This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Attachment 7. Plan A1.4 - Pedestrian/Vehicle Circulation Plan
Appendix

Attachment 7. Plan A1.4 - Pedestrian/Vehicle Circulation Plan

December 10, 2013Page 212 sections

Layout plan detailing pedestrian linkages, vehicle circulation, and truck loading routes within the site.

1 CALL TO ORDER

Attachment 7

EAGLE CREEK VILLAGE

Page 21

PEDESTRIAN & VEHICLE CIRCULATION PLAN

Main site plan titled "Pedestrian & Vehicle Circulation Plan" showing the layout of Buildings 1 through 8, internal parking, and access routes from Watkiss Way and Helmcken Road. The plan distinguishes between Phase I and Phase II developments.
Main site plan titled "Pedestrian & Vehicle Circulation Plan" showing the layout of Buildings 1 through 8, internal parking, and access routes from Watkiss Way and Helmcken Road. The plan distinguishes between Phase I and Phase II developments.

LEGENDS

  • PEDESTRIAN LINEAGE: Light blue dashed line
  • VEHICLE CIRCULATION: Yellow solid line
  • TRUCK CIRCULATION: Orange solid line
  • FIRE TRUCK ACCESS: Red dashed line
  • VERTICAL CIRCULATION: Purple shaded area

LOADING DETAIL DIAGRAMS

PLAN ANNOTATIONS

  • Roads: Watkiss Way, Helmcken Road
  • Buildings: Building 1, Building 2, Building 3&4, Building 5, Building 6, Building 7, Building 8
  • Key Features:
    • Site Entry (Watkiss Way)
    • Site Entry (Helmcken Road)
    • Bus Stop (Watkiss Way)
    • "Pedestrian Mews" (between Building 6 and 7)
    • Play Area (near Building 1 and 2)
    • Loading zones for Building 6, 7, and 4
  • Phasing: Boundary line between Phase I and Phase II

A1.4

Page 21
Extracted from: 2013 12 10 Council Agenda