Cover email for the UNISOL engineering report summarizing that the workmanship is questionable and ad hoc.

1 CALL TO ORDER- Mayor Tobias called the meeting to order at 7:00 p.m.
June 16, 2023Thor TandyStructure is not in collapse mode but workmanship is questionableAttachment 6

Email Correspondence regarding 12 Vickery Rd: Review of Engineering Details for New Structure

From: [Redacted] To: Stephen Patterson Cc: Robert Gutierrez Subject: FW: 12 Vickery Rd: Review of Engineering Details for New Structure Date: June 16, 2023 11:00:27 AM Attachments: May 14_23 Review.pdf

Try again


From: [Redacted] Sent: Sunday, May 14, 2023 4:05 PM To: Robert Gutierrez Robert@biccprofessionals.com Cc: 'Mark Buesink' mark@buepoint.com Subject: 12 Vickery Rd: Review of Engineering Details for New Structure

Hi Robert

  1. Attached our report as requested. Please let me know if you need/want more detail/clarifications.
  2. FWIW, although the structure is obviously not in collapse mode, some of the workmanship is questionable and ad hoc.
  3. As I note in my report, the Owner asked UNISOL to carry out a detailed (re) design of the structure in order to identify/prove faulty engineering which seems to be the cause of the current impasse. I declined since I was satisfied that the original engineering is not inadequate and I sensed probable issues with the workmanship.
  4. Since my first involvement with this, the owner has gone further with upgrades/revisions. That is his prerogative but, considering the situation, that may make further consultation/revision difficult. Also, some of the work is, again, ad hoc and lacking engineering basis.
  5. I don’t know to what extent issues to date have been corrected/revised, however, based on the small sample size of locations I observed, my recommendation is that all as-built primary structural details be reviewed (again?) for conformity to both the original specifications or subsequent instructions, as well as good practice. Since he is the EOR, I leave that for Mark to decide.

Regards Thor