This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/APPENDIX E: CRD WATER INFORMATION
Appendix

APPENDIX E: CRD WATER INFORMATION

January 18, 2022Pages 245–2472 sections

Supporting technical documentation regarding CRD water infrastructure and hydrant flow curves for the proposed development at 167/169/171 Island Highway.

Addresses: 167, 169, 171 Island HighwayHydrant Curve for VRFD079 on Island HighwayPrepared for GT Mann Contracting Ltd.File No: 2241-21060

APPENDIX E

CRD WATER INFORMATION

Conceptual Servicing Brief | Prepared for GT Mann Contracting Ltd. 167 / 169 / 171 Island Highway, View Royal, BC


[Map: CRD Water Infrastructure Map showing water mains, hydrants, and valves in the vicinity of Island Highway and View Royal. Key infrastructure includes an 813 ST water main along Island Highway and a 400 DI main. Hydrants VRFD079, VRFD279, VRFD149, and VRFD105 are identified.]

Legend

Facility or Station Bulk Meter
Disinfection Facility (DF) Distribution Balancing Meter (M)
Injection Supply Bulk Meter (M)
Pump Station
Storage Facility
Control Valve Hydrant
Altitude Valve (H) Bulk Water Station
Check Valve Hydrant
Pressure Control Station Standpipe
System Valve Fitting
Air Release, True (A) Cap
Flush, True Reducer
Lateral Valve, False; Valve, False
Lateral Valve, True; Valve, True
Valve Vault, False
Valve Vault, True

Notes Scale 1: 1,984


Page 245–247

Hydrant Curve for VRFD079 on Island Highway

[Chart: Line graph showing the relationship between Residual Pressure (m) and Available Flow (L/s) for hydrant VRFD079. The vertical axis represents Residual Pressure from 0 to 110 m, and the horizontal axis represents Available Flow from 0 to 450 L/s. The curve starts at approximately 95 m pressure at 0 L/s flow and descends to approximately 70 m pressure at 500 L/s flow.]

Page 245–247
Extracted from: 2022 01 18 Council Agenda - Agenda - Pdf