Project Summary: Coastal Adaptation Plan

January 17, 2023Pages 41–421 section

Technical attachment detailing the scope, objectives, and costs for the Coastal Adaptation Plan.

8.1.c) Coastal Adaptation Plan - Union of British Columbia Municipalities (UBCM) Grant Application
Priority: StrategicTotal estimated cost: $90,000Includes heat map of potential inundation of Esquimalt Harbour

Project Summary

Priority: Strategic Project Name: Coastal Adaptation Plan 1-2-05100-615 CC510-28 Submitted by: Jeff Chow, Senior Planner

Executive Summary To prepare for climate change impacts such as sea level rise, storm surge, and extreme weather events (Strategic Plan Goal C4), the Coastal Adaptation Plan would identify the extent of flood hazards to public and private property and develop policies that will enhance long term community resiliency to these risks.

Business problem and opportunity Land along the coast faces potential flooding hazards from sea level rise, tsunamis, etc. Regional mapping was recently conducted but at a rough scale; for example, one sample cross section was used to develop flood levels for Portage Inlet and Gorge Waterway all the way to the Johnson Street Bridge. The Town’s neighbour City of Colwood has developed finer grain data from the same consultant and is working on policies with similar goals.

Proposed project objectives

  1. Map the potential extent of flood hazards along the coast
  2. Develop policies to address the risks to existing properties and public infrastructure
  3. Provide policy guidance for new development and infrastructure in coastal areas

Business risks The BC Flood Hazard Area Land Use Management Guidelines support planning for sea level rise. Without this plan, there would be no systematic approach for retreating from, reinforcing, or building up land (and public infrastructure such as roads, parks, pump stations and bridges) susceptible to rising sea levels, tsunamis, and other coastal risks.

Proposed sources of funding Casino revenue Note: staff will monitor availability of grant opportunities, which if approved would replace casino revenue funding.

Costs and benefits

Costs FY1 FY2 FY3 FY4 FY5 5-year Total
Capital 0
Operational 60,000 30,000 90,000
Total 0 0 60,000 30,000 0 90,000
Benefits
Tangible Knowledge of the extent of risks to public and private property along the coast.
Intangible Coordinated strategy to achieve long term community resiliency to flood hazards

Recommendation THAT the Committee recommend the 2022-2026 Financial Plan include coastal adaptation plan in 2024-2025 to be funded by Casino revenue.

Additional Information

  1. BC Flood Hazard Area Land Use Management Guidelines -2018 Amendment (see Sections 3.5 and 3.6) - framework for sea level rise planning https://www2.gov.bc.ca/assets/gov/environment/air-land-water/water/integrated-flood-hazard-mgmt/flood_hazard_area_land_use_guidelines_2017.pdf

  2. Example: August 2020 City of Colwood initial briefing on Coastal Flood Inundation Mapping Project https://colwood.civicweb.net/document/165664

  3. Example: May 2021 City of Colwood – Coastal Flood Inundation Mapping and Tsunami Risk Assessment (162 pages) https://colwood.civicweb.net/FileStorage/EDE7F0DF3B2C4484B27004681AF4B96D-USE%20THIS%20ONE.pdf

Tsunami Inundation Map for City of Colwood showing heat map of potential inundation depths from Cascadia Subduction Zone L1 Source at the View Royal border, Millstream Estuary, and Parsons Bridge
Tsunami Inundation Map for City of Colwood showing heat map of potential inundation depths from Cascadia Subduction Zone L1 Source at the View Royal border, Millstream Estuary, and Parsons Bridge

Excerpt: Heat map of potential inundation of Esqumalt Harbour at View Royal border – Millstream Estuary and Parsons Bridge

  1. Example: July 2016 City of Colwood Pump Station Relocation Plan RFP - example of sea level rise considerations for management of infrastructure https://www.colwood.ca/sites/default/files/RFP/RFP-2016-03%20Ocean%20Blvd%20Pump%20Station%20Relocation%20Plan.pdf
Page 41–42
Extracted from: 2023 01 17 Council Agenda - Agenda - Pdf