BC Stats uses one, um, the contract for the RCMP uses census data, and using what data, when would we that become um uh enacted for us, right?
Figuring out some of those thresholds so that we're all talking the same language with the same data set, which I think is important, but more to follow on that.
And that is all I have, Adam Chair.
Thank you, sir.
Um pass it to the chair to protective services and counselor Brown.
Thank you, Councillor Lemon, Acting Chair.
Um certainly had uh banked a lot of hours of uh committee work this week, and it was actually quite rewarding.
Uh a lot of times committees can be a little dull, a little boring, a little redundant, but actually uh uh they're quite inspirational this week.
And I hope the family youth and court justice committee tomorrow will be just as scintillating with Mayor Little chairing from the chosen.
Anyway, um the foundry went to the first meeting by the foundry.
The foundry is funded by Ministry of Health and uh um the foundation uh uh foundry Canada and uh they're they provide uh they're filling in the gaps for youth ages 12 to 24 years of age uh in the West Shore.
Um they they're looking for space a permanent space but they provide counseling services um employment uh and education uh physical and uh sexual health care um and anyways it's it it's a quite an interesting group it's quite dynamic they meet at the uh D D uh family services uh uh building it's on uh right across from uh Belmont Park anyway.
Uh nice building I've never been in there before I've been by it lots of times but uh it's a good it's good it's gonna be something good so I I know they made a presentation here and I volunteered myself to be part of that committee and uh quite quite rewarding also I went to SIP today uh South Island Prosperity Partners and I met Aaron Stone the new CAO which is uh nice fellow he was very happy that he met with Mayor Tobias said it was a very fruitful meeting and I I can certainly say uh a year ago being on that committee uh I wondered probably like a lot of people like what are we getting for money because we're paying like $22 and a half thousand dollars a year for the membership.
But it it's it's actually quite a high level and it's quite some really interesting ideas and concepts and they can act as a um to get to the pet places where but just for example with a coffee shop in soup that closed recently and they um the people in the community wanted to keep it running.
It's called stick in the mud and uh they arranged with the staff to take over the the the business as a co-op and uh it's running up and running and they they facilitated that working with the Coast Capital is one of the sponsors for SIP.
So they got some big comp not only the municipalities that participate but also a lot of uh business sponsors as well.
Um they put a put a big conference on every October.
It's called Emerging Emerging Uh Economies.
And I would highly recommend that that someone else besides myself.
I'm gonna go, but someone they have two probably two tickets to it every year in this they bring in some really dynamic speakers.
And Aaron's got a really um uh diverse background in promoting uh economic opportunities uh for for V Royal and he wants to come and make a presentation to us at some point in May or June and it would be good to uh for us to hear about it rather than just just me going all the time and they have they have a good lunch too which is always uh a little uh extra thing but anyway um yeah so that's uh that's good and I'm looking forward to well uh hopefully the meeting will be scintillating tomorrow the one that Ron used to be on the parks the courts youth and court committee yeah anyway that's my report um i'm up um uh counselor kualowicz is absent so arts and library uh look the last library meeting it i i think i think it's been said before that the um provincial funding for the library has not increased at all since 2009 so we're 16 16 years behind in you know the the the the greatest um well what should have been the greatest funding bundle and now with the tariffs so many books so many books most books perhaps um magazines new york times everything is going to be subject to tariff so it's it's a it it's a concerning it's a concerning time for the library about you know how to how to keep enough fresh stock on shelves and and digitally and um and and available to readers so that's just a reality you know it it's it's it's hitting it's hitting every sector um and the uh do do do do um oh wonder if you could performing arts Society on the the um society is going to be holding a all-day, I believe, workshop on April 26th, in which they're going to be um uh oh gosh, I can't find the find I can't find the word for this, but um more than brainstorming concepts and coming up with arc architectural concepts about what a um performing arts center could and should look like.
Oh, there it is.
Yeah, thank you.
And thank you, thank you.
Um, the art of the possible.
There you go.
Um leaders from government education nonprofit organized look for practical win-win-win ways to build our community.
This actually doesn't say exactly what they're going to be doing, but oh, so this is May 8th no this this is April 26th is is the workshop but this is a whole other thing um but thank you thank you thank you counselor Brown um so anyway if how how a performing arts center can take shape and what it might look look like and that's it for me um I'm gonna pass it on to you Councillor McKenzie for environment parks and recreation thank you um in terms of the West Shore Parks and Rec I think the big item really there is the regional parks and recreation facilities master plan update.
So I uh last time I spoke about they were doing engagements, so those took place, and uh it was reported back that quite a few uh well, a lot of people participated, so they were very happy with the quality and and quantity of feedback into that.
So it'll be exciting to see.
And um, as of the last meeting in March, they did say crews would be on site for the pickleball court.
So maybe when I'm there on Thursday, I'll see uh those underway.
Uh in terms of the CRD Intermunicipal Climate Action Task Force, it was actually a really interesting meeting um last month.
We were looking at the climate action strategy renewal, and so we were looking at the goals and feeding into those and giving our f our feedback on on that.
So um, yeah, I think that it's all for me, unless there's any questions.
So I'll be handing over to Councillor Mattson.
No.
Okay.
I'm still working with the South Island Division of Family Practice to come with a proposal to council respecting the uh how we can add additional physicians for uh View Rural residents in View Royal.
And um yeah, that's about all I can say at this current time.
Hi.
Yeah, so with respect to a transportation public works, um uh as you know we had the open house and and uh grand ceremony opening for the handy dart facility, and uh your worship you were MCing very well, thank you.
And a good turnout.
It was uh very energized.
I had uh 2,000 people uh come to attend the the open house with a great deal of excitement and and um uh most impressed with uh how staff had the display boards and uh you could really learn about the the whole site and and um and how the electrification worked.
My goodness, it was uh pretty profound.
One of the um interesting things will be to see how the all those buses managed to do a left out uh to go to the West Shore.
Um, you know, hopefully they're successful and uh that works um uh but uh as opposed to going around to walk this way, but we'll see how that goes.
That'll be a test.
We'll all be able to sit um in the park and watch them try to do a left out.
Um speaking of left out, uh the good folks on Price Road are um really distressed because they no longer have any kinds of safety in order to do a left out uh to the six-mile or to where shore parks are wrecked or anywhere in that direction is too darn dangerous.
Uh the bus lane and and so forth.
We're going to do a little experiment.
I'm gonna uh go and um press the uh the light for them and um uh you know the midway um and see if that affects any possibility of them getting out, but it uh looks pretty scary.
Um observing Erston Lane, um, enormous amount of traffic up and down uh that street uh from from the buildings.
It's uh is really particularly at um you know as in the evenings that I've seen.
So we'll we'll be uh it'll be interesting to see what happens then when number seven comes online and number 10.
And um I I think um uh we really should uh somehow magically uh find a way of getting a um a one-lane exit uh from Erskine down around the hospital way, like we did for um Atkins, or sorry, Aldersmith, uh and that development.
It's um it it the uh if we think Eltham is going to be a disaster, uh the those people waiting for the light down a slippery hill will be um uh could be even that much more precarious.
So let's wait and see on the good and fantastic news um the petition by those dear residents finally paid off and Atkins is going to get their sidewalk thank god that's been very precarious very dangerous for ever since the very first uh transportation master plan of U Oil and uh a huge achievement uh so thanks to everybody who'd made that happen I didn't think the government funding was going to ever come across but it did thought Marks.
Thank you.
Do I have a question for Councillor Rogers?
Not to be a fly in the ointment on the announcement on of the uh tra new transit facility in Vall.
But wasn't that entire property zoned park at one time?
Don't you see the trees?
Actually, the the uh to not to be facetious, but um remarkably um uh transit did get um uh salmon in the city award, which is only the only one uh that's been awarded on the island.
So and considering the um the the minefield of rocks and so on, uh I suppose um opening up a stream and actually having uh fish coming upstream, it is uh it has its benefits.
Yes, but the province did stick ram that down our throats and not give us any opportunity.
It's true, they didn't even give us the park.
We only got it for 10 years thank you everyone um so we're at question period there's nobody here and I think all the questions that needed to be asked in this room have been asked so Carl would we got any questions online um anyone come through with a curiosity no uh comments this evening okay thank you very much Carl and uh that that's it can we have a motion to terminate?
Second.
Sid seconded.
Oh said seconded updated?
Moved by councillor brown, seconded by Mayor Tobias.
All in favor.
Terminated.
Thank you.