Bylaw
Fees and Charges Bylaw No. 958, 2016, Amendment Bylaw No. 1158, 2025
October 21, 2025Page 741 section
A bylaw to amend the Town of View Royal Sanitary Sewer Rates.
Bylaw No. 1158Relates to Sanitary Sewer Rates
Proposed Elevations - Bldg B
Project Information
- Project: Erskine Multifamily
- Drawing Title: Proposed Elevations Bldg B
- Sheet Number: PR8
- Scale: As Noted (1:128 Metric)
- Project No: 20--
- Drawn By: MM
- Checked By: Thuja
Revisions
| Description | Date |
|---|---|
| ISSUED FOR REVIEW | JUL 07 2019 |
| ISSUED FOR REVIEW | AUG 13 2019 |
| ISSUED FOR REVIEW | OCT 23 2019 |
| ISSUED FOR REZONE | NOV 04 2019 |
| ISSUED FOR REZONE | JAN 23 2020 |
| ISSUED FOR REVIEW | MAR 09 2020 |
| ISSUED FOR REVIEW | MAY 21 2020 |
| REISSUED FOR REZONE | AUG 06 2020 |
| UPDATED | NOV 20 2020 |
| PARKING REVISED | APR 30 2021 |
| ISSUED FOR DP | MAY 11 2021 |
Material Legend
| ID | Material Description |
|---|---|
| 1 | FIBRE CEMENT PANELS: "IRON GREY" SMOOTH FINISH |
| 2 | FIBRE CEMENT PANELS: "GREY SLATE" SMOOTH FINISH |
| 3 | FIBRE CEMENT PANELS: "LIGHT MIST" SMOOTH FINISH |
| 4 | WINDOW BOXES: FIBRE CEMENT LAPPED "CEDARTONE" * |
| 5 | 2-PLY SBS ROOFING MEMBRANE - BLACK |
| 6 | VINYL WINDOWS - BLACK |
| 7 | HANDRAILS, FASCIA, DOWNSPOUTS, FLASHING PAINTED: BLACK |
| 8 | ARCHITECTURAL CAST IN PLACE CONCRETE |
| 9 | SOFFIT: CEDAR RENDITIONS IN "TIMBERLINE" |
Elevation Drawings
Front Elevation


Vertical Datum Points:
- TOP OF ROOF: 42.67'
- FIFTH FLOOR T.O. PLY: 40.75'
- FOURTH FLOOR T.O. PLY: 31.58'
- THIRD FLOOR T.O. PLY: 22.42'
- SECOND FLOOR T.O. PLY: 13.25'
- AVERAGE GRADE: 4.08'
- MAIN FLOOR T.O. PLY: 0.0'
Side Elevation (Left)
Vertical Datum Points:
- TOP OF ROOF: 42.67'
- FIFTH FLOOR T.O. PLY: 40.75'
- FOURTH FLOOR T.O. PLY: 31.58'
- THIRD FLOOR T.O. PLY: 22.42'
- SECOND FLOOR T.O. PLY: 13.25'
- AVERAGE GRADE: 4.08'
- MAIN FLOOR T.O. PLY: 0.0'
Side Elevation (Right)
Vertical Datum Points:
- TOP OF ROOF: 42.67'
- FIFTH FLOOR T.O. PLY: 40.75'
- FOURTH FLOOR T.O. PLY: 31.58'
- THIRD FLOOR T.O. PLY: 22.42'
- SECOND FLOOR T.O. PLY: 13.25'
- AVERAGE GRADE: 4.08'
- MAIN FLOOR T.O. PLY: 0.0'
Rear Elevation
Vertical Datum Points:
- TOP OF ROOF: 42.67'
- FIFTH FLOOR T.O. PLY: 40.75'
- FOURTH FLOOR T.O. PLY: 31.58'
- THIRD FLOOR T.O. PLY: 22.42'
- SECOND FLOOR T.O. PLY: 13.25'
- AVERAGE GRADE: 4.08'
- MAIN FLOOR T.O. PLY: 0.0'
General Notes
CONTRACTOR TO VERIFY ALL LEVELS, EXISTING SURVEY DIMENSIONS, LOCATION OF BUILDING ON SITE AND LOCATION OF ALL SERVICES PRIOR TO START OF WORK. NO WORK TO BE DONE IN ACCORDANCE WITH THIS SET UNLESS IT COVERS CURRENT REVISIONS AND ALL DRAWINGS IN THE PROJECT.
COPYRIGHT RESERVED. THESE PLANS ARE THE PROPERTY OF THUJA ARCHITECTURE + DESIGN. TO BE USED SOLELY FOR THE PROJECT SHOWN. REPRODUCTION IN WHOLE OR IN PART BY ANY MANNER IS NOT PERMISSIBLE.
Page 74
Document Images
(9)Extracted from: 2025 10 21 Council Agenda - Agenda - Pdf








