This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Attachment 9. Plan A1.5.1 - Shadow Study (June/July/August)
Appendix

Attachment 9. Plan A1.5.1 - Shadow Study (June/July/August)

December 10, 2013Page 231 section

Shadow analysis for 10am, 2pm, and 4pm during summer months.

1 CALL TO ORDER

EAGLE CREEK VILLAGE

SHADOW STUDY

Project Location: Watkiss Way & Helmcken Road, View Royal, BC Date: 06/10/11 Scale: 1:1000 Drawing Number: A1.5.1 Attachment: Attachment 9

A grid of nine site plan diagrams showing shadow studies for Eagle Creek Village. The site plans illustrate buildings labeled "PHASE I" and "PHASE II" situated at the intersection of Watkiss Way and Helmcken Road. Each diagram shows the shadows cast at a specific date and time.
A grid of nine site plan diagrams showing shadow studies for Eagle Creek Village. The site plans illustrate buildings labeled "PHASE I" and "PHASE II" situated at the intersection of Watkiss Way and Helmcken Road. Each diagram shows the shadows cast at a specific date and time.

The shadow studies include the following diagrams:

  • SHADOW STUDY-Jun 21 10am
  • SHADOW STUDY-Jun 21 2pm (Contains handwritten note: "P18")
  • SHADOW STUDY-Jun 21 4pm
  • SHADOW STUDY-July 21 10am
  • SHADOW STUDY-July 21 2pm
  • SHADOW STUDY-July 21 4pm
  • SHADOW STUDY-Aug 21 10am
  • SHADOW STUDY-Aug 21 2pm
  • SHADOW STUDY-Aug 21 4pm
Page 23
Extracted from: 2013 12 10 Council Agenda