This site is in beta — data may be incomplete and features are still being added.
Council Meeting/Documents/Email dated March 27, 2023 from Mark Buesink
Correspondence

Email dated March 27, 2023 from Mark Buesink

April 15, 2025Page 4401 section

Email from a structural engineer to the property owner regarding variations and changes in construction that are not code compliant.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 7:00 p.m.
March 27, 2023Mark Buesink, P.Eng.buepoint consulting ltdConstruction variations are not code compliant or consistent with industry standardsAttachment 1

Correspondence: Re: specialized site meeting

From: Mark Buesink
To: John Becker; Building Permits; Dawn Miles
Cc: buepoint consulting; buepoint consulting; Anna Becker
Subject: Re: specialized site meeting
Date: March 27, 2023 5:18:53 PM
Attachments:

  • 10441 framing review - 2022.11.21.pdf
  • 10441 - follow-up framing review.pdf
  • 10441 site instructions - review 2023.03.14.pdf

Unfortunately, because of all the variations and changes in construction (many of which are not code compliant or consistent with standard carpentry and framing practices), there is a lot of review we have to do in order to analyze and work with what you have built. This became a far more challenging project for us and one I wasn't given the opportunity to turn down. In general, construction is supposed to follow the design intent of the plans or we re-design alternatives. But because you went on ahead and constructed differently, we have done our best to accommodate you. We haven't tried to fight you and I didn't make you tear everything apart. I tried to work with what was done.

I've attached both framing reviews from November as well as my recent framing review.

--
Mark Buesink, P.Eng, P.E.
structural engineer

buepoint consulting ltd
office: 250.597.2296
please cc engineering@buepoint.com for efficient service


On Mon, Mar 27, 2023 at 1:33 PM John Becker john@ccpurchasing.com wrote:

This is very unfortunate, effective immediately I am suspecting my contract with you pending further review.

John

Get Outlook for Android

Page 440
Extracted from: 2025 04 15 Council Agenda - Agenda - Pdf