The Special Committee of the Whole met to continue deliberations on the 2021-2025 Five Year Financial Plan, reviewing Non-Core and Capital budget requests by department. Key approvals included funding a new full-time firefighter position (N085) and the innovative volunteer staffing restructure plan (N086). Council supported moving forward with several design and planning phases using reserves (such as Atkins Road roundabout design and Fort Victoria sewer capacity studies), but deferred many projects to subsequent years (including Urban Forestry Strategy, Helmcken Park Master Plan, LED lighting upgrade, and Watkiss Way sidewalk design) to mitigate immediate costs and pending OCP results. The Town Hall lunchroom renovation ($50,000) was approved despite some opposition to the timing.

11
Agenda Items
2/2
Motions Passed
2h 25m
Duration
15
Participants

Transcript

1637 segments
David Screech0:00

So good evening, everyone.

David Screech0:02

I'm going to call the committee of the whole meeting to order.

David Screech0:06

And we recognize the Lakwangan speaking people, known today as the Esquimalt Nation and Songhees Nation, and that their historic connections to these lands continue to this day.

David Screech0:17

This meeting is being held under the auspices of Ministerial Order M192 due to the COVID-19 pandemic.

David Screech0:25

So there will be public participation this evening and question period for those who who wish to.

David Screech0:32

The instructions are on your screen for dialing in.

David Screech0:36

You can see the number there and the conference ID that you need to enter.

David Screech0:42

And at the appropriate time in the agenda, I will ask, announce the last four digits of your phone number and then give you the instructions on how to speak to us.

David Screech0:52

And we just need your name and address to start.

David Screech0:55

The chat feature is also open.

David Screech0:58

And again, we would like your name and address.

David Screech1:00

This meeting will be recorded by participating in this webcast.

David Screech1:04

You are consenting to being recorded, and the recording will be available on town's website for future access.

David Screech1:11

Thank you.

David Screech1:12

And then we just need a motion to approve the agenda.

David Screech1:15

So moved.

David Screech1:15

Second.

David Screech1:17

All in favor.

David Screech1:26

Staff that there's no callers on the line or on the chat feature.

Ron Mattson1:32

You are correct, your worship.

John Rosenberg1:33

There are no callers.

David Screech1:35

Okay, thank you.

David Screech1:36

And no one on the chat feature.

Damon Christenson1:38

There are no chat comments this evening, Mayor Screech.

David Screech1:41

Okay.

David Screech1:41

Thanks very much.

David Screech1:43

And so I will turn it over to staff.

Damon Christenson1:48

Thank you, Your Worship.

Damon Christenson1:50

Damon Christenson, Director of Finance here.

Damon Christenson1:52

Welcome to budget, day two.

Damon Christenson1:56

I know that uh we're not quite halfway through, and I really appreciate council's patience and all of the hard work of staff as well that that takes us to this point in the budget cycle.

Damon Christenson2:10

Just before we get started, and I don't have a presentation tonight, I just have just a few brief comments.

Damon Christenson2:16

First, firstly, your worship, I just wanted to make sure that you uh knew that we have noted your question of yesterday, but we don't have a response prepared for you tonight.

Damon Christenson2:30

Fortunately, we have another session scheduled for tomorrow night, and we plan to give you a little bit of a briefing on the breakdown that you were wanting for the 2.2% discussed.

Damon Christenson2:43

Okay.

Damon Christenson2:44

So we'll we'll look forward to that tomorrow and we'll make sure that we uh hopefully answer all of your your question about that then.

Damon Christenson2:52

So tonight what we're gonna do is we're gonna kind of pick up where we left off on our non core items.

Damon Christenson2:59

I just wanted to uh make sure that we're all going to uh be on the same page and we know where things uh where things are at.

Damon Christenson3:07

We're going through the non core requests.

Damon Christenson3:10

The non core listing is in your tab two of your budget binder.

Damon Christenson3:16

And the project summaries that are referenced there by the project summary number are found in tab five in alphanumeric order.

Damon Christenson3:27

What I'm going to do is I am going to share my screen.

Damon Christenson3:31

And I encourage you, if if you wish, to uh look at what is on the screen because that will help you, I hope, um kind of um uh keep up with exactly what item is being discussed at the moment.

Damon Christenson3:50

For example, you'll see the full-time firefighter staff increase, which will be the first item under discussion because we're starting with protective services.

Damon Christenson3:58

We concluded with general government services yesterday.

Damon Christenson3:59

And you'll see the reference number here, N85.

Damon Christenson4:05

Um if on the screen also is the financial information pertaining to this project summary.

Damon Christenson4:11

On the bottom section is the proposed uh costs, expenses on in each of the years of the five-year plan that this project summary proposes to spend money in, and also where the funding is coming from on the right side.

Damon Christenson4:26

So I I know it's a lot of information and perhaps it's better seen on the screen to your left against the wall as opposed to the one on the back.

Damon Christenson4:34

I've tried to make it as big as I can.

Damon Christenson4:37

Um, but you know, so so if if uh that works for you, that's great.

Damon Christenson4:41

Otherwise, this is exactly the same information that is in your booklet.

Damon Christenson4:47

So with that being said, that's all the comments that I have.

Damon Christenson4:53

If there are any other questions that you want us to to deal with before we get into non core or at least to make note of before we get started, I'm happy to take those now.

David Screech5:07

Okay, I think everyone's good.

David Screech5:09

So we'll just start right with um N085.

Paul Hurst5:24

Good evening, Mayor and Council.

Paul Hurst5:29

Um, so turn to tab two and we'll just go through the non-core requests in detail for protective services.

Paul Hurst5:37

Uh this year, um, Protective Services has a total of six requests, four of which are grant funded, two are from taxation.

Paul Hurst5:46

We'll go through each one in detail and more than happy to answer any questions.

Paul Hurst5:50

I'll give a brief explanation of each one, kind of a reader's digest version.

Paul Hurst5:53

And then if you've got any questions, please feel free to ask.

Paul Hurst5:56

Starting out with uh N085, full-time firefighter staff increase.

Paul Hurst6:03

This is a request for a full-time staff member for a September or October start date in 2021 for a total of $35,725.

Paul Hurst6:17

The fire department hasn't realized any staffing increases since 2009 in a full-time capacity.

Paul Hurst6:25

This particular FTE request was put off and deferred in uh 18 as well as 19 and 2020 for a myriad of reasons.

Paul Hurst6:36

It's come to the point now where it's it's critical that I actually fill this position as part of not only succession planning for the fire department to supplement the emergency program, but also it ties in with our our volunteer staffing model, and that's down further in the uh in the requests.

Paul Hurst6:53

Um the September start realizes um a bit of a savings for the year and then of course in 2022 we would realize the full funding and that's 102620 and that's wages benefits and all associated costs whether it be uniforms training whatnot for that particular staff member and they'd be on a four step process starting at the lowest wage at step four and working the way up over the course of four years I'll open it up to questions on that particular one and then I guess we can move on if if you like thanks counselor that man yeah, Paul.

Gery Lemon7:31

Um I'm looking at the um the salary, it's it appears to be the same from year one to year five.

John Rogers7:43

Is that plausible?

Paul Hurst7:43

No, that's uh that's a good question.

Paul Hurst7:49

Um inherently the steps are there's about a 10% separation increase in each year between their steps.

Paul Hurst8:00

So they started I believe it's 70 percent of the first class rate.

Paul Hurst8:04

Uh 80, 90, and 100 percent.

Paul Hurst8:06

So those those numbers for year two, three, and four are incorrect.

Gery Lemon8:10

Okay, and and for year one and two, they are correct.

Paul Hurst8:13

Year one is correct, year two is correct.

Paul Hurst8:15

Yeah, my apologies.

Paul Hurst8:17

Yours three, four, and five aren't correct, and I'll get those numbers for you.

Ron Mattson8:20

Thank you.

David Screech8:22

Councillor Matson.

Paul Hurst8:24

Okay, Ryan, let's do it.

Ron Mattson8:26

As our good friend Joe would say, Come on, man.

Ron Mattson8:33

Um so why what's different?

Ron Mattson8:38

Uh what didn't happen last year because this position, or the last few years because this position wasn't available.

Ron Mattson8:45

And what happens if it stays, if it's pushed off for another two or three years until we have sufficient funds?

Paul Hurst8:52

I think my challenge is now is I mean, obviously, the town in demographics building stock call volume since 2009 has changed significantly.

Paul Hurst9:03

When I previous to my request, I had uh the building official and the bylaw officer were also working at City Hall, they were volunteer firefighters.

Paul Hurst9:12

They were offsetting the full-time compliment, so they were working weekend shifts and they were backfilling for overtime when paid staff were off.

Paul Hurst9:14

Those two individuals are no longer with the organization.

Paul Hurst9:22

So that's left that's left a pretty significant gap in our daytime response and our daytime operations, in that Gary and Enzo used to respond.

Paul Hurst9:30

One would work with Troy, and now those two positions are gone.

Paul Hurst9:37

Keeping our commitment to our neighbors, um, both Langford and Colwood have had significant, or Callwood will have an increase this year and next year.

Paul Hurst9:46

Langford, of course, there's a significant increase in their staffing.

Paul Hurst9:50

And I think comparatively, uh, this will put us at seven staff members.

Paul Hurst9:54

Uh Callwood would be at nine, and then Langford would be at 17.

Paul Hurst9:57

And I think in a comparison wise, based on population and budgets, we're we're actually fulfilling our commitment.

Paul Hurst10:05

Having seven staff members actually works perfectly for us from a staffing perspective, and I'll explain that in the other slide with the volunteer restructure in that each paid member uh would work one night shift per week to supervise the volunteer staff.

Paul Hurst10:23

I have six paid staff.

Paul Hurst10:25

I'm included in that rotation, so I would work a night shift as would Heath, Troy, Rob, or sorry, Heath, Troy, Jeff, Joe, and then the other full-time person.

Paul Hurst10:34

So you'd have one full-time person working every night shift with supplementing with the three volunteers, and then those seven paid staff work uh essentially straight days, seven days a week.

Paul Hurst10:44

So it's a shifting pattern where they their pattern starts at six in the morning and ends at six in the evening, but they're staggered throughout the day for different start dates based on the call volumes we have during the day.

Paul Hurst10:55

So I mean, I've without I guess in essence, I mean, approving a full-time firefighter position for us, you get that full-time position immediately.

Paul Hurst11:08

I'm not asking you to fund something in anticipation a year from now, two years from now, where you don't get that position.

Paul Hurst11:16

Um, you know, I deferred it in 18 and 19.

Paul Hurst11:19

Um, and I can't uh there were probably a myriad of reasons.

Paul Hurst11:23

Um, there's either other staffing requests, police wanted uh staff member, there were other priorities, so I bumped that back.

Paul Hurst11:30

And I've got to the point now where if I want to take the department to the next level, having that vacancy or not having enough staff, we're starting to fall short in some of our operations during the day.

Ron Mattson11:44

So what happens if we delay it?

Paul Hurst11:48

If I want if I want to maintain if I want to maintain a four-person response during the uh the day or the evening, I would I would fill I'd still fill that position, but it would be with overtime.

Paul Hurst11:58

I'd I have to bring someone in and cover it with overtime or out of a different account.

Ron Mattson12:02

Wouldn't it be more efficient to get a building, hire a building inspector who wants to be a volunteer fireman and take that do the same work that was done before?

Paul Hurst12:09

That's funny.

Paul Hurst12:09

You said we could talk about building inspectors and how difficult that is to find right now.

Paul Hurst12:13

That's a challenge.

David Screech12:14

I don't necessarily have any questions.

Paul Hurst12:15

Yeah.

David Screech12:16

Counselor Kowalovich.

Damian Kowalewich12:21

I've had a pretty detailed look at both uh N85 and then how it correlates with this volunteer staffing restructure plan.

Damian Kowalewich12:31

I feel comfortable with the proposal.

Damian Kowalewich12:35

I don't know if we're at the discussion stage with colleagues yet, but if anyone has questions, we can take a turn.

David Screech12:41

Okay, thank you.

David Screech12:42

Counselor Rogers.

John Rogers12:44

Yes.

John Rogers12:45

Thanks, Paul.

John Rogers12:46

Uh I think it's um it's justified.

John Rogers12:48

It's been 10 years uh since um we had uh a last increase and and particularly with the challenges of residation and bylaw and and building officer.

John Rogers12:58

The um you know, and and I guess it just really helps to um ensure a composite for our department.

John Rogers13:08

Uh there is an insurance policy to that.

John Rogers13:10

Um I am wondering though, and I don't know if you're gonna be able to or or um others, but on our page fourteen, uh, which was the tax increment commote in increase components.

John Rogers13:23

I'm not quite sure where that would fit.

Paul Hurst13:27

I believe I believe and and perhaps uh our director flexible.

John Rogers13:31

It's in the point eight.

John Rogers13:32

Oh, okay.

John Rogers13:33

Right.

David Screech13:34

It's in the point eight.

David Screech13:35

So is it the point eight, mayor, or is it the point?

John Rogers13:38

Is it so is the fire personnel restructuring?

John Rogers13:42

Is that is that it?

David Screech13:43

No, uh I think is the I don't I don't have that page right in front of me.

David Screech13:48

Um but I think it's in the non core request, right?

David Screech13:52

Oh, that's just the point eight is yeah.

David Screech13:54

Okay.

David Screech13:55

The point five is the assistant chiefs.

John Rogers13:57

Right.

John Rogers13:58

Okay.

John Rogers13:59

Good.

John Rogers13:59

All right.

John Rogers14:00

Thanks for the clarification.

John Rogers14:01

All right, thank you.

David Screech14:03

Okay.

David Screech14:04

I I'm also good with, I mean, you know, I think in the last three months we have approved, I mean, I had a guess I would say about 650 units.

David Screech14:15

Um, so I mean, you know, it doesn't seem unreasonable to me to be hiring one more firefighter.

Paul Hurst14:24

It's not a bad deal compared compared to my neighbor's expenses.

Paul Hurst14:27

Yeah, yeah, yeah.

David Screech14:28

So I mean, I'm I I share counselor Mattson's um apprehension about the having to fund it this year, but I I I certainly support the position.

David Screech14:39

So I'm seeing four nods of heads and a and a frown.

David Screech14:43

Yeah.

Damian Kowalewich14:43

Yeah.

David Screech14:44

So then we'll move on to C059.

Paul Hurst14:51

C059 is EOC equipment and supplies.

Paul Hurst14:56

That's submitted by uh Troy Mullin, our emergency program officer.

Paul Hurst15:01

That is a um a grant, provincial grant funded initiative.

Paul Hurst15:06

And uh so that's too um that's to acquire uh supplies for the EOC team, which is uh commercial radio installations, some laptops, training, education, checklists, food, betting, and that's Troy's standard annual uh UBCM grant applications.

Paul Hurst15:27

That's a 100% uh funded uh from grant.

Ron Mattson15:31

Okay, I just wanted to point out that I am in support of that one.

David Screech15:34

Okay, so I'm sorry.

Paul Hurst15:41

Moving down to ESS Equipment and Supplies, that's C046.

Paul Hurst15:45

Right.

Paul Hurst15:46

Again, that is another that is the emergency social services team or support services team, and that is um for betting and cots uh for the community, and that's part of an initiative that we're working with Colwood and Lankford on a mass evacuation and betting plans that's uh a 100 funded from grant uh from ubcm as well local government uh grants that uh troy has put the application in for and i understand he's been giving the thumbs up for that just a question yeah go ahead thanks um i i see that on on whatever this page 31 it shows the cost is uh 1500 but on uh c 46 that it says 2500 yeah by 25 000 so it's 15 i know there's uh 1500, which is the operational, but shouldn't we be still showing um the full amount?

John Rogers16:38

25 000 and the on a portion under the grant column.

Damon Christenson16:44

If I may answer that, uh your worship.

Damon Christenson16:47

Um there are a few, uh just a very select few uh project summaries that have implications for both um operational budgets and capital budgets.

Damon Christenson16:56

And this one and the one just prior has that as well, and that's why it has a C number instead of an N number.

Damon Christenson17:03

So it's a split, but instead of giving you two pages to look at for the same thing, we put it all on one page, but then split the numbers between tab two and tab three, which is your capital budget.

Damon Christenson17:14

So you will see this item again and the and the balance of of it on the capital budget sheet.

Damon Christenson17:20

Thank you.

David Screech17:22

So then the next one is N054, which the next council can decide if they want to add an RCMP officer in 2023.

David Screech17:33

So then we're at N076, which is the community wildfire.

Paul Hurst17:40

That again is a 100% UBCM funded grant.

Paul Hurst17:49

That is for that is to update our FireSmart plan.

Paul Hurst17:52

Our last plan was done in 2007 by Black Bowl Associates in conjunction with the CRD.

Paul Hurst17:57

This will be uh another plan that just updates the O7 recognizing the development now on the Thetis boundary.

Paul Hurst18:05

And that's uh 100% grant funded as well.

David Screech18:08

Okay, Councilor Mattson.

Ron Mattson18:10

So is that do you hire a contractor to do that?

Ron Mattson18:13

How's the 20,000 come into place?

Paul Hurst18:15

That that is that's a contractor out of Vancouver Blackwell Associates or whoever when we put out the RFP.

Paul Hurst18:21

That's who we had last time.

Paul Hurst18:23

Um it's a pretty it's it's done by a registered forester, and they they do all kinds of assessments from fuel loading to setbacks, applying the fire smart principles, and then that guides our development in those regions.

Paul Hurst18:37

So when a developer puts in an application, we refer them to that study, and then they have to build accordingly when they build up against the interface.

David Screech18:45

So okay, I think everyone's good with that.

David Screech18:51

So then we're on to N072.

Paul Hurst18:55

Again, from my emergency program officer, another 100% grant funded through UBCM.

Paul Hurst19:02

That is um N72.

Paul Hurst19:08

And this is an update of the town's emergency response plan.

Paul Hurst19:12

Um obviously to approve efficiencies in emergency management and then align our plan with new provincial standards.

Paul Hurst19:18

So again, this is just an update to our existing plan, and that would be contracted out, and that's uh grant funded as well.

David Screech19:27

Seeing all nodding heads with that.

David Screech19:31

So N 069 is for next year, the energy audit for municipal buildings.

David Screech19:40

John?

John Rogers19:41

Um, I see uh two numbers here 150 and 130.

John Rogers19:44

Sorry, on on the chart.

Paul Hurst19:46

Sorry, counselor, where are you?

John Rogers19:47

Sorry, sorry.

John Rogers19:49

Um when I see 15,000 on on this page 31, but on on the N or whatever it is, uh it shows 30.

Paul Hurst19:56

Oh, for the energy audit?

Paul Hurst19:57

Yeah, it's my understanding that that is split into two separate POS statements.

Paul Hurst20:01

One is for the municipal hall, one is for the public safety building.

Paul Hurst20:04

So there is a there is a second POS statement.

Paul Hurst20:07

It's a and our director of probably correct I'm incorrect.

Paul Hurst20:11

Is that correct, Don?

Damon Christenson20:12

Uh uh very, very close.

Damon Christenson20:14

Um, it is one uh project summary in 69, but it's split between two buckets.

Damon Christenson20:19

We considered this last night when we were talking about general government services, because the other building that would be the subject of this audit would be town hall, so it's split between the cost centers of town hall and the public safety building at $15,000 each.

Damon Christenson20:29

Okay.

David Screech20:34

Why would we?

David Screech20:35

I mean, not that we want to discuss this now because it next year, but I mean the fire hall is a relatively new building.

David Screech20:42

Why would we do an energy audit on an almost brand new building?

Paul Hurst20:47

That's a really good question.

David Screech20:51

So I guess we can we can we can talk about that more that way before it comes to it.

David Screech20:55

Yeah, yeah.

Ron Mattson20:56

I was gonna ask about this building.

Ron Mattson20:57

I mean, when you think about $15,000, that's a lot.

David Screech21:01

Well, well in this new building, I can understand a little bit more, but yeah, so we can put solar panels on the roof.

Ron Mattson21:08

But I mean, what would you do?

Ron Mattson21:10

I mean, I guess that's for next year, but we're doing an audit on something, and I just can't see us spending 15,000 and coming up with solutions that are gonna ever save us fifteen thousand dollars.

Ron Mattson21:14

No, I I don't disagree.

David Screech21:21

Okay, well, we'll save that debate for later on for next year.

David Screech21:26

I can hardly wait.

David Screech21:29

So next we have N075, the energy step code implementation.

David Screech21:36

That's for next year as well.

David Screech21:38

So next call is N086, which is the fire services volunteer staffing restructure.

Paul Hurst21:45

Okay, so in E6, probably probably one of the most significant shifts in response logic for our fire department since its inception 75 years ago.

Paul Hurst21:58

What we've essentially done is is we've been watching for the last you know three to five years the whole notion of volunteer retention, response, how we're able to respond in a timely manner, how we get people from home to the fire station, traffic patterns.

Paul Hurst22:16

We've taken this all into consideration.

Paul Hurst22:18

One of the challenges we we're having is volunteerism across the board is down.

Paul Hurst22:26

Um challenges associated with residing in the town, basement suites.

Paul Hurst22:32

Uh homes are expensive.

Paul Hurst22:34

Um for instance, some of the homes just across some of the new homes across from the fire hall uh are in the 1.2 million dollar range.

Paul Hurst22:40

So the main demographic for our station right now is in the is in the 19 to 32 range, very young, either early family or single.

Paul Hurst22:49

So affordability is is tough for them.

Paul Hurst22:52

What we needed to do is we I I've tried to figure out how do I provide effective cost effective fire protection and meet my BC building code requirements for a 10-minute response 90% of the time with volunteers coming from home, getting into the trucks and wearing the fire.

Paul Hurst23:09

And it at nighttime it's impossible.

Paul Hurst23:10

We can't achieve those numbers simply because there's opportunities where they can't get to the station in a timely fashion, or there's delays built into it.

Paul Hurst23:19

During the day, we're meeting those was the targets 100% all the time.

Paul Hurst23:22

Our average response time during the day is anywhere from from alarms ringing to arrival on doorstep between four and six minutes.

Paul Hurst23:29

At night, it's significantly higher.

Paul Hurst23:29

So two years ago, we talked to the volunteers about when we moved into the new building.

Paul Hurst23:39

We we put two members in the building at night, and they were going to do the routine calls, the medical calls, all that, the nuisance type calls that wake up all the volunteers.

Paul Hurst23:51

We set in motion a plan that said, okay, in 2021, what we want to do is increase that to four.

Paul Hurst23:58

By having four, we can now have four people on a fire truck, they can run that fire truck and they can respond immediately to a fire call.

Paul Hurst24:07

What we did is we looked at all the accounts that we're using right now to compensate the volunteers, and that's their service pay, grants to association, stipends, duty officer pay, their night shift premiums.

Paul Hurst24:21

We combined all those accounts into one account and said to the volunteers, okay, listen, being on call for 30 nights and 30 days a month is obviously becoming too onerous for the staff and the volunteers.

Paul Hurst24:36

What can we do to one lessen that burden and two still deliver a cost effective model?

Paul Hurst24:43

And in talking with the membership, we came up with a plan that said, listen, if I offer you, if I give you four night shifts a month, where you come and you sleep in the building for four nights a month, that's your commitment now, not dissimilar to an auxiliary constable.

Paul Hurst24:58

So, what I can do now is instead of you having to reside in View Royal, I can take a third of the department, a quarter of the department, a half of the department, and I can pick from anywhere in Greater Victoria.

Paul Hurst25:08

And I can say, You're trained, you've got your 1001, you live in Oak Bay, good.

Paul Hurst25:13

You can come be a firefighter in View Royal.

Paul Hurst25:15

You give me four night shifts a month, and that's your commitment.

Paul Hurst25:20

The volunteers will be required to drill every night, they're working night shifts.

Paul Hurst25:24

They're working, they're actually working in the station cleaning, station routines, repairing equipment, and they're responding on calls.

Paul Hurst25:32

Langford started a similar process about three years ago with great success, and about three months ago, they launched the I'll take you from anywhere program, and they were flooded with applications.

Paul Hurst25:44

And in talking with Chief Aubrey at Langford, I believe they they took on 10 members from outside of the Langford area, not in View Royal or Callwood, they from all over Greater Victoria.

Paul Hurst25:54

Of those 10 members, eight of them were on the trucks next the next week.

Paul Hurst25:58

They were qualified, they were ready to go.

Paul Hurst26:00

So having having the volunteers in the building for the four nights is really no different than them giving up four Thursday nights.

Paul Hurst26:08

They're actually working two shifts in addition to that.

Paul Hurst26:11

So this is actually a less commitment for them, and they're able to manage their lives better.

Paul Hurst26:16

So we would have three volunteers in the building at night, and then one career member uh has offered to work one night shift a week, and that's not on overtime.

Paul Hurst26:28

There's nothing attached to that, it's just the stipend to supervise, and that puts four people in the building.

Paul Hurst26:29

That coupled with Langford's four to six in the building.

Paul Hurst26:37

Callwood's just moved to a model where they've started with two people in the building.

Paul Hurst26:40

We have an effective response of three engines immediately to fires in V Royal.

Paul Hurst26:45

We would only then page out the volunteers for large fires in V Royal, second alarms in V Royal, or complex rescues.

Paul Hurst26:53

And this gives people they can set a schedule, they can say, I'm working on this night, this night, and this night.

Paul Hurst26:59

I have a life, I can live my life.

Paul Hurst27:03

By combining the accounts, we're able to fund the program entirely.

Paul Hurst27:07

I just need $14,000 to make this work.

Paul Hurst27:13

The association gave up $10,000 of their grant this year, and they'll give up 20,000 next year.

Paul Hurst27:20

So they'll reduce that.

Paul Hurst27:22

The service pay program goes away.

Paul Hurst27:25

So we're effectively paying people for the work they do.

Paul Hurst27:27

They get a four hour compensation for 12 hours of work.

Paul Hurst27:31

And we we've run this by the association, they're keen.

Paul Hurst27:35

The station is set up for it.

Paul Hurst27:37

We've been doing this now.

Paul Hurst27:39

We did this from March to July, and we've been doing this now since December 20th to today with the COVID, having four people in the building and no one else.

Paul Hurst27:47

And it's been very effective.

Paul Hurst27:49

And we're finding out probably over 90% of the issues that we respond to can be handled by four people without calling in 30 people.

Paul Hurst27:57

So what you're essentially ending up with is a full-time response 24 hours a day, seven days a week, 365 for an additional $14,000 to the volunteer pool.

Paul Hurst28:08

The program itself costs $209,000.

Paul Hurst28:11

I'm $14,000 short.

Paul Hurst28:14

And that is a I believe I had written down here a point something increase in the um in the in the budget.

Paul Hurst28:26

In my budget, point uh 0.15% increase to my operational budget to fund this.

Gery Lemon28:32

Compared to our neighbors at four and a half million and hundreds and millions beside us, this is an incredibly effective and cost efficient model, and and the and the volunteers are on board with it okay thank you Paul Councillor Lemmon um totally on board with this Paul um just a question regarding the the volunteers themselves if they come from anywhere um do they only need to can they expect to only be volunteering in V Royal for four nights or do they need to be you know wherever they live and available on additional nights as well perhaps.

Paul Hurst29:16

So what we did is is we concluded we can't have the entire department living outside the district.

Paul Hurst29:20

So we would come up with a number, say eight members or ten members are allowed to live outside the district, and two thirds live in the district.

Paul Hurst29:27

For instance, we have a member right now that lives in Shawan Lake, and he does as his commitment six night shifts a month.

Paul Hurst29:33

Okay.

Paul Hurst29:33

So he shows up, does his shifts, and that's his commitment.

Paul Hurst29:37

That's great.

Paul Hurst29:37

And that's working well.

David Screech29:39

All right.

David Screech29:39

Thank you.

David Screech29:41

Um on the revenue side of things, just did you have any like with the Songies contract, for example, with their new buildings?

David Screech29:49

Is there any offsetting revenue increases to help with any of these?

Paul Hurst29:54

Or there will be there will be a slight increase because of the uh it was the apartment blocks on Craig Flower.

Paul Hurst30:01

There are some townhouses and some commercial on the Esquamalt Nation.

Paul Hurst30:05

Um I can't get into the other details, but we are going to be um into a contract with the city of Calwood for emergency management services, a three-year contract, and that's an additional $26,000 a year as revenue sale of service.

Paul Hurst30:19

And for the first time since we've moved in all four apartments are occupied and paying rent and that's just shy of $40,000 a year.

Paul Hurst30:30

So I'm managing to set off on set offset most most of that expense with with just the additional revenue from Call with the Songhees and the rental of the apartments.

David Screech30:42

But but this is on the tax roll though.

David Screech30:44

That's why I'm asking right yes so so your new revenue you have factored in already into these numbers?

David Screech30:52

I haven't I haven't done that the 14 000 no I haven't calculated what my what my increase in assessment is going to be from from song he's or a squamalt okay so i guess for dawn that might be an interesting because presumably those new buildings and song he should result in in an increase in revenue on the on the fire service side anyhow maybe we can leave that with staff to to look at but i'm i'm certainly uh supportive of of the of the 14 000 and and i think it's great to see some innovative ways to um to keep the fire hall running as a composite hall.

Paul Hurst31:37

Yeah, absolutely.

Paul Hurst31:37

I mean, this is a model, I think this from a from a longevity point of view, this is probably uh this is a seven to ten year run at that at this at this program where we're able to maintain a status quo for several years to come and not change the model.

David Screech31:53

Counselor Matson.

Ron Mattson31:55

I agree, good job on so I won't anyways.

Ron Mattson31:58

Thank you.

Ron Mattson31:58

Accolades there.

Ron Mattson31:59

Uh curiosity, whatever happened to the ambulance service.

Paul Hurst32:03

They backed out.

Paul Hurst32:04

They they decided to go in a different direction, which is unfortunate.

Paul Hurst32:06

That would have been a significant revenue stream.

Paul Hurst32:08

I would have been asking for probably four or five FDEs, Councillor.

David Screech32:14

Counselor Kowalovich.

Damian Kowalewich32:16

Yeah, I just want to congratulate you on the visioning for this, and obviously, you put a lot of work into this plan, and it's very thoughtful and thorough, and um we're all hopeful that this model will be sustainable for years to come.

Damian Kowalewich32:29

We know that there's challenges ahead.

Damian Kowalewich32:31

But certainly this sets a great framework that uh hopefully will stay in place for as long as possible.

Damian Kowalewich32:38

So thank you.

Paul Hurst32:39

Appreciate that.

Paul Hurst32:40

Thank you.

David Screech32:45

Good.

David Screech32:45

Thank you, Paul.

David Screech32:46

So Nate, sorry.

David Screech32:48

I was just gonna so so maybe staff could just follow up on the because the the full-time firefighter staff increase in this is 50,000, so it's over a half a percent on taxation.

David Screech33:02

So if there is offsetting revenue, it would be um it would be good to know during the process.

David Screech33:07

Okay, okay.

David Screech33:08

Sorry, Paul, what were you gonna say?

Paul Hurst33:09

No, I just uh I just wanted to see if there was anything I've got yeah, I've got N71 couple minutes is next year.

David Screech33:14

Uh N83 is um Ms.

David Screech33:15

So I don't think we'll worry about that.

Paul Hurst33:20

Christensen's uh this is secondary suites on online renewal program.

Damian Kowalewich33:26

I I have a question for that, unless Director Christensen's gonna speak to it.

David Screech33:30

So are we so we're okay, so yeah, so let's go.

David Screech33:34

So you're done, I think.

John Rogers33:35

Paul.

John Rogers33:35

So I can just make a comment.

John Rogers33:37

Yeah, go ahead.

John Rogers33:37

Um, Paul, you know, great way of uh establishing predictability, and I think um and congratulations should also be um extended to the association for their commitment and participation.

Paul Hurst33:50

Absolutely.

Paul Hurst33:51

It's it's a huge commitment on their part, and it's definitely recognized.

Paul Hurst33:55

So I appreciate that.

Paul Hurst33:55

I'll pass that on for sure.

David Screech33:57

Good.

David Screech33:58

Good.

David Screech33:58

Proto, thank you.

David Screech33:59

That's all I've got for you.

Paul Hurst34:00

That's all.

David Screech34:03

So the hazard risk vulnerability assessment is for 2022.

David Screech34:08

2022.

David Screech34:09

And so now we're on to N 083, which is the secondary suites online renewal.

David Screech34:14

Council Qualovich.

Damian Kowalewich34:17

I just had a question, uh, whoever, I'm not sure who's gonna answer it, but probably Don.

Damian Kowalewich34:22

Okay.

Damian Kowalewich34:22

So I'm seeing it's a $5,000 ask, and I know we talked about this probably like the last couple of years.

Damian Kowalewich34:29

Um, and I think it makes sense to do it eventually.

Damian Kowalewich34:32

But I'm just wondering where does the hundred dollars go that each constituent pays for their secondary suite?

Damian Kowalewich34:41

Um this is five thousand dollars to to do that.

Damian Kowalewich34:46

I'm just wondering, does that just go in general revenue, the hundred dollars?

Damon Christenson34:50

Uh yes, that would that would be in our licenses revenue, uh our uh licenses and permits revenue, yes.

Damian Kowalewich34:56

Okay and how many sorry how many ballpark, how many secondary suites are in V Row that are paying that hundred dollar fee done?

Damon Christenson35:07

Well, I can tell you that um our total budget for secondary suite revenue in twenty twenty one is forty one thousand eight hundred and we met um our revenue in 2020 was was just j barely under that.

Damon Christenson35:22

So um you know that that kind of gives you an idea.

Damon Christenson35:26

Maybe around four hundred ish.

David Screech35:29

Yeah, okay.

David Screech35:29

Go ahead.

David Screech35:31

Okay.

Ron Mattson35:33

I had a question about this too.

Ron Mattson35:35

It's yeah, I guess we to Don.

Ron Mattson35:38

So are is for these types of initiatives that people can uh submit claims or register online.

Ron Mattson35:48

Are we actually saving any time and energy for staff?

Damon Christenson35:53

Yes, I can I can certainly attempt to answer that question.

Damon Christenson35:56

Um the the part of the process that this um you know, that we're uh able to do with this is yes, people um, as I understand it, the plan is that we're going to have them be able to download a PDF form, fill it in, and turn it in.

Damon Christenson36:12

But then, of course, after that, there is an approval process, which I'm sure Paul and his crew will know better than I do.

Damon Christenson36:18

Where the efficiencies come in, and specifically, you will notice that this project budget has been reduced from 25,000 to 5,000, and that's because we're going to we plan to leverage the experience that we um had with our business license online renewal program and use that same system to do the same thing for secondary suites.

Damon Christenson36:42

So it's a little bit more about giving people the ability to pay by credit card online, and yes, there are some uh time savings because when people use their credit card to pay online, those transactions are downloaded electronically into our financial system instead of having a person deal with them at the counter uh and and manually enter the the information in so so there is a you know the volume isn't isn't huge so I wouldn't say you know you can even say that there's a lot of money to take to the bank in savings and and uh it m I I think the way that I think of it is that um it is an increase in productivity because now people aren't uh spending their time doing busy work we're downloading the transactions electronically and then they can get on with uh perhaps more important or useful um tra um you know activities.

Damon Christenson37:36

Thank you.

John Rogers37:37

Counselor Rogers yeah thanks it makes sense and it's nice to see that the costs reduce from 25 to 5,000.

John Rogers37:43

You know the um when we had secondary suites we were thinking that uh uh it would be user pay and and the fees would uh cover the cost related to secondary suites but I think we're the the 40,000 whatever there's also the cost of the ongoing inspections so I imagine that that um is is another cost factor that um uh that we're we're trying to compensate for um so yeah I'm fine with this you're suggesting we should increase the costs I wonder we we could increase the secondary suite fee, and um it would offset tax increase.

David Screech38:19

Probably wouldn't go over too well, though.

David Screech38:22

But think of this so okay.

David Screech38:27

So I think everyone's good with that.

David Screech38:30

So wildfire fuel management plan is not until 2023, and then protective services housing feasibility study is not until 2022.

David Screech38:45

And then um, Kim, sorry.

Kim Anema38:49

Should we be talking about that that study in 2022?

Kim Anema38:52

I just heard the fire chief say that you know the volunteer firefighters can come from whatever in Greater Victoria.

Kim Anema38:59

Uh so is housing really a significant issue for volunteer firefighters in our community.

Ron Mattson39:07

Plus, we have three suites at the new Right, Erskin Lane.

David Screech39:13

Well, we haven't decided what we're gonna do with those, but potentially.

David Screech39:16

Yeah, potentially.

David Screech39:17

Yeah.

David Screech39:18

But I'm presuming that, yeah.

David Screech39:20

So, Paul, did you want to speak to this?

David Screech39:22

Uh this N61.

David Screech39:24

Are you prepared to speak to that?

Paul Hurst39:25

Or I'm not prepared, but I can I can echo the CAO's sort of observation on the potential savings there.

Paul Hurst39:32

We have four apartments at the station.

Paul Hurst39:35

We have potential uh at possibly another development, and we're opening up the opportunity for people to volunteer who live outside of the district.

Paul Hurst39:45

This initiative might might solve that problem and save some money.

John Rogers39:49

I so we'll have a year to figure out if it got yeah.

Paul Hurst39:52

Yeah, I I think I think given the year, see how this looks with my retention and and my attraction over the next year.

Paul Hurst39:59

And we can have this discussion next year.

David Screech40:09

We could have at Erskine Lane, right?

David Screech40:11

And decide how and if we're going to deal with that.

David Screech40:15

Yeah.

David Screech40:15

So okay.

David Screech40:17

Great.

David Screech40:18

So we'll leave this one then for next year discussion.

David Screech40:23

So that's it for protective services.

David Screech40:27

Thank you.

David Screech40:27

So thank you.

David Screech40:28

Thank you, Paul.

David Screech40:29

You might be able to get home in time for the Connects game.

John Rogers40:32

Is that it for today?

John Rogers40:33

This is the game.

John Rogers40:34

Yeah.

David Screech40:39

So moving on to transportation services, we've got the first two items are 2022, the active transportation plan and the urban forest strategy.

John Rogers40:50

So the question was you're I'm hoping that we'd be able to move the active transportation plan to 5,000 into this year.

John Rogers40:58

Why?

John Rogers40:59

It's DCCs.

John Rogers41:00

And um you know it it is important.

John Rogers41:02

This is all about um you know the how residents move around and identifying the efficiencies and and I think it's um you know I know that we would we're looking at completing the OCP prior to, but I I think um there's a lot of uh good work that can occur with uh the five thousand five thousand dollars, the start of it, and um we can do the two concurrently.

David Screech41:30

So, staff, are you able to comment on that on workloads and timing and what impacts that might have?

John Rosenberg41:38

Thank you, your worship.

John Rosenberg41:40

My concern wouldn't be um I can't speak to the workload point of view because it basically would be out by a consultant.

John Rosenberg41:46

So I think workload would be fine.

John Rosenberg41:48

My bigger issue would be that I I really think that the philosophies that'll be developed with significant public uh input on the OCP would really help to um provide vital information to an active transportation plan that otherwise we'd basically repeat the processes, the the information gathering we'd have to do um for an active transportation plan that didn't have an OCP that was completed would be significantly different than one that had an OCP that was already flavored with um philosophies behind active transportation assuming that our OCP would show that and I'm sure it would we wouldn't have to spend as much time with public engagement which obviously would save us some significant dollars in the active transportation plan and would also provide us with a little more accuracy with regards to results.

John Rosenberg42:38

So it's not that we couldn't do it concurrently I'd just be nervous about whether we get accurate results and whether we get value for the dollar spent.

David Screech42:48

Okay, thank you, John.

David Screech42:50

Thanks.

Ron Mattson42:50

Councillor Matson this is just a question more generally to us.

Ron Mattson42:54

Like one of the complaints I've heard from our advisory committees is we don't give them anything to do.

Ron Mattson42:59

And I've noticed that through here there's all sorts of studies.

Ron Mattson43:01

And I'm just wondering how we can actually, if it's possible for us to use our advisory committees, ask them if they're interested in actually doing some work.

Ron Mattson43:08

I know a number of them spend a lot of time sort of reviewing and researching things, and um maybe they could actually be of some assistance to us.

David Screech43:21

Well, I'm I'm sure they could be, but whether or not they have the qualifications to develop a plan like this, I think is possibly another thing.

David Screech43:29

But I'm sure they would be part of developing the plan.

David Screech43:34

But I think the bigger question right now is whether there's support to move this up a year, or as staff is saying, which I understand what staff is saying, leave it so that it it sort of comes out of the OCP.

David Screech43:50

Councillor Rogers.

John Rogers43:51

Yeah, thanks.

John Rogers43:52

Um, you know, one of the things that uh I remember the last time with the 2011 OCP, um, we held that off so that we could create a um, and one of the first things we we had as as the um as the cornerstone was a transportation master plan.

John Rogers44:09

We got that done, and then we did the OCP.

John Rogers44:12

Um, and so there was, you know, that that was if you like the the foundation for for the OCP.

John Rogers44:18

And and um, but I think you know, the these the the major benefits that uh staff have pointed out are um you know reduction of pollution GHCs and all those really important things that um uh that will do you know that kind of coincides with um uh the climate action plan so it's um you know if we're if we're gonna be putting a grant forward for the climate action um and I would suggest that this is um more a a link to that um and a follow through for uh and giving uh strength and information to the OCP but you could also argue then that we should see the climate action plan before we develop the act of transportation plan well concurrently yeah.

David Screech45:02

So I I'm fine with with leaving it as it is.

David Screech45:05

I'm seeing general nodding around the table.

John Rogers45:09

That's right.

David Screech45:11

Okay.

David Screech45:13

Come on, you guys.

John Rogers45:15

Let's put it to a vote.

David Screech45:18

Well, we've got four.

David Screech45:22

So on that urban forestry strategy for 2022.

David Screech45:29

Now, I mean, given our finances, is that something we're actually gonna want to do next year?

David Screech45:34

No.

David Screech45:34

I think it's a I think it's what a surprise, Ryan.

David Screech45:40

Um what is it?

John Rogers45:41

It's casino.

David Screech45:44

But but again, given our our you know, the casino's dicey.

David Screech45:48

I know.

David Screech45:48

I mean, do do we want to just maybe bump that at least one more year down the road?

David Screech45:53

And yeah.

David Screech45:54

So okay.

David Screech45:56

So staff seeing general nodding, I think on that.

Ron Mattson45:59

Yeah, somebody said like the urban forestry strategy.

Ron Mattson46:02

I mean, if we're spending $10,000 a year to do boulevard trees, I mean, what more is the urban forestry strategy going to tell us?

Ron Mattson46:13

I'm sorry, a lot of these things I just sound really nice, but what how much benefit are they to the community?

David Screech46:21

Well, I mean, I don't disagree, but I do think the forest strategy is actually probably a pretty important one.

David Screech46:26

And the, you know, when you think the amount of the tree cover that disappears in the CRD every five years is is pretty amazing.

David Screech46:34

So definite strategies of how we renew that.

David Screech46:37

However, the federal government is is planting something like 25 billion trees.

David Screech46:41

So we're hoping maybe we can we can cash in on those and we won't need to do it.

David Screech46:44

But at any rate, if we if we if we bump it to 2023, those discussions can happen then.

Gery Lemon46:52

And and this could perhaps be a line item within the climate action.

David Screech46:57

Yes, I suspect it would something would fall out.

John Rogers47:00

Yeah.

John Rogers47:00

And we have time to have a look at what Sands has done.

David Screech47:04

So we're um we're we're moving the N 074 then to 2023, just as a placeholder.

David Screech47:13

And then the Storm Arm Road traffic calming, I suppose, was in here be because we had suggested we wanted to look at it again this year.

John Rosenberg47:27

Your worship, I felt compelled because it was council initiative.

John Rosenberg47:30

You would notice in the uh project summary that it says specifically in there, I believe um staff would recommend no additional traffic calming measures be installed.

John Rosenberg47:40

So we could save 8,000 in casino funds by not installing that traffic circle or traffic humping.

John Rosenberg47:47

I think at the end of the day, my issue always is that the existing traffic hump is you know closer than 100 meters to the traffic light.

John Rosenberg47:58

So I I just don't know how fast you can get the you know, and I get that if you're standing there, they are going faster, so they're accelerating.

John Rosenberg48:06

But we we put up the the speed reader uh traffic counter and and it didn't show excessive speeds.

John Rosenberg48:14

And yeah, there was a handful of people that raced to the light to get through it before it turned red.

John Rosenberg48:19

But again, this this would be not supported by staff, but by all means, if council wanted it installed, we could install it.

David Screech48:27

Okay, thank you.

David Screech48:29

Since the interchange has opened, I don't think we've had at least I certainly haven't had any any complaints.

David Screech48:37

I mean, I think the interchange has to some degree helped with the issues.

Ron Mattson48:41

Well, COVID didn't hurt either.

David Screech48:43

Well COVID didn't hurt.

David Screech48:44

So so what is council's um choice here, Dave?

David Screech48:49

Do we want to go ahead and spend eight thousand dollars of casino revenue?

David Screech48:53

No.

David Screech48:54

Okay, so I've got one no, two no's.

David Screech48:56

The no from me.

Gery Lemon48:57

Yeah, yeah, I'm wishy washy because this was actually my my um my ask on behalf of the residents of Stormont, but I will talk to them.

Ron Mattson49:07

Okay, I I had a lot of complaints earlier, but I'm not sure.

John Rogers49:10

Yeah, it hasn't it hasn't been any recent stuff.

Damian Kowalewich49:12

Yeah, just there's a lot of mitigating factors that are happening lately that are uh making it, you know, clearly it's not an issue as as much as it was before.

Damian Kowalewich49:21

And I think we can articulate that once COVID, you know, settles down and if things start to ramp up again, we'll uh we'll consider it again.

Damian Kowalewich49:30

It's it's clearly being addressed by us as a council.

Damian Kowalewich49:32

We take it seriously, but we also have to remain fluid and say, okay, it's not a problem right now.

Damian Kowalewich49:37

And they haven't they haven't come back lately.

Damian Kowalewich49:39

So you know, we have responsibility to be basically responsible too.

Damian Kowalewich49:42

So um yeah, I I can't support it right now.

David Screech49:44

Thank you.

David Screech49:45

That's true.

David Screech49:46

Okay, so we're gonna remove that, John.

David Screech49:51

Thank you, your ship page.

David Screech49:54

Good luck.

David Screech50:06

So yeah, so N zero four zero is twenty twenty four, so we don't need to discuss that.

David Screech50:14

No.

David Screech50:14

N zero one six.

David Screech50:16

I'm I'm confused on this one because I thought we'd completed the funding for this.

Speaker_850:21

It w the funding had been split over two years, your worship.

Speaker_850:25

Hello, Lindsay Chase, Director of Development Services.

David Screech50:29

Okay.

David Screech50:29

Hello.

Speaker_850:32

So this part this project is very close to concluding, and council will uh we'll we'll see some results shortly.

David Screech50:41

So it's already it's done.

David Screech50:43

We did last year we agreed to fund this over the two years.

David Screech50:46

Okay.

John Rogers50:46

That is correct.

Gery Lemon50:48

Um so why is it in year four?

Ron Mattson50:51

So why is it in here?

Ron Mattson50:52

Is this 210?

David Screech50:53

Well, because we we already approved it last year to to spread it over two years.

David Screech50:58

It's the commercial precinct plans.

John Rogers51:00

So we have initiated it.

David Screech51:02

Yeah, yeah.

David Screech51:03

Yeah, no, as as Lindsay said, I think I think she actually has a a draft report.

David Screech51:08

Um, and and it's close to coming forward.

Ron Mattson51:11

Because then I'm confused.

Ron Mattson51:14

So we need the 55,000 for this year, but the report's already finished.

David Screech51:20

Yeah, well, we're already into this year.

David Screech51:22

I mean, I don't think the report is actually finished, but when we approved it, we approved 55,000 for last year and 55,000 for this year.

David Screech51:33

Correct.

David Screech51:34

Just read the funding over two years.

Ron Mattson51:37

So do we actually have a contract for 110,000?

Ron Mattson51:39

We've already signed it.

Ron Mattson51:40

Yeah.

Ron Mattson51:41

Yes.

Damian Kowalewich51:41

I think we can save the articles in.

David Screech51:43

No, it it's done.

David Screech51:44

Yeah.

John Rogers51:45

So yeah, if we got a contract, we got a contract.

David Screech51:48

Yeah.

David Screech51:49

Okay.

David Screech51:50

So we're seeing nodding of heads for N 016.

David Screech51:55

So N084 is the climate action plan.

David Screech52:03

Which is grant dependent, right?

David Screech52:07

That's the way we've got it at the moment.

John Rogers52:08

Yes, FCM.

David Screech52:10

Yeah.

John Rogers52:11

I guess the question will be hopefully FCM will fund it.

David Screech52:16

Gas tax grants reduced to us as well.

David Screech52:19

Right.

David Screech52:20

So will staff come back to us?

David Screech52:22

Wait, what is the consequence of leaving this in now as it is?

David Screech52:26

If we don't get the grant, staff would come back and ask if we wanted to fund it an alternative way.

John Rogers52:35

Yeah.

David Screech52:37

Anybody?

David Screech52:39

I think you muted, Lindsay.

Speaker_852:42

Oh, that's very strange.

Speaker_852:43

Um, this is one of your significant your significant strategic plan items, which is why it's in this year's budget.

Ron Mattson52:52

Okay, let's move it out.

David Screech52:56

So if we aren't successful in the grant, then it what do you are you proposing that it would just automatically then switch to gas tax funding?

Speaker_853:09

If council would like to um make the decision once we hear whether or not we are successful on the grant, I'm I can certainly bring this back to you at that time.

David Screech53:20

Okay, I think I think there's a level of of comfort with that.

John Rogers53:25

Yeah, so and and gas tax uh is a good approach.

David Screech53:28

Yeah.

David Screech53:29

Okay.

David Screech53:29

So we're gonna leave that in and and you can keep us posted.

David Screech53:36

So I'm sure Councillor Matson would like to bump the next one up probably to this year.

John Rogers53:46

Yeah I think so.

David Screech53:47

The community engagement strategy run.

John Rogers53:55

That was a yes.

Ron Mattson53:59

Look there's always plans.

Ron Mattson54:00

I mean, can any of these things be done in house?

Ron Mattson54:03

I mean, this is insane.

David Screech54:05

Well, I I don't disagree that at this point in time we don't need to worry about doing a community engagement strategy, but it's two years out.

John Rogers54:12

Yeah.

David Screech54:13

You can't engage now.

David Screech54:14

Corporate energy and emissions 2024.

David Screech54:15

So let's just leave it where it is.

John Rogers54:17

It's the next council.

David Screech54:21

So let's go to N012, which is the development of road ends design, which I think we had bumped from last year when we were trying to make some savings with COVID.

John Rogers54:34

And we've bumped it's now in next.

David Screech54:36

Oh, right.

David Screech54:36

Yeah, it's 2022.

David Screech54:39

Yeah.

David Screech54:39

So the X three are all tentatively in for 2022.

David Screech54:44

Yeah.

David Screech54:44

You were sure.

David Screech54:45

Correct.

David Screech54:46

Go ahead.

John Rogers54:47

Yeah.

John Rogers54:47

So um, you know, I understand um, you know, the total amount of of uh parts science wayfinding, but you know, I'm just looking for a quick hit.

John Rogers54:57

You know, we we still we had identified a um a pilot for for view all and portage, you know, pilot signage, which should only be five or ten thousand dollars.

John Rogers55:08

You know, and so let's get the pilot and find out what these the park signage would look like and and uh and test that out with the community.

David Screech55:18

I I thought we had approved that for last year, the the idea of a test sign.

David Screech55:23

A design.

David Screech55:24

Mm-hmm.

Gery Lemon55:25

We guessed that it go to design.

Ron Mattson55:27

That's something was already made up, wasn't it?

David Screech55:29

Kim?

Kim Anema55:30

Seems to me COVID changed a lot of things, and this is one of them.

David Screech55:33

Was that?

David Screech55:33

I believe yes.

David Screech55:37

Okay, so what what response do you have to to Councilor Rogers for allowing a small amount to design and implement one or two test signs?

David Screech55:46

Yeah.

Speaker_855:49

If if that is a council priority, we can certainly make that happen.

Ron Mattson55:54

Okay.

John Rogers55:54

Even if we allocate 5,000.

Damian Kowalewich55:57

I I would say considering the amount of people that are now, you know, unable to leave the country, there's more walking, there's more people engaged in their community.

Damian Kowalewich56:07

I think it's very appropriate.

David Screech56:16

Because they're so big they could wander for days and not find their way out.

David Screech56:22

So I mean, I have no idea of what's a reasonable amount to do a couple of test signs, but if we were to allocate ten thousand dollars, Lindsay, would would that be plenty?

Speaker_856:36

I think I I think that it really depends on what kinds of materials we end up using um for for the signs.

Speaker_856:44

So um if if you if you give us if you give us funding, we will make we will make it work.

David Screech56:51

Okay.

David Screech56:51

So why why don't we then uh do 10 for this year and 30 for next year?

David Screech56:56

Um and that gives you something to start with.

David Screech57:00

Councillor Lemmon?

Gery Lemon57:01

Um could that 10 include a a professional graphic designer?

David Screech57:08

I'm sure it would.

Gery Lemon57:09

I don't I don't know.

Gery Lemon57:10

That's good.

Gery Lemon57:11

That's good.

Gery Lemon57:11

I just don't want it to be something staff has to do off the side of the case.

David Screech57:14

Yeah, no, no, I no, I'm sure it would be.

Ron Mattson57:16

Why don't we ask Linda Carswell to her something?

David Screech57:19

Yeah, well anyhow, why don't we not design the sign right now but leave the money in the budget for the sign?

Ron Mattson57:24

I'm sure staff following me.

David Screech57:30

Okay.

David Screech57:31

So then we're going.

David Screech57:34

We don't need to deal with any of those because they're so far out.

David Screech57:38

Um so we have the OCP review, which is already in the budget.

David Screech57:42

E worship.

John Rogers57:42

Yeah.

John Rogers57:43

Sorry, uh, if I may, on the petition connectivity master plan.

John Rogers57:46

Yeah.

John Rogers57:47

And 15.

John Rogers57:47

You know, can we move that up to this budget year?

David Screech57:51

No.

David Screech57:52

I I would rather not.

David Screech57:53

I I I really don't, you know, I I'm not big on it's gas tax.

David Screech57:59

Yeah, I know, but gas tax is still funding that, you know, understanding.

David Screech57:59

John's under rule here.

John Rogers58:04

Well, yeah, because it, you know, it is something that uh as uh staff have pointed out.

John Rogers58:09

Uh we're just doing ad hoc uh planning for, and I'm uh not so much concerned about the trails, but certainly um you know the sidewalks having a five-year plan, sidewalk master plan, you know, I I think is is really important.

John Rogers58:23

So this is uh you know, good planning strategies that uh should be invested in.

John Rogers58:29

It doesn't seem your worship.

David Screech58:30

Well, sidewalks.

David Screech58:31

It does.

David Screech58:32

Oh, it does up at the top there, yeah.

David Screech58:34

John Rosenberg, would you like to speak to that?

John Rogers58:37

Lindsay.

John Rosenberg58:37

Yeah, both Lindsay and I have been working on this, uh, your worship, and um what we've come up with was we are going to work on this project, but we're gonna do it if you're ready for this, in-house with our GIS technician.

John Rosenberg58:51

Um, we're gonna use our staff and the advisory committees to uh determine all all the linkages that they think are missing or all the linkages that they would like to see improved, put them all together, put them on a map, and we'll use that as a basis for an RFP that will actually go out that uh help us to determine a matrix that we'll use a professional for and also create a design uh in the following year uh based on that information that we collect this year.

John Rosenberg59:16

We'll probably put something on the website as well with regards to the ability for people to uh uh have any uh comments they want as well and submit them by a certain date and then put all that information together, run that uh through a GIS map and then uh send that plan out and uh get a matrix together to try to determine and hopefully by then we can do public engagement as well.

David Screech59:37

So you're saying that it's already in your work plan to start that this year but you don't need funding until next year.

David Screech59:44

That's correct because we're doing it in-house with uh existing staff so the work is starting okay okay thank you that's great thank you John okay so OCP review obviously is is uh that's in the budget.

Ron Mattson59:59

Well, I have a question on that one though.

Ron Mattson1:00:01

Okay.

Ron Mattson1:00:02

So in the survey they've asked council to fill out one of the questions was do we want a full-blown review or or or tweaks to the existing plan.

Ron Mattson1:00:13

So depending on what we select, I'm assuming the cost will vary.

Ron Mattson1:00:14

That is correct, yes.

Ron Mattson1:00:20

And so I guess that's I'm wondering that is 120 reasonable if we decide that we don't have a bad plan and we only need tweaks.

David Screech1:00:30

Well, I mean, then we'll we won't spend it all.

David Screech1:00:33

So that'll be a good thing.

John Rogers1:00:34

We won't have to spend anything.

Ron Mattson1:00:38

So where's the 120 coming from?

Ron Mattson1:00:41

Casino revenue again.

Ron Mattson1:00:43

Yeah.

David Screech1:00:46

Councilor Rogers.

David Screech1:00:48

Yeah.

John Rogers1:00:48

Thanks.

John Rogers1:00:49

Steph question.

John Rogers1:00:50

Um, you know, we're still gonna have a hangover on the uh the COVID um restrictions of gatherings and so forth, I'm sure.

John Rogers1:00:58

Um do you see uh that being an adverse impact and a difficulty in getting the public consultation that we were so successful with uh in 2011?

Speaker_81:01:08

Thank you, Councillor Rogers.

Speaker_81:01:10

That's actually a question that I've been asking my colleagues in other municipalities.

Speaker_81:01:15

Um and there are um at least two other municipalities, three actually municipalities that are undertaking OCP reviews right now, and all of them have indicated that online engagement has actually resulted in broader public participation in their OCP reviews than they've previously had um because it allows people to participate um at a time and location that's convenient for them.

David Screech1:01:42

Um and I think that that's that's one of the the democratizing aspects of of um shifting to to more virtual engagement good thank you i didn't realize that okay good news so we're gonna leave that placemaker in there for now and then yeah okay thank you thank you so the the next one n080 that was my thing and and i agree with staff that we should um put it a year so we can just take that out so we're gonna i sorry you've suggested that we just scratch 10 from it?

David Screech1:02:19

Yeah, scratch 2021 and we'll see what's happening.

John Rogers1:02:22

Do you want to make 2022 20,000?

Ron Mattson1:02:25

No.

David Screech1:02:26

No, no.

Damon Christenson1:02:28

Your your worship, if if i may interrupt, it's Don Christianson here.

Damon Christenson1:02:31

Uh for the for the first time um uh uh we have a project that is proposed to be funded from the money that is given cash in lieu of, and John can describe this uh you know how how we get how we earn this money, but we actually have a reserve that we have been contributing when people pay for cash in lieu of of planting a tree if they can't plant a tree uh for a tree permit.

Damon Christenson1:02:55

So the the the idea that we had was that this program would be funded from that reserve.

David Screech1:03:00

This is N80 that you're saying?

David Screech1:03:03

Correct.

David Screech1:03:04

But I thought staff were also suggesting that it um staff are recommending delaying the program until 2022 when COVID 19 is being addressed.

David Screech1:03:14

So that's what I was picking up on and just taking it out for 2021.

Damon Christenson1:03:21

Certainly, I just wanted you to be aware that this is a draw from the from a new source of funding that we have not used before.

David Screech1:03:29

Tree replacement reserve account.

David Screech1:03:31

So that's when when people can't plant replacement trees on their property?

Damon Christenson1:03:35

I believe so.

John Rosenberg1:03:37

That's correct.

David Screech1:03:38

No, well that's good to know.

David Screech1:03:40

Well, hopefully during this year, then maybe we can we can build up that fund.

John Rosenberg1:03:45

Yeah, and the other thing we can do, your worship, uh, is look at uh putting together the policy and program this year, and again, then we can do that in-house.

David Screech1:03:53

Right.

David Screech1:03:53

Okay.

Gery Lemon1:03:56

Um to staff, how how much do um what what is the fee for um non-planting a tree?

John Rosenberg1:04:06

Uh the bylaw states that it's at the director's discretion between 100 and 150, and I've never picked a hundred.

John Rosenberg1:04:13

Okay, good.

John Rosenberg1:04:14

Thanks, and um when we come back, and and we are planning to come back with a uh uh amendment to the tree protection bylaw, that number will be significantly higher on a suggestion to staff to council because at 150 it's very difficult to plant a tree, water it, and maintain it for several years so it gets going.

John Rosenberg1:04:33

So it's likely to be in the five to seven hundred dollar range.

John Rosenberg1:04:36

Uh if council agrees with that amendment uh moving forward.

John Rosenberg1:04:40

So that'll really entice people to plant them on their property where they take care of them as opposed to just giving us the 150.

John Rosenberg1:04:47

We're certainly have too many instances where they they realize that by the time they buy the tree, put all the effort into planting it and then maintaining it for three years, they'd rather just give us the money.

Gery Lemon1:04:57

How are those trees doing that border of View Royal Park?

John Rosenberg1:05:02

That border view royal park on the McClennan Trail?

Gery Lemon1:05:05

No, no, the uh there were some to protect a resident from the case.

David Screech1:05:10

Oh, they're all dead because of the residents.

John Rosenberg1:05:12

Oh, they did not do well.

John Rosenberg1:05:14

Um, and we're not sure if it's because of the soil condition, which was our original concern about planting them on our property, or whether she just did not take care of them herself.

John Rosenberg1:05:23

We're we're not sure about uh she has not been um forthright with regards to communication, she was very disappointed in the outcome and reluctantly uh chose to plant them on her property.

John Rosenberg1:05:34

But I'm not sure certain why they did not uh do well there.

John Rosenberg1:05:38

Okay, thank you.

David Screech1:05:40

Counselor Rogers.

John Rogers1:05:41

So uh how many trees does uh 10,000 buy plant?

John Rosenberg1:05:46

Well, it certainly depends on the size of the tree and the location of the tree and the type of the tree.

John Rosenberg1:05:50

So that that's hard to say.

John Rosenberg1:05:52

The the trees that we we were planting in V Row Park were costing us uh around a thousand dollars, and then we had to plant them.

John Rosenberg1:05:58

So they were about twenty five hundred, and then maintenance on top of that would probably put them in around thirty five hundred dollars a piece.

John Rosenberg1:06:05

Uh the typical tree that somebody would plant uh in their yard, which would be a 50 mil caliber, 35 mil caliper, about five or six feet tall.

John Rosenberg1:06:13

Um, by the time you do all of that work, you're probably in the three to four, maybe five hundred dollar range.

John Rosenberg1:06:14

Okay, thank you.

Ron Mattson1:06:20

Yeah.

David Screech1:06:21

Okay, so we're gonna leave that again.

David Screech1:06:23

I want to say how great it is to see the the number of spots around the town that staff have been finding on public property to put trees.

David Screech1:06:34

Um, and and that is great to see.

David Screech1:06:38

So we're bumping that then to 2022.

David Screech1:06:42

Um so next we have M064, which is the Helmican Centennial Park Master Plan.

David Screech1:06:52

So is there questions on that?

John Rogers1:06:54

I wonder if we could uh move that to next year.

Damian Kowalewich1:06:57

Yeah, that's important moving it to next year as well.

David Screech1:06:59

No.

David Screech1:07:01

Okay, if not further.

David Screech1:07:02

You're not gonna argue strenuously about that one.

David Screech1:07:06

So we're suggesting that the Halmakan Centennial plan be moved to next year, which will disappoint some pickleball enthusiasts.

David Screech1:07:20

But I tend to agree it makes sense.

John Rogers1:07:22

They got West Shore.

Ron Mattson1:07:23

It'd be easier just to build the pickle bar than do the study.

David Screech1:07:26

Yeah, they'd probably pay for the pickleball course.

Ron Mattson1:07:30

Some of these studies sorry, but how can we pause that little park?

Ron Mattson1:07:34

How can you spend 50 grand on a study?

Ron Mattson1:07:36

Like, where do these numbers come up with?

Ron Mattson1:07:37

We hired some consultant at an outrageous amount to talk to the community.

Ron Mattson1:07:41

I mean, 50 grand for it for that's outrageous.

Ron Mattson1:07:44

You could probably build half a dozen pickleball courts.

Damian Kowalewich1:07:48

No, probably not.

David Screech1:07:49

But anyhow, we'll have that discussion next year.

David Screech1:07:54

So then if we're bumping that one, we should probably be bumping the little road one to 2023, right?

David Screech1:08:01

Yeah.

David Screech1:08:02

Okay.

David Screech1:08:03

So staff, do you catch that that we'll bump the the little road to 2023?

Damon Christenson1:08:10

Yes, your worship.

Damon Christenson1:08:11

Thank you.

Ron Mattson1:08:12

Okay.

David Screech1:08:13

Um so the West Shore Escape, that's N079, that's pretty straightforward and it's contingent on all the other funding being in place, which doesn't look too likely.

John Rogers1:08:23

We've already approved that, didn't we?

John Rogers1:08:25

Yeah.

David Screech1:08:25

Yeah.

David Screech1:08:25

Yeah.

David Screech1:08:26

Yeah.

David Screech1:08:28

So then okay, so that's non-core 2.1.

David Screech1:08:38

So we're just gonna carry on into 2.2, Don?

Damon Christenson1:08:41

Well, 2.2 is the mate to 2.1 that just describes the funding.

Damon Christenson1:08:46

So that would conclude our non-core discussion, and we could carry on with capital if you wish.

Ron Mattson1:08:51

Oh, I didn't plan for capital.

Ron Mattson1:08:52

Time to go.

Gery Lemon1:08:55

What did we do with West Shore Parks?

Damian Kowalewich1:08:57

That's all contingent on them giving other funding.

Damian Kowalewich1:09:00

So we don't actually have to pay for it till the other funding.

Damian Kowalewich1:09:04

So then they're ways off right now.

David Screech1:09:08

So what time do we want to go to tonight?

David Screech1:09:11

Do people feel not?

David Screech1:09:13

Yeah, I'm not asking you like for for you to say 7 15 counselor matts nine again 8 30 yeah so shall we shoot for sort of between 8 30 and 9 depending on where we're at okay so which which tab do you want us to go to Doug?

Damon Christenson1:09:30

We would go to tab three.

David Screech1:09:33

So I do feel like we I mean obviously there's still a lot of discussions and questions around the tax increase and what we're gonna do and how we're gonna deal with it.

David Screech1:09:43

Um we haven't dropped a nickel no but we'll wait to get the answers to your questions or to my questions, I guess and and the fire service services revenue, and then obviously we're gonna have to have a a hard conversation about that.

David Screech1:09:58

Tomorrow.

David Screech1:09:59

Yeah, I suppose.

David Screech1:10:01

But we'll we'll start on capital.

Damon Christenson1:10:06

Yes, that's great.

Damon Christenson1:10:07

Thank you.

John Rogers1:10:08

Is Paul still around for the protective services?

David Screech1:10:11

That portion?

David Screech1:10:15

So so sorry, we were doing tab three.

David Screech1:10:18

Yes.

David Screech1:10:19

Okay.

David Screech1:10:21

Okay.

David Screech1:10:25

You'll show up and just well, we can always skip Paul's, I suppose, right?

David Screech1:10:28

For tonight.

David Screech1:10:29

Call them back.

David Screech1:10:31

Yeah, okay, so we'll just start right at the top again at C 101.

David Screech1:10:39

Not that that's happening until 2023.

David Screech1:10:46

Okay, so then C038.

David Screech1:10:54

Does anyone have any questions, comments on that?

John Rogers1:11:00

So you worship, I wonder when we are scheduled to get new iPads ourselves.

Damon Christenson1:11:17

If if I may.

David Screech1:11:19

Yeah, go ahead.

Damon Christenson1:11:21

So uh the replacement of council's iPads would be in uh C40, the uh IT workstation evergreening.

Damon Christenson1:11:29

That project perhaps is a little bit um misnamed.

Damon Christenson1:11:33

I've just inherited the name that was like that when I got here, I guess I could say.

Damon Christenson1:11:37

Um but yes, every year we um we very carefully monitor all of our uh not only workstations but all of our peripherals and and council iPads would be uh some of the devices that we would schedule for replacement in due time.

Damon Christenson1:11:53

Um it occurs to me that likely a an opportune time to replace council's iPads would be very shortly after, or is uh just uh in coordination with uh an election.

John Rogers1:12:10

Can I take mine home?

Damon Christenson1:12:12

I think we have a policy uh uh about that.

Damon Christenson1:12:15

I I I'd have to refresh myself on the details, but certainly the disposal of used devices for something like that, I think is something that we should consider.

David Screech1:12:24

The CRD, they we all we get one at the beginning of our term and it's expected to last the four years.

David Screech1:12:31

And at the end of the four years, we have the option of turning it in or giving them $20 for it.

John Rosenberg1:12:38

Right.

David Screech1:12:39

For what that's worth.

David Screech1:12:40

$20.

David Screech1:12:41

Yeah, I'm one that's a four-year-old iPad, right?

David Screech1:12:44

It's worth nothing.

John Rogers1:12:45

Are you able to be are you guys able to do anything like print off of these?

David Screech1:12:48

No.

David Screech1:12:49

No.

David Screech1:12:49

No, no.

John Rogers1:12:50

See, you know, so I always have to go to my other email when I'm really in or my other and you can't email it.

David Screech1:12:56

Well, you can get a Bluetooth printer, but I think somehow we're getting a little bit off topic.

John Rogers1:12:59

But it's not a good one.

John Rogers1:12:59

Okay, well.

John Rogers1:13:01

At least I know when.

Damian Kowalewich1:13:04

I'm only going to talk about options during C40 when it comes up.

David Screech1:13:08

Okay.

David Screech1:13:10

So C038.

David Screech1:13:14

Um does anyone have any questions on that?

David Screech1:13:18

I do.

David Screech1:13:18

Funding from casino revenue.

Ron Mattson1:13:20

So my my question is what have we done in subsequent years or previous years?

Damon Christenson1:13:25

Uh I can answer that, your worship, if if I know it looks like um you know it's just uh a random amount that's put in every year, but it but in reality, we look at the uh life expectancy, not the life expectancy, the warranty expiry of our servers.

Damon Christenson1:13:48

And we um have a contract with a managed service provider for uh IT hardware that says they will not support especially servers, but also workstations that are beyond a warranty period, and that's that's for good reason.

Damon Christenson1:14:04

Um you know, so we cannot have servers going down and and for us to be without without service on our on our computer network.

Damon Christenson1:14:12

So this is a planned uh scheduled replacement of uh servers as they their warranty expires.

Damon Christenson1:14:20

And and there isn't any in 2025 because there isn't a a server that is coming up for for a replacement in 2025.

Damon Christenson1:14:29

We uh you know the IT strategic plan will always look at what we can do to uh reduce our network infrastructure such that perhaps at some point in time we have fewer servers.

Damon Christenson1:14:42

That's always been a goal of the last strategic plan, um having you know, kind of freeing us a little bit from this constant um you know replacement of hardware.

Damon Christenson1:14:53

But we're we're just not quite there yet.

David Screech1:14:57

Okay, thank you.

David Screech1:15:00

Council Allen.

Gery Lemon1:15:01

So Don, would you actually say it's critical and not be more than strategic?

Damon Christenson1:15:15

Perhaps uh should have put it in the at least required category, in that um if we don't do this, uh we uh definitely would be accepting a higher level of risk.

David Screech1:15:27

Thank you.

David Screech1:15:28

Okay, so I'm seeing general noddings on on that.

David Screech1:15:33

So moving on to C040.

Damian Kowalewich1:15:47

This is our this includes council upgrades for iPads and I guess yeah, it's general workstations and but for 2022, I guess is what Don was saying, right?

Damon Christenson1:16:02

That would be correct, yes.

Damian Kowalewich1:16:03

Okay.

Damian Kowalewich1:16:04

So if that if that's the case, I'm I'm not I don't need to spend any time on it.

Damian Kowalewich1:16:08

The only thing I was gonna say was uh I would I would ask staff and council to consider you know being allotted a certain amount of money for their desired electronic device as opposed to just be given an iPad.

Damian Kowalewich1:16:22

I mean there's a lot of us who I think you know I agree with council, I prefer a laptop.

Damian Kowalewich1:16:27

Um I really would.

Damian Kowalewich1:16:28

And certainly I can look at the agenda while I'm here on an iP on a laptop as opposed to an iPad.

Damian Kowalewich1:16:35

Um, if that's something that IT can set up or it can be downloaded.

Damian Kowalewich1:16:39

Uh I know it can be looked at on the internet, so certainly it can be looked at on a laptop.

Damian Kowalewich1:16:43

I don't know how the in-camera stuff would work for sharing that data, but I'm sure it could be done.

Damian Kowalewich1:16:47

Uh, considering the cost of a new iPad, which I know how expensive they are, uh, certainly a laptop wouldn't be another question for comparable pricing.

Damian Kowalewich1:16:57

Just a just a thought for going forward.

Damian Kowalewich1:16:58

I mean, it's all about you know making making people as comfortable as they can in the workplace, whether it be for staff or for council, right?

Gery Lemon1:17:07

I'm looking forward to my $20 iPad.

David Screech1:17:09

Well, yeah, I mean, I suspect that I mean the the app and how staff loads agendas in and all those things to the app would be important.

David Screech1:17:19

But at any rate, I mean that can be discussed.

David Screech1:17:21

Don, on that 40,000, given that we're we're trying to be careful with casino revenue, what would be the implications if we said for this year that we're just going to put 20,000 in as opposed to 40?

Damon Christenson1:17:36

Your worship, I would suggest that if you uh had a year that you were going to do that in this year would not be it.

Damon Christenson1:17:47

We did defer some replacements last year because we had um mostly from a work point of view we had the uh you know council webcasting project to be working on we worked on that um as as well.

Damon Christenson1:18:02

We had a transition with our managed service provider.

Damon Christenson1:18:05

So, you know, the thing is about uh funding something from casino revenue, if we don't spend it, we don't draw it from the re from the reserve so so there is that.

Damon Christenson1:18:15

I realize it's not money that could be allocated in the same year in the budget.

Damon Christenson1:18:19

Um so so I would suggest that given enough advance um notice we could plan to try to reduce that.

Damon Christenson1:18:30

But I do know I've already been in discussions with our managed service provider and and with our IT coordinator, and we kind of have plans for the full 40,000 this year, to my to my best best of my knowledge.

John Rogers1:18:42

It's already spent.

Damon Christenson1:18:44

It's not spent, but we have plans.

David Screech1:18:48

But but you think that possibly we didn't spend the full 40,000 last year.

Damon Christenson1:18:54

Oh, I don't have that number off the top of my head, but um I I I believe we did not, and certainly of course that but money would not I can actually look it up here.

Damon Christenson1:19:05

Um indeed we spent 39,975.

John Rogers1:19:14

And that's on your MasterCard, eh?

David Screech1:19:17

Well, you can't get much closer than that.

David Screech1:19:20

So we do try.

David Screech1:19:22

So where everyone's good with leaving that there?

John Rogers1:19:26

Okay.

David Screech1:19:30

So the next one is 2023.

David Screech1:19:32

Yeah.

David Screech1:19:33

And then the next one is the town hall lunchroom renovation, which was deferred from last year.

David Screech1:19:41

Question.

David Screech1:19:42

John.

John Rogers1:19:43

You know, if we've got COVID, how in the world are you going to put 20 in a in the uh a lunchroom when uh Dr.

John Rogers1:19:49

Henry would have an a uh a conniption.

David Screech1:19:53

Well, I mean at the moment that a lot of staff are using the committee room for their lunch because there's just not enough room.

John Rogers1:20:00

Well I know, but it's it it is a uh a a COVID issue where I would certainly hope that 20 people or even 10 people aren't.

David Screech1:20:08

Yeah, no, I don't think they're suggesting that 20 people are gonna converge and eat at the same time.

David Screech1:20:13

They're just making the the observation that it it is a lunchroom for 20 employees.

David Screech1:20:20

Uh-huh.

David Screech1:20:21

Um and so there are times when there's part, it's also kind of a go-through, right?

David Screech1:20:25

As well as being a lunchroom, everybody walks through there.

David Screech1:20:28

So there's there's times when there's a lot of people.

David Screech1:20:29

Thank you, or show.

David Screech1:20:31

Staff, did you want to talk to this again?

David Screech1:20:33

April.

John Rosenberg1:20:34

Uh yeah, uh the plan would be actually for six people to eat lunch in there.

John Rosenberg1:20:38

But you're right, even during the uh COVID, it's not gonna happen.

John Rosenberg1:20:41

But one of the the if you want to play a little Pollyanna here, one of the nice things is because people aren't eating lunch in there right now, it's gonna be a lot less disruptive to do it now.

John Rosenberg1:20:52

The plan would be to start it later in the year and have it finished, and then hopefully by 2022, when it's actually done and completed, staff will be allowed to use it again as a lunchroom, and it won't be as disruptive as it would be if staff were trying to use it as an active lunchroom now.

John Rosenberg1:21:06

And um it does prevent people like right now, they are using the meeting room beside your uh your office.

John Rosenberg1:21:11

So it does make sense to do it this year if we can.

John Rosenberg1:21:14

Counselor Manson.

John Rosenberg1:21:15

Um, and it was deferred from last year.

Ron Mattson1:21:20

You know, what seems to make more sense to me is we uh adjust those meeting rooms so that they could be individual lunchrooms because that you can get more people in there.

Ron Mattson1:21:31

I mean, use the existing room just to to make your lunch, pull your stuff out of the fridge, and because you're we're not going to get a whole lot by doing that, by spending 50,000 on that room.

Ron Mattson1:21:42

Whereas doing something to accommodate in the two meeting rooms seems to make a lot more sense to me.

John Rosenberg1:21:48

Your worship, I can speak to that.

John Rosenberg1:21:50

The the issue with that was we we did actually look at converting one of the meeting rooms to a uh a lunchroom, um, but it just doesn't work with regards to electrical servicing, plumbing, um, and various other issues because um, you know, I I don't think it makes it a lunchroom if you put a desk in there and say eat here.

John Rosenberg1:22:09

Um you still need a microwave, you need, you know, a place to wash your dishes and all of those things.

John Rosenberg1:22:15

And um if it's set up as a lunchroom, then it can't be used as a meeting room.

John Rosenberg1:22:19

So we already are challenged when we're doing day-to-day business with the meeting rooms that we do have.

John Rosenberg1:22:24

So I wouldn't want to um create a a lunch area where somebody could eat and take away a meeting room.

John Rosenberg1:22:32

Um I don't see how that and we'd spend a lot more than a fifty thousand if we tried to convert one of the meeting rooms to an actual lunchroom.

John Rosenberg1:22:39

Because we did look at that because of that pass-through thing, making that a meeting room and making the uh other meeting room a lunch room because it was bigger.

Ron Mattson1:22:47

But just I wasn't suggesting that we turn the meeting rooms into lunch rooms.

Ron Mattson1:22:53

Just use the meeting rooms.

Ron Mattson1:22:55

You know, 'cause you have a big table, people could sit around the table and have lunch the same way we we do and just keep the lunch room for preparing the food that's going to be taken into the meeting room.

John Rosenberg1:23:09

That could work if you want the part of the issue part of the issue would be that um our lunches are staggered, and I believe we start from 11 30 and go to 2 30.

John Rosenberg1:23:19

So again, that would mean that you you wouldn't be able to have meetings in there 'cause you'd be worried about somebody coming in and wanting to have their lunch, or people would plan to have their lunch and then the meeting room would be occupied.

John Rosenberg1:23:29

So we we don't send everybody home at noon and come back at one.

John Rosenberg1:23:33

We do stagger our lunches throughout the day.

John Rosenberg1:23:35

So it would make trying to book a meeting room or hoping to have lunch in a meeting room and then find out, oh, I can't.

John Rosenberg1:23:41

And at some point you'd just be frustrated and go back to what you were doing, which was eating at your desk.

David Screech1:23:46

Counselor Kwalwich.

Damian Kowalewich1:23:48

Thanks.

Damian Kowalewich1:23:49

I do uh actually I do support this uh proposal.

Damian Kowalewich1:23:54

I think that if we create a space where employees um would like to stay here and have their lunch, um, they'll be more prone to uh not leaving the building to go get food.

Damian Kowalewich1:24:09

Um they'll uh be more refreshed.

Damian Kowalewich1:24:12

Hopefully, they'll uh continue to work as diligently as they always do.

Damian Kowalewich1:24:17

Um they'll feel more comfortable in the building, uh potentially we'll create more uh teamwork scenarios as COVID numbers decrease.

Damian Kowalewich1:24:26

Um so I do support it.

Damian Kowalewich1:24:27

My one ask would be: I would assume that this project would not be completed by the end of 2021.

Damian Kowalewich1:24:34

Would there be any way to split this 25-25 for 2021 and 2022, Director Christensen?

Damian Kowalewich1:24:42

Or Rosenberg, I guess, for this one, but with some input from everybody.

John Rosenberg1:24:47

Yeah, I I I think that is possible.

John Rosenberg1:24:51

I mean, I I think Director Christensen's talked about the fact that the casino fund just has funds in it, and when we use them, it comes out.

John Rosenberg1:24:58

When we don't use them, it stays in.

John Rosenberg1:24:59

So if I was to start building it in November and finish building it in February, it'd just be a matter of two months when the 50,000 would come out or stay in.

John Rosenberg1:25:10

So you're not actually seeing any real savings or any kind of and and I don't believe the current plan has a casino funds going to zero.

John Rosenberg1:25:19

So although that does make sense when you shift for an entire year because your priorities might change, um trying to straddle a year with a project because we couldn't do part and then let it sit and then do the other part.

John Rosenberg1:25:32

So I I don't i it could be done, but I just don't see an advantage to doing it that way.

Damian Kowalewich1:25:38

Okay.

Damian Kowalewich1:25:38

I'm definitely, I mean, I'm very mindful of every dollar this year, as is everybody, and I'm just looking for any way to potentially, you know, mitigate anything to do with this budget.

Damian Kowalewich1:25:50

But um that's all I've got on that.

Damian Kowalewich1:25:53

Okay, thank you.

David Screech1:25:54

Do you have anything on it?

Gery Lemon1:25:55

Yeah.

Gery Lemon1:25:56

Um I I struggled with it last year and I'm struggling with it this year.

Gery Lemon1:26:01

I don't I don't think this is the year to do this.

Gery Lemon1:26:04

And um like my colleague down the way, if I you know, if people are eating in boardrooms now, committee rooms.

Gery Lemon1:26:13

Um I I I don't know.

Gery Lemon1:26:16

I I don't know I don't really see the hardship in that.

Gery Lemon1:26:20

Um so no, I I'm I'm for this year I can't support it.

David Screech1:26:27

Counselor Rogers.

John Rogers1:26:29

Yeah, the question is um uh the existing first aid room would be relocated in the basement in the archives area.

John Rogers1:26:37

So you know my recollection the archives area is pretty darn small and and uh uh already quite cramped with with desks and stuff.

John Rogers1:26:47

How do you how do you envision that would happen?

David Screech1:26:49

I'm pretty sure we went through this last year when we originally approved this project, but um Director Rosenberg?

John Rosenberg1:26:57

I can be succinct, there's a bathroom down there that not too many people use, and we have plenty of bathrooms in the engineering department, so we're gonna convert that bathroom to the first aid station.

John Rosenberg1:27:05

It has water already, so it works well for first aid station.

David Screech1:27:10

I'm just gonna add my two cents worth.

David Screech1:27:12

I mean, when you look at that lunchroom for the number of staff in this place, it's pathetic.

David Screech1:27:14

I mean, it really is.

David Screech1:27:19

I mean, it how this building ever got built with that tiny a kitchen is absolutely amazing.

David Screech1:27:27

I mean, old Frank probably should be seriously questioned about why, you know, it just makes no sense given the amount of staff to me.

David Screech1:27:36

So I I have no problem with supporting it.

David Screech1:27:39

And if you know, the there's just not enough room in there.

David Screech1:27:43

I mean, with COVID right now, if one staff member is trying to heat something up in the microwave and another one's trying to get something out of the fridge, they they can't get they can't do it.

David Screech1:27:54

I mean, and and we're and keep the social distancing rules.

David Screech1:27:57

I mean it's it's just a tiny cramped space so I I have no problem with supporting it at all so we have do have some dissension on this so councillor Kualowicz and I are supportive counselor lemon is not on my right not this year okay so you do have three that are okay with it so we're gonna leave it in the budget for this year thank you so moving on we're skipping projective services yeah shall we shall we skip without Paul here, Sarah or Kim.

Kim Anema1:28:34

Yes, I advised Paul that we would try to start with all the others and then start with his tomorrow.

Ron Mattson1:28:39

Yeah, just push it all back a year.

David Screech1:28:42

Or should we just tell him it was too bad he wasn't here?

David Screech1:28:46

We said no to all of them.

Kim Anema1:28:49

I'm sure you appreciate that.

David Screech1:28:52

Okay, so we're gonna skip right down then to C066.

David Screech1:28:58

But that's not until 2023.

David Screech1:29:00

Your worship?

Damian Kowalewich1:29:02

Go ahead.

Damian Kowalewich1:29:02

Could we not address some of the RCMP stuff about that?

Damian Kowalewich1:29:06

Is that or is it here?

David Screech1:29:09

Oh I see yeah yeah yeah yeah not really but it might be easier just to do that whole section as as as a section.

Damian Kowalewich1:29:16

Yeah.

Ron Mattson1:29:16

Let's call in the inspector first.

David Screech1:29:20

So C012 is not until 2022.

David Screech1:29:26

So the first one we have is C108, which is the lighting improvements.

David Screech1:29:31

John.

John Rosenberg1:29:34

Thank you, Worship.

John Rosenberg1:29:36

108.

John Rosenberg1:29:37

I have to look because I was expecting Paul to be long winded.

John Rosenberg1:29:43

But he's not here.

John Rosenberg1:29:45

So 108 is actually, we had talked last year about uh the Helmkin corridor and deficient lighting there, and we did have that assessed.

John Rosenberg1:29:55

Um so we are gonna add a couple lights at the um Pheasant Lane and the Vickery roundabouts.

John Rosenberg1:30:02

Uh the POS form that was included in the book shows that we're gonna add two lights at Vickery and three lights at Helm at uh Pheasant Lane, and then as well, we're gonna add an additional light um at Chilco Road and Lund Road.

John Rosenberg1:30:16

Um, so this is all done with gas tax, um, and it's um just what's that six lights to improve uh pedestrian lighting uh mostly in the Helmkin Corridor there, and then obviously at Chilco and Lund uh in the Tevisphale uh area.

John Rogers1:30:33

I'm okay with this.

David Screech1:30:35

Okay, everybody's good.

David Screech1:30:37

This is gas tax funding and residents requests for lights.

David Screech1:30:42

Yeah.

David Screech1:30:43

Okay, so I'm seeing all nodding on that.

David Screech1:30:49

108.

John Rosenberg1:30:50

107, your worship is uh the uh Atkins Road Sidewalk project that we've submitted for uh grant funding.

John Rosenberg1:30:57

It currently is in for consideration.

John Rosenberg1:30:59

Um this would only go forward uh if we were to uh receive the grant.

John Rosenberg1:31:04

And the 30,000 is just if we were to go over budget on the um eighteen eight thirteen amount, and we currently have uh contingency funding um of two hundred and eighty thousand or something like that.

John Rosenberg1:31:20

So I'd be shocked if we used any of the thirty, but um we are required to prove that uh we have additional funding sources uh should we get started and have to stop and only do the design.

John Rosenberg1:31:31

So the um thirty thousand, if we didn't get the funding, would be paid to use for the design that we've currently done, and then it would just set.

John Rosenberg1:31:39

We can't use gas tax for uh design projects.

John Rogers1:31:43

Yeah, so I so I understand um you know if we're lucky with the the grant, you know, everything's paid.

John Rosenberg1:31:43

So that's why we chose a casino reserve.

David Screech1:31:47

Okay, Councilor Rogers.

John Rogers1:31:54

If we're not, then we'll do the design through uh casino.

John Rosenberg1:31:58

Correct.

John Rosenberg1:31:59

Thank you.

John Rosenberg1:32:00

And that design is already partially done.

John Rogers1:32:02

Yeah, thanks.

David Screech1:32:05

Okay, so everyone's good with that.

David Screech1:32:07

Yes.

David Screech1:32:08

So next is C 065, which is the LED lighting upgrade.

Gery Lemon1:32:17

Taxation.

John Rosenberg1:32:20

This your worship is uh gas tax funding.

John Rosenberg1:32:24

Okay.

John Rosenberg1:32:24

Um and this is just council had asked for a program to convert um sorry, I'm just finding the sheets here, convert the uh existing lights to LEDs.

John Rosenberg1:32:42

So this is just a long-term plan at 30 to 000 on an annual basis to uh do the upgrade.

John Rosenberg1:32:49

So if council was worried about their gas tax reserves, um we could just uh delay these.

John Rosenberg1:32:54

These are about upgrading the existing lights that are uh used and viable.

John Rosenberg1:33:00

So it's not um pretty sure I didn't say it was critical.

John Rosenberg1:33:04

I didn't, I said it was strategic.

John Rosenberg1:33:06

Um so by all means, if council felt that they wanted to uh delay using gas tax uh funds at this time, they could, and we could decide to start this project anytime moving forward.

John Rosenberg1:33:16

You can see in the POS uh form uh where those areas are and what what those lights entail.

John Rosenberg1:33:23

So it it just delays the the you know when the project would be concluded at this time.

David Screech1:33:28

So, John, you you say in there that we we've done all the town owned Cobra lights, and this would do the start to do the decorative ones.

David Screech1:33:37

But for the people who are unfortunate enough to live on roads that have non town owned Cobra lights, um how do those at some point get replaced or upgraded to LED lighting?

John Rosenberg1:33:51

BC Hydro does have a program um, and we have talked to them about putting us on the list to to um get us there sooner.

John Rosenberg1:33:59

I'm not sure if other municipalities are actively uh asking Hydro to upgrade their facilities first.

John Rosenberg1:34:07

So I couldn't put a number on it, but I do know that uh BC Hydro has a program to do the same thing on their uh posts that they own.

John Rosenberg1:34:14

All those Cobra lights are owned and operated by BC Hydro and we just pay for the power.

David Screech1:34:20

So that's the I mean the vast majority of the smaller streets in our town, right?

David Screech1:34:26

Like the all the whatever lights we have in the Harbor Precinct and um and it's Park Crest, um, Kate Hunt Place, all those sort of roads.

David Screech1:34:36

Those correct, yes.

David Screech1:34:38

Yeah.

John Rosenberg1:34:38

Yeah, yeah.

John Rosenberg1:34:39

I mean, by no means has this come close to doing the entire town.

John Rosenberg1:34:43

I mean, it certainly leaves uh significant gaps.

John Rosenberg1:34:44

Yes, thank you.

David Screech1:34:48

Councillor Matson.

Ron Mattson1:34:50

Um, so I think I've got this right.

Ron Mattson1:34:54

It says that uh this over there's an annual electricity savings of fifty dollars per light, and so I'm just wondering how many lights get changed for $30,000 and how long it's gonna take us to actually recoup the cost and savings.

John Rosenberg1:35:10

Well, that actually changes depending on which um light situation we're doing.

John Rosenberg1:35:15

We have the post top lights, we have the ornamental post top lights, and we've got the ornamental gooseneck lights.

John Rosenberg1:35:20

Those lights um definitely uh cost different.

John Rosenberg1:35:25

Um, they're $1,900, uh $3150.

John Rosenberg1:35:29

And I can't find the other one, so it's not cheap.

John Rosenberg1:35:37

You're not changing these LED lights out because you're um you know saving massive amounts of dollars.

John Rosenberg1:35:42

You've at the end of the day, your life cycle cost, you know, recovery is is going to be somewhere in the you know 20 years, plus or minus.

John Rosenberg1:35:52

But what you are getting is you're lowering greenhouse gases, you're getting a better form of light, um, you're getting some other advantages, so it isn't just about dollars.

John Rosenberg1:36:01

Um, if you're looking at it from a hey, are we gonna save some money?

John Rosenberg1:36:04

I I would say that wouldn't be the way you'd look at this.

Ron Mattson1:36:08

Just on the basis of that, I'm for moving it back here.

Damian Kowalewich1:36:13

Council Rogers?

John Rogers1:36:16

Yeah, um, and I'm wondering with um the plan that you've got, uh, where does is um Helmicken and Island Highway?

John Rogers1:36:24

Is that first on the list uh in terms of the fiscal year plan?

John Rosenberg1:36:29

We don't have a plan, but we'd certainly be seeking council's direction.

John Rosenberg1:36:32

If this were to pass, then um we'd we'd certainly, you know, my suggestion would be that certainly though those main thoroughfares would be a great place to start.

John Rosenberg1:36:42

But um, you know, if council had other ideas and wanted to try to clean up uh an area of town perhaps over a couple of years instead.

John Rosenberg1:36:50

Uh the you know, the program, if we started on Island Highway and um Helmkin, you know, we'd be several years on those two roads before we get into any kind of subdivisions.

John Rogers1:37:06

The problem is that well, how have we done we've done the rest of the island highway, right?

John Rogers1:37:12

So the island highway from Stormont um to Calwood, we've already done all those lights.

David Screech1:37:19

We've done the six mile strip.

John Rogers1:37:21

Yeah.

John Rosenberg1:37:22

Significant amount of them.

John Rosenberg1:37:23

I don't think every single one's done, but for the most part, yes.

John Rogers1:37:27

Yeah, we said we've done all the rest of the island highway.

John Rogers1:37:31

Um oh from coal to co so um I guess my question is the island highway from Athetus Interchange to Stormont.

John Rogers1:37:41

Have those lights been changed?

John Rogers1:37:43

Yes.

John Rosenberg1:37:44

So we've on the POS form page 106.

John Rogers1:37:44

Okay.

John Rosenberg1:37:49

You can see the proposed uh lights that would be installed in the island highway in Helmkin.

John Rosenberg1:37:54

It basically goes from Vickery down to Helmkin and then from Helmkin to no, I can't tell, but it looks like four-mile trestle.

John Rogers1:38:08

106.

John Rogers1:38:09

Oh.

John Rogers1:38:13

Okay, I guess I guess your worship, I'm just trying to figure out if we uh if we've already done much of Island Highway, then this the island highway would be a specific focus that we could uh you know turn our attention to this this portion right here, and finish that since if that's already done right and that's yeah I guess the the question is whether or not we include it for this year or whether we just as in the interest of being frugal we just cut it for this year.

Gery Lemon1:38:42

Councillor Lemmon um John I I've got a little stuck here on we're not talking just upgrading changing out the the lights are we in um on the top of page 105 it begin replacing the ornamental post top fixtures and ornamental goostic fixtures.

Gery Lemon1:39:03

So are we going to be replacing some of the post top lights um with ornamental fixtures?

John Rosenberg1:39:12

Yeah, the the LED light itself does not retrofit into our current infrastructure.

John Rosenberg1:39:18

So we have to change out the top heads of those infrastructures.

John Rosenberg1:39:22

And that's why, you know, for instance, the island highway changes, it's 3150 per light because you have to change out some of the decorative elements of the head as well so that the light can fit in there.

John Rosenberg1:39:34

It's not an easy process, and there's 64 of them.

John Rosenberg1:39:37

So at 3150, you're doing nine a year.

John Rosenberg1:39:41

So it's basically a seven year program to do the island highway portion.

John Rosenberg1:39:45

This this works out to like over a million dollars.

David Screech1:39:49

Yeah.

John Rosenberg1:39:50

This is this is just a long term year after year after year, we start changing them out.

John Rosenberg1:39:57

Um we didn't think there was an appetite to come to council and say it's a four year program for a quarter of a million dollars a year.

John Rosenberg1:39:59

Um that would be your other way to attack this.

Gery Lemon1:40:07

You know I I I think it's real you know it's it's more than admirable.

Gery Lemon1:40:11

I'm it's you know it's probably the right thing to do, but I'm I'm thinking of people who you know theoretically get a a tax increase of seven point three percent theoretical anybody's listening.

Gery Lemon1:40:23

Um and then they see us putting in pretty light standards and I I I would struggle with that.

Gery Lemon1:40:33

I do struggle with that.

Gery Lemon1:40:35

So, you know, the the the optics of that, you know, from the point of view of somebody who's just received their tax notice.

Gery Lemon1:40:43

Um it's a struggle.

David Screech1:40:46

So I think when we first talked about doing this, I mean I think we were more interested in replacing the old Cobra bad lighting, you know, than the newer decorative lighting.

David Screech1:40:59

And I I tend to agree that I mean I don't see it as as an urgent need at all to start replacing the decorative lighting, but I'd really like to find out how we can encourage BC Hydro to look at at replacing some of the old Cobra bulbs.

Ron Mattson1:41:16

And they're not gas and coal powered, so I mean we're not killing the environment by leaving them like they are.

David Screech1:41:23

We'd have to talk to Gene Devonshire.

David Screech1:41:23

I don't know.

David Screech1:41:28

Um so I think in general there's not a whole lot of interest, John, in pursuing this at the moment.

David Screech1:41:33

So I think you could probably cut it out for 2021 and 2022 and and let a new council decide in 2023 if they want to um investigate it.

Ron Mattson1:41:47

Yeah.

John Rosenberg1:41:47

Sounds good, your worship.

David Screech1:41:48

Thank you.

David Screech1:41:49

Okay, thank you.

David Screech1:41:51

But let's see if we can get hydro to um start a plan with us of doing the other ones.

John Rosenberg1:41:57

We will continue to pursue that uh opportunity.

David Screech1:42:01

Particularly up in North View Royal.

John Rosenberg1:42:04

So I got a rough idea where I think you uh uh have a priority.

David Screech1:42:10

So high street 2023 54 C054, Curb and Sidewalk, Eagle Creek Village to help come so that's 2023, right?

David Screech1:42:24

C54, and then C76 is 2023.

David Screech1:42:28

Yeah.

David Screech1:42:29

And then the next one's 2024.

David Screech1:42:31

So the next one really with the bearing for this year is C018.

David Screech1:42:37

So John, some of this work should be happening, should it not?

David Screech1:42:40

Because it was in last year's approved budget.

John Rosenberg1:42:43

That's correct.

John Rosenberg1:42:44

Um we just finally received um authorization about three weeks ago from the ministry to put the four-way stop in.

John Rosenberg1:42:52

So the four-way stop is going in, and then we're just uh proceeding with uh other elements of the program.

David Screech1:42:58

So the money you have in here essentially then is what we approved last year.

John Rosenberg1:43:03

Uh you approved last some of it is from uh carry forward for last year, and then the rest is for uh the next phase of the works.

John Rosenberg1:43:13

Um this funding is uh broken down.

John Rosenberg1:43:17

Oh, yeah, Don's got it there.

John Rosenberg1:43:18

So you're you're you're looking at 74 for casino, 29 for DCCs and 185 for gas tax.

John Rosenberg1:43:25

Um, I'm just trying to find the exact program that we're doing.

John Rosenberg1:43:29

We're doing a light study for 40,000.

John Rosenberg1:43:31

We're doing a crosswalk uh um at uh Damon Drive, and that's gonna be a special crosswalk because it's got horizontal issues, it's got vertical issues.

John Rosenberg1:43:42

Um, so we're gonna have to do a lot of um it's gonna have to it's obviously gonna have to have lights, but it's also gonna have to advance warning lights.

John Rosenberg1:43:50

So that's at for 75,000, and then we're suggesting that we design the roundabout at Atkins Road for a hundred thousand.

John Rosenberg1:43:58

So any of those projects or all of those projects could just be removed, and then the remaining money would be for the carry forward for the uh funds to complete last year's work.

David Screech1:44:11

Okay, thank you.

David Screech1:44:14

Questions so where's the nine hundred thousand coming in?

David Screech1:44:20

Well, that would be when we actually build the roundabout.

David Screech1:44:23

So I mean that that's scheduled for next year, but staff wouldn't come back, obviously.

Ron Mattson1:44:28

And were we getting money from somebody to do that?

John Rosenberg1:44:33

We we uh if you if you consider developers somebody, yes.

John Rosenberg1:44:38

We are getting some uh DCC funding.

John Rosenberg1:44:41

Yeah.

John Rosenberg1:44:42

Um uh but it's not a lot, it's only 29,000 at this point, but that would be you know racially split uh at 926, you you would have a a ratio of DCC funding for that, I would imagine.

John Rosenberg1:44:53

Director Christensen could confirm that, but I would imagine that that nine twenty-six would hold some kind of percentage component for DCCs there as well.

Ron Mattson1:45:02

So so just for clarification, so what's gonna happen next year is we determine whether or not we want to do the roundabout and can afford to do it.

Ron Mattson1:45:10

Yeah.

Ron Mattson1:45:11

Yeah.

John Rosenberg1:45:12

You'll spend $100,000 to see what it looks like, and then you decide if you want to spend the plus or minus million dollars to build it.

John Rosenberg1:45:14

Yeah.

Ron Mattson1:45:19

So the 100K is is for this year to do the planning for the roundabout.

David Screech1:45:24

Yeah, to do the detailed design.

David Screech1:45:26

Correct.

John Rosenberg1:45:27

And that's one of three other projects or two, that's one of three projects suggested for this year based on uh the corridor study that was completed uh two years ago.

David Screech1:45:38

Yeah, I'm I'm good with it.

David Screech1:45:40

And I think it's um yeah.

David Screech1:45:43

So I'm seeing general noddings of heads, so we'll we'll leave that in.

David Screech1:45:50

So we were all at that's drainage.

David Screech1:45:54

That's in 2024.

David Screech1:45:56

Um so next we have to walkers way sidewalk.

David Screech1:45:59

I I'm completely okay with taking that 25,000 and bumping it until next year, and we can discuss it then.

David Screech1:46:07

I think we do need to discuss it at some point, but San well, just with Saanich's letter, it just the whole thing is annoying.

David Screech1:46:17

But the we're gonna get the sidewalk on the the Erskine Lane frontage, right?

David Screech1:46:23

With this new development, so then we're gonna have a sidewalk fragment there.

John Rogers1:46:27

Would that sorry?

John Rogers1:46:29

Doesn't that wouldn't that Erskine Lane take it to hospital way?

David Screech1:46:34

I don't think it'll go that way.

John Rosenberg1:46:36

It would not, uh Your Worship.

John Rosenberg1:46:38

Uh it only takes it to its property line, it'll take it to the core edge of Mr.

David Screech1:46:42

Vander Kirkhoff's property, which is in Santa.

John Rogers1:46:44

It isn't it should do the entire strip to hospital away.

David Screech1:46:45

That's insane.

David Screech1:46:50

But we're gonna have to talk about whether we want to add that in at some point into the budget.

John Rogers1:46:55

Can can um could we just you know, if Risk and Lane were to go ahead and we're doing that, can we do something in conjunction with them?

John Rogers1:47:02

Because the all the equipment, the leveling, whatever the work is, will be ongoing with the developer to do their portion.

John Rosenberg1:47:09

Your worship, if I could interject.

David Screech1:47:11

Yeah, go ahead, John.

John Rosenberg1:47:12

Um the the the current plan, and we don't have this design, but we're pretty certain of this, would have that sidewalk be in the north side, and it would tie into the sidewalk that's at the bus stop on the Stone Ridge side of Watkiss Way.

John Rosenberg1:47:27

It would not be on the hospital side of Watkins Way.

John Rosenberg1:47:30

So the work that's being done for the Erskine sidewalk is really just to get uh a sidewalk to the bus stop that's on the Erskine side for traveling east on uh Watkins Way.

John Rosenberg1:47:42

The sidewalk would tie in on the other side, which is uh um on the north side of Watkins.

David Screech1:47:48

Wouldn't they be required to do the frontage on Watkiss, John?

John Rosenberg1:47:52

They would be, but uh I I hear you're talking about tying it into the hospital and hospital way and all of that.

John Rosenberg1:47:59

The the project that we're considering tonight would have the sidewalk built on the north side.

John Rosenberg1:48:05

So it wouldn't tie into that Erskine development sidewalk that they're building.

David Screech1:48:10

No, I think Councillor Rogers was just making the observation that on the on the south side, that if if the if the urban whatever their names are, urban the developer is going to put the sidewalk on the walk as frontage, would it be worthwhile considering, you know, potentially the town even paying them to finish that, seeing as they're going to have all the equipment on site, et cetera, et cetera, and bring it at least all the the way to the corner of hospital way.

John Rosenberg1:48:42

Yeah, now you're okay.

John Rosenberg1:48:43

Now you're back to that um issue about uh sanachin.

John Rosenberg1:48:48

And I mean, I I would assume they'd be okay with us putting an additional sidewalk on that side as well.

David Screech1:48:53

Yeah.

John Rosenberg1:48:53

But really would be at our cost for sure.

David Screech1:48:56

Realistically, the developer's not going to put that sidewalk in this year, anyways.

David Screech1:49:00

But it's it's certainly something that's worth considering when they do is whether or not we would be, you know, even if we possibly use some of our community amenity funds or something to bring that sidewalk up to hospital way at least.

John Rosenberg1:49:14

Yeah, and and uh um you know, I I I don't know if you'd see a lot of savings there.

John Rosenberg1:49:19

What you would see is uh continuity uh in that the construction's happening, carrying it a little further.

John Rosenberg1:49:27

Sure.

John Rosenberg1:49:27

Um, you know, sidewalk is is pretty well the same cost, you know, it's a hundred and hundred and twenty-five depending on the area per square meter.

John Rosenberg1:49:34

It doesn't really change.

John Rosenberg1:49:35

I mean, obviously it changes uh somewhat, but not that much.

John Rosenberg1:49:39

So you wouldn't see a lot of savings, but you would get some continuity of construction by doing it at the same time.

David Screech1:49:44

Yeah.

David Screech1:49:45

Counselor Rogers.

John Rogers1:49:46

Um it's it's the same approach that uh you know, John, you're taking with a Helmican and Eagle's Nest and number 15 Helmican.

John Rogers1:49:54

Uh Eagle's Nest is going we're hopefully we're not going to do number 15 until Eagle's Nest comes in.

John Rogers1:50:01

Um, but you're right, it it's not only continuity, it's safety, it's um, you know, everything.

John Rogers1:50:06

The only complication is it's insanity.

John Rogers1:50:09

So I would really hope that we would be able to go from Erskine to hospital way um that whole stretch, because maybe they don't want to walk on the north side of it, at least they'll be able to get to the hospital if they didn't want to do the hospital trail, which we haven't worked out yet.

John Rogers1:50:23

So I really hope that we could, you know, when that time comes and number nine goes ahead, that we really do uh work with them closely on that.

John Rogers1:50:29

Yeah, well, I think we flagged it for staff.

David Screech1:50:34

Yeah, but it but in terms of the budget, we're we're just push this.

David Screech1:50:38

Let's just push it.

David Screech1:50:39

Yeah.

David Screech1:50:40

Just one year, your worship.

John Rosenberg1:50:42

Sorry?

David Screech1:50:43

Just one year?

David Screech1:50:44

Yeah.

David Screech1:50:45

And then we can have the discussion again.

David Screech1:50:47

And and by then we'll know more about what's happening with that development.

David Screech1:50:52

And and whether Sanich is perhaps willing to be reasonable and talk to us about a boundary change.

John Rosenberg1:50:58

There is an election coming up, your worship.

David Screech1:51:01

Right, yeah.

David Screech1:51:03

We should talk to Mr.

David Screech1:51:04

Vander Kirkhoff because I have a feeling he would like to see his property in View Royal.

David Screech1:51:09

But anyhow, that's a different topic.

David Screech1:51:13

So, okay, so that is it for transportation services.

David Screech1:51:20

So we're across the page to environmental services, schedule 3.1.

David Screech1:51:27

We'll just continue on with that.

David Screech1:51:29

Yeah.

David Screech1:51:29

Okay.

David Screech1:51:32

So C030 and 087 are both 2022.

David Screech1:51:38

Um C088 is 2021.

David Screech1:51:42

Are there any questions on that?

David Screech1:51:46

2021 and 2022.

David Screech1:51:47

That's the Helmican Bay pump station upgrade.

Ron Mattson1:51:51

Just a general question.

David Screech1:51:52

John, go ahead, Ron.

Ron Mattson1:51:54

I mean, so so the question for most of these I have are is it possible to uh push these back here, John?

Ron Mattson1:52:02

I mean, I I know you have a schedule, et cetera, but I don't know how how bad a shape they're in now and uh what are the risks if we do move them back back here.

John Rosenberg1:52:12

Certainly we can do all this is funded from uh our sewer reserves that we're putting money into on an annual basis.

John Rosenberg1:52:18

Um so you you're not gonna see any savings anywhere.

John Rosenberg1:52:22

Um what you are going to introduce is risk.

John Rosenberg1:52:24

And by all means, it is a a a scheduled plan.

John Rosenberg1:52:28

Um we do look at the age of the pumps and if one pump is causing us more issues, or if we're finding that a pump is failing more often, or we're getting uh different pumping uh volumes out of pumps, and we see that that one's uh you know, even though it's newer, then we'll change what we're doing.

John Rosenberg1:52:45

But this is basically just to try to prevent uh issues as opposed to react to issues.

John Rosenberg1:52:52

So that's what we're doing with these pump station upgrades.

John Rosenberg1:52:55

Um, so with regards to the the pump station, um we're really just trying to, in some cases, it might be that our pipe our electrical work is starting to corrode.

John Rosenberg1:53:06

So we're you know, if if something was to fail there, then we're gonna be pumping with pumper trucks, and you know, a pumper truck's gonna cost you seven thousand dollars a day, and sometimes it you know you could be weeks pumping, so it that doesn't happen too often, but that's the kind of risk that you're you're taking.

John Rosenberg1:53:22

That if if something were to fail that uh um we can't see, but we know is coming, because we do have our electrical work uh inspected on an annual basis.

John Rosenberg1:53:30

And I don't know what they do, but they put some kind of meter on it and then they show that the conductivity is uh weakening in it so that you know it the potential is coming and there's there's different things that we do to let us know that these stations are uh coming towards the end of their life.

John Rosenberg1:53:45

So that's how we we put together the plan and and work from there.

David Screech1:53:49

The other go ahead question.

Ron Mattson1:53:52

Just and and the other one I just need maybe uh I I thought we'd replaced a lot of our sewer mains and etc.

Ron Mattson1:53:59

And so you've got from basically $2 million dollars for uh sewer gravity mains for Fort Victoria.

David Screech1:54:05

Well, well, let's get to that one, right?

David Screech1:54:07

So that let's finish off with the Helming Bay pump station.

Ron Mattson1:54:11

Oh, okay.

Ron Mattson1:54:11

I mean, I was fine with it.

David Screech1:54:13

So yeah, okay.

David Screech1:54:14

Okay.

David Screech1:54:14

Okay.

David Screech1:54:16

You're on the Helmican Bay one?

John Rogers1:54:18

Uh John, I I uh you make a very strong uh valid case uh for this.

John Rogers1:54:23

Um this is the oldest one.

John Rogers1:54:24

It's uh in a critical stage and it has uh huge environmental consequences if it does fail.

John Rogers1:54:30

And it's remarkable the number of times that I've driven by there that there seems to be somebody down there.

John Rogers1:54:36

It's it's a it's a frequent stop for maintenance.

David Screech1:54:40

You're not gonna ruin that nice little beach access though, right?

John Rosenberg1:54:44

I wouldn't dream of it, you worship.

John Rogers1:54:46

Are you throwing in beach oxis as a as a part of the cost?

John Rosenberg1:54:53

We will try to stay as far away from the beach as we can for several reasons.

David Screech1:54:57

Yeah.

David Screech1:54:58

Yeah.

David Screech1:54:58

Okay, so everyone's good with that.

David Screech1:54:59

So and then the next two are far out.

David Screech1:55:06

So then the next one is the Fort Victoria sewer gravity main upgrade.

David Screech1:55:12

I guess I mean one question I have on that is is Fort Victoria itself responsible for um the dire need to replace this.

John Rosenberg1:55:22

Exactly.

John Rosenberg1:55:23

Um would you like me to say yes?

John Rogers1:55:26

Yes.

John Rosenberg1:55:27

Well no, I'm I'm I'm truly interested in the there's certainly a participant in the fact that uh it's uh under uh under capacity.

John Rosenberg1:55:38

I I would suggest that um you know the the pipe itself has probably got settlement in it, which is causing us flow issues.

John Rosenberg1:55:45

So a pipe when it's running on grade um has a certain velocity and a certain capacity uh volume that it can run.

John Rosenberg1:55:52

And once it starts getting sags in it, that hydraulic nature of that pipe is totally thrown out.

John Rosenberg1:55:58

So I I would likely think that what we've got in there is a few sags um as well.

John Rosenberg1:56:03

And then I think just with the ongoing development upstream of Fort Victoria, um the pipes just undersized and needs to be replaced.

John Rosenberg1:56:12

So these uh initial costs are for the uh design of the projects, and then you can see that the projects themselves um are are further out.

John Rosenberg1:56:22

And part of that design process is that we will determine um the design of the project but also the capacity of the pipes and you know maybe we'll be surprised and find out that theoretically it's it's not flowing that well um but in actuality because we're now getting some surcharging and some head pressure that it's functioning fine and we may be able to delay these projects for several more years but we won't know that until we actually get somebody out there and put uh a thorough investigation into it.

John Rosenberg1:56:50

So if council was concerned about the big dollars in later years we might be able to make those flexible based on the information that we get this year in doing our investigation as part of the design process.

John Rogers1:57:00

The other question, John, I think is um you were saying that this um uh upgrade of the main uh the sewer line um is also uh anticipating um future development in V well like if um Lewis properties were to be developed um you know to the maximum density or whatever um uh you know all the that whole area then this pipe would be able to accommodate that increase in in uh demand.

John Rosenberg1:57:28

That's correct.

John Rosenberg1:57:29

I mean the first initial the the when we did the study they didn't actually go out and determine the actual capacity of each pipe.

John Rosenberg1:57:37

It was theoretical capacity that they used uh based on um again theoretical numbers of what each household provides from a a sewer uh volume each day daily day.

John Rosenberg1:57:51

So what we'll do when we do this start this design process is they'll actually figure out the sewer catchment, they'll figure out the flows within it.

John Rosenberg1:57:58

And what we might find out is in actuality we've got another 20 years of capacity left, but we won't know that until we get out there and spend that initial 32,000 in designing it and investigating the area to see where we're at.

John Rosenberg1:58:11

And if that were to occur, then we just put the design in the shelf and wait.

John Rosenberg1:58:15

Um but the if the project was to go forward, it would look at the zoning map and the OCP and go, okay, what's likely to go there?

John Rosenberg1:58:24

What are the numbers that uh potentially would be there density-wise, you know, 50 years from now, 100 years from now?

John Rosenberg1:58:31

Because I mean, these pipes that go in do have a life cycle of 100 years.

John Rosenberg1:58:35

So today, you know, we might have a 200 mil pipe in there and a 250 mil pipe will last us 20 years.

John Rosenberg1:58:41

But if we go to 450 mils, the cost difference is you know marginal, basically the cost of the pipe.

John Rosenberg1:58:44

Um, and then we're set for 100 years with regards to capacity.

John Rogers1:58:51

And as we're developing uh from the beginning of that, you know, let's say Prince Robert Drive, and you know, it's going to go all the way down through um uh Pheasant Lane, and all that new pipe and for that new demands and new housing and so forth is going to c I think have a greater demand and a and a renewal of that pump station on Pheasant Lane.

John Rosenberg1:59:20

Quite potentially, and and that that would be calculated into the uh upgrade of that station at that time, you know, how however many years from now.

David Screech1:59:29

Okay, thank you.

David Screech1:59:29

So for for right now, for C 109 and C 110, because they're both really the same discussion.

David Screech1:59:36

Yeah, um, we're approving the 32,000 for each for for this year.

David Screech1:59:42

Yeah.

David Screech1:59:42

Okay.

Gery Lemon1:59:43

That's the study.

David Screech1:59:44

Yeah.

David Screech1:59:45

Yeah.

John Rosenberg1:59:46

It's not a study, your worship.

John Rosenberg1:59:47

That would be for the design and uh look at the capacity to determine uh and then we'd be able to get a better handle on one, the costs, the 865 and 975 are just estimates, and it would also give us a time frame.

David Screech2:00:01

So Theatusco pump station upgrade, that's already underway.

John Rosenberg2:00:05

That's correct, your worship.

John Rosenberg2:00:06

This is just uh complete the project this spring.

Ron Mattson2:00:09

It's been going on forever.

David Screech2:00:10

So it's it's just a significant.

David Screech2:00:13

So this is a um 190 is is a carry or carry forward you know we've allocated uh 500 000 so is it carry forward of the portion of the 500 correct okay okay okay so that is environmental services so what are we we're 10 after eight so we could probably do call it a day we'd have to go until 10 tomorrow i think we can probably get through parks relatively easily and then call it a day.

David Screech2:00:46

Then does that sound fair?

David Screech2:00:49

Okay.

David Screech2:00:50

Okay.

David Screech2:00:52

So the the first one, the centennial park diamond number four fencing improvements.

David Screech2:00:58

Seeing as we've deferred the plan for Centennial Park, would it make sense to defer that one year out to 2023?

John Rosenberg2:01:06

Yeah, that makes perfect sense.

John Rosenberg2:01:07

Your worship that really is just people are complaining about balls going into the uh playground that we built on the backside.

John Rosenberg2:01:13

Um, but I would agree because the the master plan might suggest that we do no longer need that diamond.

John Rosenberg2:01:17

I'd hate to put that money up for the fencing for two years and then take it down.

David Screech2:01:21

Yeah, okay.

John Rogers2:01:23

Even though it is listed as critical.

John Rogers2:01:25

Yeah.

David Screech2:01:26

And can I yeah, go ahead.

Gery Lemon2:01:28

I'm I'm wondering about our liability if we don't do this.

David Screech2:01:33

I mean, we I think we did discuss this last year.

David Screech2:01:36

Um yeah, and Councillor Lemmon's asking about liability for kids playing in a playground that's right adjacent to a baseball park.

John Rosenberg2:01:47

Yeah, I I I'm pretty certain that happens in in you know several municipalities, not only all over the province, but all over the country, all over the world.

John Rosenberg2:01:55

I mean, you know, parks have playgrounds in them because you know, when the big brother goes and plays baseball, little brother goes and plays in the slide and the swings.

John Rosenberg2:02:03

So um they're always around, and you know, one of the inherent risks when you go to a baseball diamond is if you're not paying attention, you very well could get a a baseball uh flying your way.

John Rosenberg2:02:13

So I I would agree that it that uh it's a concern, but it I I think it's a a risk that uh is part and parcel to the business that we do.

David Screech2:02:24

Okay, so we'll we'll put push that to 2023.

David Screech2:02:29

The next one is a vehicle replacement for 2022.

David Screech2:02:34

So parks so C031.

John Rosenberg2:02:40

That's that's a Kubota tractor, your worship, and I'm really having a struggle with that.

John Rosenberg2:02:46

Um I was really hoping to buy a used tractor, um, and we just can't find a used one, and we've we've actually tried to find one across Canada.

John Rosenberg2:02:55

I was willing to pay for shipping.

John Rosenberg2:02:57

Um so I uh 816 isn't gonna cut it, I don't think, but we've delayed that purchase.

John Rosenberg2:03:04

It was supposed to be purchased last year.

John Rosenberg2:03:06

Um because I just couldn't pull the trigger on a brand new Kubota, because it it it's something that we need, but it's not something that we use a lot.

John Rosenberg2:03:14

Um, you know, if we're putting a thousand hours into it like a lot of our other vehicles in a year, then uh I wouldn't have an issue with it.

John Rosenberg2:03:20

But this particular uh piece of equipment um is really only used two or three hundred hours a year and sometimes it's very difficult to get a contractor to come in and you know do two hours here, an hour there, three hours there.

John Rosenberg2:03:33

Um so it is a piece of equipment that we need, but um I I'm not ready to spend that kind of money at this time.

John Rosenberg2:03:40

So uh we're still looking at options to see what we can do.

John Rosenberg2:03:45

So do you want us to leave it in or that would be great, your worship, if you could just leave the eighty one six and and let us come up with some kind of plan.

John Rosenberg2:03:54

I mean, my other plan is to take a uh 25-five year old uh vehicle and put fifteen or twenty thousand into replacing all the the piping and and all the hoses and all the hydraulics and all of that and and you know have it you know hopefully work another five to ten years.

John Rosenberg2:04:11

So that's another option that we're exploring at this time.

David Screech2:04:14

Well that's all funded from reserve anyways.

John Rosenberg2:04:16

So it's all part of the fleet reserve.

John Rosenberg2:04:18

That previous one where you see the 70, 70, 50, 500, that annual funding is what funds the uh fleet reserve to allow us to purchase the vehicles.

John Rosenberg2:04:28

And that's the next two, the tractors coming up, the six, the 06 and 07 John Deere's.

John Rosenberg2:04:33

They're both our uh big tractors that we cut View Royal and centennial park with and portage and a couple other areas.

John Rosenberg2:04:39

So they're just slated to be replaced under the program.

David Screech2:04:44

Okay.

David Screech2:04:44

Yep.

David Screech2:04:45

So is everyone good then with those three items under C031?

David Screech2:04:51

We would be funded from reserve.

David Screech2:04:53

Yeah.

John Rogers2:04:53

We we'd postponed 20 from 2020 to this year.

David Screech2:04:57

So okay, so those are good.

David Screech2:05:00

C034 will presumably probably get bumped out depending on the plan again.

John Rosenberg2:05:09

Yeah, I don't see how you can build it in the same year you're doing a plan, your worship.

John Rosenberg2:05:13

So you can push that a year for sure.

David Screech2:05:15

Yeah.

David Screech2:05:15

So maybe we should just move that to 2023.

David Screech2:05:19

Yeah.

David Screech2:05:20

Okay.

David Screech2:05:21

And so then the road ends, we've got the 20,000 back in.

John Rosenberg2:05:27

Thank you, worship.

John Rosenberg2:05:28

That's actually to actually develop a road end, uh, if council wanted to uh take that challenge on.

John Rosenberg2:05:35

That's for crane place.

David Screech2:05:38

In the last full year before an election.

John Rogers2:05:41

Which one would that be?

John Rosenberg2:05:43

That's crane place.

David Screech2:05:44

Crane place, yeah.

John Rosenberg2:05:46

So we don't actually have our design guidelines.

John Rosenberg2:05:48

The previous one that you looked at and considered was to actually try to put together some um design guidelines that we'd use, you know, the widths of trails, whether it would be, you know, the types of benches, types of picnic tables, um, those types of things.

John Rosenberg2:06:03

Um Crane Place uh we started on a couple years ago.

John Rosenberg2:06:07

We stopped last year because of COVID.

John Rosenberg2:06:10

Um we do have an idea of what we do there.

John Rosenberg2:06:12

It'd basically be a very small path uh meandering through uh uh a wooded area and then we'd put a bench and a picnic or a bench in the garbage can uh at the end of it so that we could do this year if we wanted to yeah I mean I I would like to see us do this.

David Screech2:06:29

We've been talking about doing it for years.

David Screech2:06:32

Um you know like going back two terms.

David Screech2:06:36

So I mean I'm I'm not I don't feel hugely strongly about it but it's a relatively small investment.

David Screech2:06:42

It would be a nice community amenity down there and for people out walking as well.

John Rogers2:06:48

Councillor Rogers so um yeah I'm uh I guess it it it would be have we had any kind of sense of where the people are are at this point?

John Rogers2:07:00

Yeah, for you know, in other words, the rest of the community, do they uh do they want this uh uh amenity, this access?

David Screech2:07:07

Well, it was in the in our new master parks master plan, right?

David Screech2:07:12

And there was quite a bit on them on there.

David Screech2:07:14

We know that the two residents on either side of this one probably aren't as keen as the rest of the neighborhood to see it.

John Rosenberg2:07:21

I would go as far as say they're reluctant, your worship.

David Screech2:07:24

Yeah, I think that's probably a good word.

John Rogers2:07:26

That's what I was looking for.

John Rogers2:07:28

So what I don't understand then if you know that's the 20,000, but in the the next fiscal year, it's a it's a 60,000.

John Rogers2:07:35

There's a 20,000 design.

David Screech2:07:38

I think there's a mistake there.

David Screech2:07:39

I mean, it's suggesting there's a 20,000 operational hip.

David Screech2:07:44

Um that that must be a type of is unless we have to hire a security guard or something.

John Rosenberg2:07:52

Your worship, I'm pretty sure uh Ms.

John Rosenberg2:07:56

Chase can speak to this if I get it wrong.

John Rosenberg2:07:59

But the component there is um some of it is to actually come up with those design guidelines, figuring out the types of trails, the types of benches, the types of plantings we want to do.

John Rosenberg2:08:09

We're gonna uh in some areas we'll want to remove some invasives and then plant some native vegetation in there so we get a horticulturist involved to figure out what to do with some of these areas.

John Rosenberg2:08:19

And then after that, it's maintaining those areas.

John Rosenberg2:08:22

So the 20,000 becomes operationally maintenance as we develop more of these road ends.

John Rosenberg2:08:27

Uh we now have to take care of them.

John Rosenberg2:08:29

So we have to empty the garbage where we put the the bench in the garbage can.

John Rosenberg2:08:29

We have to, you know, cut back the branches on the trails that are going into each road end.

John Rosenberg2:08:34

We have to, you know, clean the bench once in a while.

John Rosenberg2:08:41

So one component would be to set up some of the design guidelines and and philosophies behind what these developments would look like.

John Rosenberg2:08:49

The other would be to build it, and then the last component would be to maintain it.

David Screech2:08:53

Yeah, I think the ongoing effect on taxation, the operational is is the 3,003,500 a year.

David Screech2:09:00

Correct.

David Screech2:09:01

For yeah.

David Screech2:09:03

Counselor Rogers.

David Screech2:09:04

Yeah.

John Rogers2:09:04

So you know, the work that we did on the Beaumont um road end, um, you know, I guess isn't that uh you've already done the design, and that's that would be the template that I can't see how much you know because you know the design work that you we've done on Stuart and all the other road ends.

John Rogers2:09:27

You know, it it really I'm not sure if we do need to spend twenty thousand dollars on on a design aspect of of these road ends.

Speaker_82:09:35

Um your worship.

David Screech2:09:37

Go ahead.

Speaker_82:09:38

Thank you.

Speaker_82:09:39

Um the the the road ends on um the ocean front have a very different profile than the road ends that are on the gorge.

Speaker_82:09:50

Um and uh as a as a result, um the road ends and in particular the shoreline interface areas um in the gorge area do require special attention in terms of understanding what to plant and also how do we ensure that people andor dogs actually stay back from the bank so that they they don't end up in the mud flat and that it is species, et cetera, that are appropriate for that particular environment.

David Screech2:10:21

But have we have we not already for Crane Place done a basic plan?

David Screech2:10:26

I mean it's it's not a big complicated.

David Screech2:10:29

I thought we had done sort of a small plan with a little bench at the end and be done with it.

David Screech2:10:34

Um and and so, I mean, we have in year one 20,000 capital.

David Screech2:10:42

And then in year two, we have the 40,000 and the 20,000.

David Screech2:10:46

So if if we were to say today that we're okay with the 20,000, does that get us some work done on Crane Place?

John Rosenberg2:10:54

I'm hoping it would, your worship.

John Rosenberg2:10:56

Um, I think Director Chase points out the fact that once we show up, I believe things like us harming the environment will become an issue.

John Rosenberg2:11:06

And when I show up with a contractor and start uh removing uh woody debris to um create the path, there there may be some pushback with regards to you know, what about the nesting birds and what about so on?

John Rosenberg2:11:21

So we definitely will involve uh an RP bio for that first project um and make sure that we're doing it at the appropriate time and in the appropriate manner.

John Rosenberg2:11:30

But uh I I do believe that you know the fact that we're going to be doing almost 10 of these, um, it might make sense to set up some kind of protocols.

John Rosenberg2:11:39

But um certainly for the first one, we think the 20,000 will allow us to uh build it properly and put something in place that can kind of maybe be uh the foundation of a template moving forward for uh many of the things that we'd put in there.

David Screech2:11:53

Okay, thank you.

David Screech2:11:54

Counselor Matson?

Ron Mattson2:11:56

Yeah, first off, and I always have a problem when people who live on the water don't want someone else accessing the water just because they think it's you know, they're here to everything from kids having wild parties, et cetera, et cetera.

Ron Mattson2:12:10

And so I have no patience for that.

Ron Mattson2:12:12

And so I w I'd like to see us continue with this one, if not for another reason for that.

Ron Mattson2:12:14

Yeah.

Ron Mattson2:12:19

The other aspect is, you know, I mean, we did not think on Heart Road.

Ron Mattson2:12:23

Uh we got a bunch of volunteers in, we cleared cleared it out.

Ron Mattson2:12:26

Park or um, I think who was it?

Ron Mattson2:12:30

David came down with us, told us what we should do and what we shouldn't, what we can take out, what we shouldn't take out.

Ron Mattson2:12:36

And uh, you know, it didn't seem to be rocket science.

Ron Mattson2:12:39

I mean, staff was able to let us know what we should do, and and we shouldn't get go right down to the water um because if there was a a you know dropped off fairly well clear, you know, fairly steeply.

Gery Lemon2:12:52

So I just don't see the need for us to spend a ton of money on on professionals to come down and tell us what our probably our park staff already know it's really gonna be minor it's just so much little access councillor lemmon thank you um uh director rosenberg two questions um the forty thousand dollars if if if we go with the twenty thousand this year and forty thousand in the subsequent years does that mean doing two road ends per year uh you'd have to ask director chase that is actually her POS form.

John Rosenberg2:13:27

Okay Director Chase and you are muted, Lindsay.

Speaker_82:13:35

Yes it could yes in in short we it is possible, but we could be doing two each year.

Gery Lemon2:13:42

Okay.

Gery Lemon2:13:43

Second question.

Gery Lemon2:13:44

Heddle Road.

Gery Lemon2:13:45

I'm trying I'm I'm struggling with envisioning this this sublime little picnic spot um up behind the fire hall.

Gery Lemon2:13:53

Um what are we what are we thinking of there?

David Screech2:13:57

Um we'd have to look in the parts of the case.

John Rogers2:14:02

I I think if you're talking about a road end to the beach, it's actually crescent.

John Rogers2:14:06

Yeah.

Speaker_82:14:08

I I don't I don't believe Hedlectic.

David Screech2:14:12

It is on the list here in the budget binder, but obviously that's uh Hedle's not water.

David Screech2:14:18

But at any rate, that's that's three years away at the minimum.

David Screech2:14:22

So still a question.

David Screech2:14:24

We can clarify it before then, I'm sure.

John Rogers2:14:26

We should go home.

John Rogers2:14:28

Thank you.

John Rogers2:14:31

You know, I I we'll move the cream place, we see how successful that is, and then we'll it'll be an opportunity to reevaluate this whole plan of road ends and the cost therein fine.

David Screech2:14:41

So is there general consensus to leave the 20,000 in and move forward with the Crane Place one for this year?

David Screech2:14:48

Yes.

David Screech2:14:49

Okay, so I'm seeing general noddings of heads and perhaps direct chase you could clarify for Councillor Lemmon why Hedel Road is on that list at some point in the future.

John Rogers2:15:03

And even why party place.

John Rogers2:15:05

I will do that.

John Rogers2:15:06

We have the party place.

David Screech2:15:07

Right.

David Screech2:15:08

Right.

David Screech2:15:10

Okay.

David Screech2:15:11

So we may not get through parks tonight if each one's gonna take that long.

David Screech2:15:17

Um so okay, so now we're on to the lime kill, and that is all completely grant dependent.

David Screech2:15:27

Yep.

David Screech2:15:27

So we don't need to discuss it.

David Screech2:15:28

Nope.

David Screech2:15:29

Okay.

Ron Mattson2:15:29

Well, so John and I won't fight it.

David Screech2:15:34

So next we have playground equipment.

David Screech2:15:38

So do we want to bump that one?

David Screech2:15:40

I mean, in the interest of showing the community that we are trying to be um frugal and save some money.

David Screech2:15:47

So we'll move that to 2022.

David Screech2:15:51

Well, just um go ahead.

Damian Kowalewich2:15:54

Just making sure, and I don't know that part, but how bad is it?

Damian Kowalewich2:16:03

Not bad.

Damian Kowalewich2:16:04

Not bad.

Ron Mattson2:16:04

Not bad.

David Screech2:16:06

It's not great, but it's not terrible.

Damian Kowalewich2:16:08

Okay, okay.

Damian Kowalewich2:16:09

If it if it's acceptable, I have no problem moving it one more air.

Ron Mattson2:16:12

As long as it's not dangerous.

Damian Kowalewich2:16:14

Yeah, exactly.

Ron Mattson2:16:15

Yeah.

John Rogers2:16:16

John?

John Rogers2:16:16

Yeah.

John Rogers2:16:17

I I think um, if I'm not mistaken, staff, you had gone in and and daylighted this.

John Rogers2:16:23

Um is that the same park?

John Rogers2:16:25

No one yes.

John Rogers2:16:26

Yeah.

John Rogers2:16:26

And so you daylighted it, and I think that's what the the residents were mostly concerned about.

John Rogers2:16:32

Um I haven't heard anything more uh from from folks, but that was uh I think that was the appreciated point.

John Rosenberg2:16:39

Yeah, at the end of the day, this is just our last wooden structure.

John Rosenberg2:16:42

It does not conform to CSA standards.

John Rosenberg2:16:44

Um we do do our um our uh required maintenance of the structure, and we certainly do our inspections as well.

John Rosenberg2:16:52

So um, you know, kids have played in that structure for many, many years.

John Rosenberg2:16:56

It certainly is safe, it's just not to today's standards.

John Rosenberg2:16:59

Uh that's why it's on the list, and it will be the last one with regards to uh removing the wood structures.

John Rosenberg2:17:06

Um I don't have any significant objection to uh pushing it a year.

David Screech2:17:13

So presumably if we pushed that a year, then we would be pushing everything under this category one year out, right?

John Rosenberg2:17:20

Because of capability of and that would make sense to me, your worship, yes.

David Screech2:17:27

Okay.

David Screech2:17:29

So that's C032.

David Screech2:17:34

So now we're on to C035, which is New Royal Park Development.

Ron Mattson2:17:43

Park's fine now for a year.

David Screech2:17:45

So I have to say, from my perspective, I'm really happy to see uh because there's no point in just doing these plans if we don't implement some sort of a funding measure and funding plan to see them happen.

David Screech2:18:02

Um so Lindsay, did you want to talk to this, or are there any questions?

Speaker_82:18:09

I I'm I'm certainly happy to speak to it.

Speaker_82:18:12

Um, this is um absolutely consistent with the groundwork that needs to be done in order to facilitate future stages of uh of park development.

Speaker_82:18:24

Um as we certainly discovered we do continue to have some ongoing drainage issues and grading issues etc so those are the types of things that we would address first.

Speaker_82:18:35

And then in future years we'll be getting into the um the fun stuff and and the funding you're suggesting could come from gas tax?

Speaker_82:18:46

Gas tax and a small amount of development cost charges, yes.

Speaker_82:18:49

Right.

David Screech2:18:52

Councilor Rogers?

John Rogers2:18:53

Yeah.

John Rogers2:18:53

So I'm trying to figure out um what we would get for 158,000.

Speaker_82:19:01

If you go to the POS, which is C035.

Speaker_82:19:10

And I am flipping there as well.

Speaker_82:19:17

The second page of the POS includes the cost estimates from the consultant regarding phases one and two of the work.

Speaker_82:19:28

So what this includes is things like the hydrologic assessment, the grading design and stormwater management, repairing and planting guidance, and wetland design and construction.

Speaker_82:19:42

So those are those are some of the big ones that need to be done before we go ahead and do the other things.

Speaker_82:19:51

This could also include some of the work on some of the underground services, et cetera, that will be needed to support things like a future uh washing facility that is not a port a potty um at that at that particular park.

John Rogers2:20:12

Yeah, so okay, you know, we've we've got 40,000 in um consultant services.

John Rogers2:20:18

Um are we would we get um uh yeah, a drinking fountain, for example.

David Screech2:20:28

So I mean I think I think it's important to look at this.

David Screech2:20:33

You know, we we've adopted a plan for a park, and there's short-term goals and there's medium-term goals, and there's long-term goals.

David Screech2:20:41

And I think it's important for us as the up here people to give staff the funding to take that forward and make those things happen without us specifically saying, I mean, the drinking fountain we had as a you know, as a separate thing, and I would be perfectly okay with putting that back in this year's budget.

David Screech2:21:03

We took it out of last year's because of COVID.

David Screech2:21:05

But I think if we're gonna do that, we should do that.

David Screech2:21:07

It's a completely separate thing from this.

Speaker_82:21:11

Just really quickly, your worship, the drinking fountain is uh listed under item D, site furniture and structures, uh point nine.

David Screech2:21:19

Yeah, I I was just trying for us not to be prescriptive from this list of what we thought you needed to pull off the list.

John Rogers2:21:28

That's all your worship, um you know, I I generally agree, but uh uh it would be worthwhile um for you know as people are seeing what works be done and and um because the the list on on page 39 is as up to 700,000.

John Rogers2:21:45

So if if we could get some uh sense from that list, um, you know, where you know what is priority one, two, and three.

David Screech2:21:54

Um why why do we need that, Counselor Rogers?

David Screech2:21:56

If you would like to see the drinking fountain included, we can do that.

David Screech2:22:00

But why do we need that?

David Screech2:22:03

There's a plan in place with short-term, medium-term, and long term goals, and staff is wanting to fund that plan.

David Screech2:22:10

And we should have, in my estimation, we should tell them to do in their professional opinion, you know, in the logical order of how they feel it needs to be done within the funds that are available.

David Screech2:22:23

But if you want to make a proviso that the drinking fountains included, then I don't I don't think that's unreasonable.

John Rogers2:22:30

Well, certainly for the bike park and and uh those folks, but you know, there's yeah, well, that was already approved last year.

David Screech2:22:37

I don't think you're gonna have any argument about that.

Gery Lemon2:22:40

It's there under number three of the priority list.

Gery Lemon2:22:42

Yeah.

Gery Lemon2:22:43

Yeah.

David Screech2:22:46

So is everyone generally okay with the concept of the funding as as staff have presented?

Gery Lemon2:22:52

Yeah, I I think the residents are really excited about this.

Gery Lemon2:22:56

I'm pleased to be pleased to see it go forward.

David Screech2:23:00

Councillor Kwalowich?

Damian Kowalewich2:23:02

It's uh it's our flagship park.

Damian Kowalewich2:23:04

We've made a commitment to it, and I think uh it's a strong signal that we're investing in our own community and recreation and parks and leisure for residents.

John Rogers2:23:16

You know, and if we're able to achieve the the top priorities that are listed on um page 93, you know, one, two, and three, then um, yeah, I think maybe four is gonna be deferred.

John Rogers2:23:27

But if we're gonna do those top five that staff have uh identified for 158,000, but you know, that's amazing.

John Rogers2:23:34

Um I'm certainly happy with that.

David Screech2:23:36

Good.

David Screech2:23:37

Okay.

John Rosenberg2:23:37

And um sorry to interject, but you're not doing those top five for 158,000.

David Screech2:23:44

No.

David Screech2:23:45

Well, I think we're not no, we're not doing the top.

John Rogers2:23:49

Okay.

John Rogers2:23:49

Because you know, hmm.

David Screech2:23:51

That that was my point, Councilor Rogers.

David Screech2:23:54

That we're we're approving a funding model of what staff can with confidence go forward and plan them out on a m multi year schedule of how they're all gonna happen.

David Screech2:24:06

Um council approved.

David Screech2:24:08

We can we can approve that with making sure that the drinking fountain happens.

John Rosenberg2:24:15

Your worship, I I I'm pretty sure I'm gonna be the one tasked with installing that drinking fountain.

John Rosenberg2:24:22

And I'm more than happy to do that.

John Rosenberg2:24:25

My concern with that is and I'm okay with this too, because it's a small ticket item, is that where I put the drinking fountain this year might not ultimately be the best spot in future years when we put in a bathroom and uh gazebo and all of these other things that we're going to do.

John Rosenberg2:24:45

So I, you know, it's quite likely it's going to be several years away.

John Rosenberg2:24:48

So I think an interim measure of finding the best spot today to put in a w water fountain is fine.

John Rosenberg2:24:53

But I just want to caution that someday we might be moving that water fountain.

John Rosenberg2:24:57

And if I'm still here, I I hope somebody remembers that I did make that caution because I think it'll end up being moved uh in future years.

John Rosenberg2:25:05

But I think we'll get good use out of it between now and then.

John Rogers2:25:07

Where are you going?

David Screech2:25:08

Go ahead.

David Screech2:25:10

Okay.

David Screech2:25:11

So we're fine with that.

David Screech2:25:12

Just put the drinking fountain somewhere close to the bike park.

John Rogers2:25:18

We'll deal with moving it later.

David Screech2:25:21

And we're okay with the funding.

David Screech2:25:25

No, we're not.

David Screech2:25:26

Well, Councillor Matson's not, but we're getting general nods of the head that we are.

David Screech2:25:30

So I think with that, I'm gonna suggest we call it a night because I can feel myself becoming bad-tempered.

David Screech2:25:37

And so before we actually see that happen, why don't we call it a night?

David Screech2:25:45

Thanks everyone, and we'll see you tomorrow night, same time, same place.

David Screech2:25:50

Good work.

John Rogers2:25:51

You survived till 8:30.

David Screech2:25:52

Yeah, no, we did pretty well.

David Screech2:25:54

We got we got through a lot of stuff.

David Screech2:25:55

Thank you, staff.