This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/APPENDIX F: FUS FIRE FLOW CALCULATION
Appendix

APPENDIX F: FUS FIRE FLOW CALCULATION

January 18, 2022Pages 248–2492 sections

Technical fire flow calculations based on the Underwriters Guide for the development at 167-171 Island Highway.

Estimated Fire-Flow: 350.0 L/sTotal FUS Fire-Flow Coverage Required: 170.6 L/sBuilding area: 5567 sq.mConstruction Type: Wood Frame

APPENDIX F: FUS FIRE FLOW CALCULATION

Conceptual Servicing Brief | Prepared for GT Mann Contracting Ltd. 167 / 169 / 171 Island Highway, View Royal, BC


Page 248–249

Fire Flow Calculation - based on Underwriters Guide, 1999

167, 169, 171 Island Highway, View Royal, BC

Type of Construction

Coefficient (C) Construction Description
1.5 Wood Frame - structure essentially all combustible
1 Brick or masonry walls - ordinary construction
0.8 Unprotected metal structural components - non combustible
0.6 Fully protected frame, floor, roof - fire resistive
1.30 Selected Coefficient (Reduced for non-combustible siding and roofing)

Finished Floor area

  • A = 5567 sq.m (59920 sq.ft)

Estimated Fire-Flow

  • F = 220 * C * (A^1/2)
  • F = 21339 L/min
  • F = 21000 L/min (Rounded to nearest 1000)
  • F = 350.0 L/s

Reductions and Charges

Occupancy

The Estimated Fire-Flow above can potentially be reduced as follows:

% Occupancy Type
-25 Non-combustible
-15 Limited Combustible
0 Combustible
15 Free burning
25 Rapid burning
  • Selected: -25%
  • Amount of Fire-Flow reduction (Occupancy): F = -87.5 L/s
  • Estimated Reduced Fire-Flow (Occupancy): F = 262.5 L/s

Sprinkler Protection

% Sprinkler Type
-50 Fully automated sprinklers
-40
-30
0 No sprinklers
  • Selected: -50%
  • Amount of Fire-Flow reduction (Sprinkler): F = -131.3 L/s

Exposure Separation

# of sides Separation Charge % Location Description
0 0 - 3 meters 0
0 3.1 - 10 0
0 10.1 - 20 0
1 20.1 - 30 10 Six mile pub to the west
1 30.1 - 45 5 View Royal municipal hall to the south and house across the road to the north
2 45 - 0 park to the east
4 15% (75% max)
  • Exposure Separation charge: F = 39.4 L/s

Final Calculation

  • Estimated Fire-Flow (with reductions & charges): F = 170.6 L/s

TOTAL FUS FIRE-FLOW COVERAGE REQUIRED

  • F = 170.6 L/s (10237.5 L/min)

Building area provided by Urban West Architecture Inc.

2021-12-02 21-060-FUS calculation.xls 12/2/2021

Page 248–249
Extracted from: 2022 01 18 Council Agenda - Agenda - Pdf