This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/ATTACHMENT 1: SKETCH PLANS – SIDEWALK GAP
Appendix

ATTACHMENT 1: SKETCH PLANS – SIDEWALK GAP

October 7, 2025Page 712 sections

Aerial sketch showing the proposed sidewalk extension location on Conard Street.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 6:00 p.m.
Location: between 21 Conard St and 4 Helmcken Road

Report to Council Re: Sidewalk Extension Request – Conard Street Meeting Date: October 21, 2025

Page 71

ATTACHMENTS:

  1. Sketch Plan – Sidewalk Gap

ATTACHMENT 1: SKETCH PLANS – SIDEWALK GAP

Aerial map showing a sketch plan for a sidewalk gap on Conard Street. The map indicates a pink line for "New sidewalk (4 Helmcken Servicing)" and a red dashed line for a "Proposed sidewalk extension (~14m)". Surrounding streets shown include Helmcken, Camden, and a pointer "To Burnside Rd".
Aerial map showing a sketch plan for a sidewalk gap on Conard Street. The map indicates a pink line for "New sidewalk (4 Helmcken Servicing)" and a red dashed line for a "Proposed sidewalk extension (~14m)". Surrounding streets shown include Helmcken, Camden, and a pointer "To Burnside Rd".
Page 71
Extracted from: 2025 10 07 Council Agenda - Agenda - Pdf