Council Meeting/Documents/Attachment 2. Thetis Vale Phase 6 - Conceptual Site Plan
Appendix

Attachment 2. Thetis Vale Phase 6 - Conceptual Site Plan

July 15, 2014Pages 19–201 section

Conceptual drawing showing the proposed lot layout and road realignment for Phase 6.

1 CALL TO ORDER
Thetis Vale Phase 6Limona Construction

THETIS VALE PHASE 6 - OVERALL SITE PLAN CONCEPTUAL DRAINAGE

Engineering drawing showing the overall site plan and conceptual drainage for Thetis Vale Phase 6, including lot layouts for lots 1 through 21, topographical contours, a cross-section profile of a highway offramp (Section B-B), and earthwork volume calculation data.
Engineering drawing showing the overall site plan and conceptual drainage for Thetis Vale Phase 6, including lot layouts for lots 1 through 21, topographical contours, a cross-section profile of a highway offramp (Section B-B), and earthwork volume calculation data.

Project Information

Field Detail
Project LIMONA CONSTRUCTION
Location THETIS VALE PHASE 6
Drawing Title OVERALL SITE PLAN CONCEPTUAL DRAINAGE
Project No. 20132400
Drawing Number 2450-00-FG.102
Revision A
Scale 1:500
Drawn/Designed DAH
Status PRELIMINARY NOT FOR CONSTRUCTION DRAFT

Site Data and Notes

Volume - Fee Simple Region Only

  • 10700 m³ CUT
  • 16500 m³ FILL

Key Map Labels and Notes

  • HWY OFFRAMP: Location of Section B-B profile.
  • Alternate 1: Stacked boulder wall with 1.0m bench when over 3.5m height.
  • Approx extent of concrete-infilled wall.
  • Inlet headwall.
  • Remove headwall & extend pipe.
  • Wall height markers (referenced with a diamond symbol).

Section B-B Details

A cross-sectional profile titled "SECTION B-B" shows elevation data for the HWY OFFRAMP from station 3+000 to 3+160. Elevations range approximately from 30.0m to 45.0m.


THIS PAGE INTENTIONALLY LEFT BLANK

Page 19–20
Extracted from: 2014 07 15 Council Agenda