Council Meeting/Documents/Eagle Creek Village Servicing Plan (Attachment 42)
Appendix

Eagle Creek Village Servicing Plan (Attachment 42)

December 10, 2013Page 561 section

Engineering site plan showing the layout of utility services including water, gas, hydro, and storm drainage systems.

1 CALL TO ORDER
Westbrook Consulting Ltd.Drawing 2823-DP01May 2012

Servicing Plan - Eagle Creek Village

Detailed engineering servicing plan for Eagle Creek Village, showing buildings 1 through 8, surrounding roads (Watkiss Way, Helmcken Road, Chancellor Ave), and underground utility layouts for water, sewer, and storm drainage. Includes an inset map for the storm drain outlet and a roundabout.
Detailed engineering servicing plan for Eagle Creek Village, showing buildings 1 through 8, surrounding roads (Watkiss Way, Helmcken Road, Chancellor Ave), and underground utility layouts for water, sewer, and storm drainage. Includes an inset map for the storm drain outlet and a roundabout.

Legend - Proposed services shown bold

Symbol Description Symbol Description Symbol Description
WATER —W— WATER GAS —G— EXISTING U/G UTIL. MANHOLE HYDRANT
SEWER —S— SEWER CURB PROPOSED U/G UTIL. CLEANOUT VALVE
DRAIN —D— DRAIN SIDEWALK LIGHT STANDARD CATCHBASIN METER
NATURAL GRADE NATURAL GRADE EDGE PAVE. POWER POLE ROAD SIGN REDUCER
CULVERT CULVERT BUSHLINE ANCHOR MONUMENT LOT PIN
HEADWALL HEADWALL TREE LEAD PLUG

Revisions

No. Description Date By Appd.
1 REVISED FOR NEW BUILDING LAYOUT 2012-05-15 BJL FC
2 ISSUED FOR DEVELOPMENT PERMIT 2013-01-25 BJL FC
3 RE-ISSUED FOR DEVELOPMENT PERMIT 2013-10-30 BJL FC

Project Information

  • Project: Eagle Creek Village, Omicron Development Inc.
  • Drawing Title: Servicing Plan
  • Consulting Firm: Westbrook Consulting Ltd. (#115 - 850 Goldstream Ave., Victoria, BC V9B 0J3; Tel: 250-391-8532; Fax: 250-391-8593)
  • Westbrook Project No.: 2823
  • Drawing No.: 2823-DP01
  • Sheet: 1 of 3
  • Date: MAY 2012
  • Designed: KS
  • Checked: FC
  • Drawn: BJL
  • Scale: Horiz. 1:500; Vert. N/A

Key Plan Notes and Labels

  • Building Elevations (MFE):
    • Building 1: MFE 20.00
    • Building 2: MFE 21.00
    • Building 3: MFE 21.00
    • Building 4: MFE 22.00
    • Building 5: MFE 23.00
    • Building 6: MFE 20.00
    • Building 7: MFE 20.00
    • Building 8: MFE 20.00
  • Utility & Infrastructure Callouts:
    • Storm Drain Outlet (Scale 1:500)
    • Proposed Rain Garden. Refer to Storm Water Management Plan.
    • Oil/Grit Interceptor (multiple locations)
    • Rain Water Leader Connection (multiple locations)
    • Fire Hydrant. Refer to mechanical for connection details. (multiple locations)
    • Existing cathodic protection for CRD supply mains.
    • Proposed CRD pressure reducing station.
    • Headwall at outlet to rain garden (Typ.).
    • Retain existing fire hydrant.
    • Replace existing 150ø sewer main with 200ø PVC DR35 at lower grade.
    • Reconnect to existing 150ø water main.
    • Reconnect to existing supply main No. 1 & install pressure reducing valve.
    • 150ø perforated PVC drain under rain garden (Typ.).
    • Lawn basin connected to 150ø perforated drain (Typ.).

General Note: THE LOCATION AND ELEVATION OF EXISTING UNDERGROUND SERVICES ON THIS DRAWING ARE NOT NECESSARILY OR COMPLETE. THE ACTUAL HORIZONTAL AND VERTICAL LOCATIONS MUST BE CONFIRMED BY UTILITY COMPANIES AND THE CONTRACTOR PRIOR TO THE START OF ANY EXCAVATIONS.