This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Schedule 7 - Plan View (Sheet 3)
Appendix

Schedule 7 - Plan View (Sheet 3)

November 4, 2025Page 1721 section

Specialized engineering plan view from EarthTech Solutions focusing on Mechanically Stabilized Earth (MSE) retaining wall systems.

Sheet 3EarthTech Solutions CorpProject No: ETS-220147

PLAN VIEW

Project Name: 9 Erskine Lane Lock+Load MSE Retaining Wall Project Number: ETS-220147 Sheet Number: 3

GENERAL DESIGN NOTES:

  • THE SITE PLAN IS FOR ILLUSTRATION ONLY.
  • LOCK+LOAD PANELS ON THE VERY END OF THE WALLS SHOULD BE BENDED 90 DEGREES TO HOLD THE BACKFILL MATERIAL PROPERLY, IF NOT AGAINST OTHER STRUCTURES.

Revision History

No. Date Revision By
0 08/28/2023 Issued for Construction Approval GD
0 07/16/2025 As-Built GD
1 10/08/2025 As-Built GD

Project Details

  • Designed By: H.Z
  • Scale: NS

Contact Information

EarthTech Solutions Corp One-Stop Services for your MSE Projects

Site Plan Overview

The plan illustrates the layout for the 9 Erskine Lane project, featuring:

  • Structures: BUILDING C and BUILDING D.
  • Roadways: ERSKINE LANE.
  • Land Parcels: LOT 2, LOT 3, REM LOT A, REM LOT B, REM LOT C, and STRATA PLAN VIS3076.
  • Retaining Walls: Multiple sections of Lock+Load MSE Retaining Walls are identified with labels including B-A W-1 through B-A W-5, B-C W-1 through B-C W-4, and B-D W-1. Surveyed elevation points are marked throughout the site.
Page 172

Document Images

(4)
Document image
Document image
Document image
Document image
Extracted from: 2025 11 04 Council Agenda - Agenda - Pdf