Attachment # 2 - Email regarding specialized site meeting (March 27, 2023)
Email from Mark Buesink to John Becker discussing construction variations and the need for structural analysis.
From: Mark Buesink mark@buepoint.com Sent: Monday, March 27, 2023 5:17 PM To: John Becker john@ccpurchasing.com; buildingpermits@viewroyal.ca; Dawn Miles DMiles@viewroyal.ca Cc: buepoint consulting engineering@buepoint.com; buepoint consulting accounts@buepoint.com; Anna Becker anna.becker@ccpurchasing.com Subject: Re: specialized site meeting
[Redacted]
Unfortunately, because of all the variations and changes in construction (many of which are not code compliant or consistent with standard carpentry and framing practices), there is a lot of review we have to do in order to analyze and work with what you have built. This became a far more challenging project for us and one I wasn't given the opportunity to turn down. In general, construction is supposed to follow the design intent of the plans or we re-design alternatives. But because you went on ahead and constructed differently, we have done our best to accommodate you. We haven't tried to fight you and I didn't make you tear everything apart. I tried to work with what was done.
I've attached both framing reviews from November as well as my recent framing review.
-- Mark Buesink, P.Eng, P.E. structural engineer
buepoint consulting ltd office: 250.597.2296 please cc engineering@buepoint.com for efficient service
On Mon, Mar 27, 2023 at 1:33 PM John Becker john@ccpurchasing.com wrote:
This is very unfortunate, effective immediately I am suspending my contract with you pending further review. [Redacted]
John
Get Outlook for Android