Council Meeting/Documents/West Shore Detachment Options Analysis (Appendix 1)
Appendix

West Shore Detachment Options Analysis (Appendix 1)

January 17, 2023Pages 51–8211 sections

Feasibility study report analyzing options for redeveloping the existing RCMP site versus building a new facility.

8.1.d) Policing Facilities Expansion Project
Date: March 14, 2022Recommended: Scenario 1 (Redevelop existing site)Target capacity: Year 2045 requirementsProposed building size: 92,417 sq ft

West Shore Detachment Options Analysis

March 14, 2022 Document # P0902-921131222-59

Exterior photo of the West Shore RCMP building at 698 Atkins Ave
Exterior photo of the West Shore RCMP building at 698 Atkins Ave
Page 51–82

Contents

  1. Background, Purpose
  2. Current State
  3. Future Requirements
  4. Site Options
  5. Options Evaluation
  6. Building to 2040/45/50
  7. Recommendations
Page 51–82

Background

  • Increase in community growth leading to...
  • Increase in RCMP staff contingent required to maintain current service, specialized police services, use of technology, need for modern facilities

West Shore detachment is nearing capacity; projections show the need for more space in the next two to four years.

Work to date:

  • July 2019: Preliminary space needs completed by RCMP
  • June 2020: Preliminary site survey for redevelopment
  • Nov 2020: Redevelopment concept sketch
  • Feb 2021: Feasibility Study
  • June 2021: (Timeline continues)
Page 51–82

Purpose of Briefing

  1. Present feasibility study findings
  2. Outline key scope and cost factors
  3. Provide recommended solution for West Shore RCMP detachment
Page 51–82

Current State

Current Site: 698 Atkins Ave

Photo of the 1960s facility
Photo of the 1960s facility
Site diagram of the current facilities showing the 1960s and 1999 buildings
Site diagram of the current facilities showing the 1960s and 1999 buildings
Photo of the 1999 facility building
Photo of the 1999 facility building
Street-level view of the main West Shore RCMP building
Street-level view of the main West Shore RCMP building
Feature Details
Building size 37,067 ft² (approx.) (26,400 ft² 1999 building + 10,667 ft² 1960s building)
Building footprint 16,800 ft² (approx.) / 0.4 acres
Parking 133 stalls / 0.9 acres
Estimated Total 1.35 acres

Facility Ownership & Occupancy

Jointly owned by City of Colwood, City of Langford and Town of View Royal.

Occupied by RCMP members, plus three tenancies:

  • Capital Region Emergency Services Telecom - approx. 1,100 ft²; excluded - pursuing own space
  • Canadian Firearms Safety Program - approx. 288 ft²
  • Provincially funded RCMP servicing Metchosin, Highlands, Songhees Nation, Esquimalt Nation.
    • 2021 Metchosin population was >5,000, now responsible for own accommodation costs

Ownership Cost Sharing

2021 Proposed Ownership Cost Sharing

Based on 2021 Hospital Assessment

Municipality 2021 Hospital Assessment Ownership Percentage Difference from 1997
Langford $11,871,422,812 60% +13%
View Royal $3,193,922,057 16% -4%
Colwood $4,768,669,615 24% -10%

Based on 2021 Census Population

Municipality 2021 Census Population Ownership Percentage Difference from 1997
Langford 46,584 60.4% +14%
View Royal 11,575 15% -2%
Colwood 18,961 24.6% -12%

Proposed Combined Formula (Highlighted)

Municipality 50% Population / 50% Assessment Difference from 1997
Langford 60.13% +13.75%
View Royal 15.56% -2.84%
Colwood 24.31% -10.91%
Page 51–82

Future Requirements

How much space do we need?

  1. How far into the future are we planning for? Assuming occupancy 2025: 2040 (15 years), 2045 (20 years), 2050 (25 years)
  2. What are the population projections for preferred planning horizon?
  3. How many RCMP members + support do we need to serve this future population?
  4. How much space (building & parking) do we need to accommodate this headcount?

How far do we plan for? 15-20-25 year population estimates

Municipality 2021 Census 2040 (15 year) 2045 (20 year) 2050 (25 year) Annual growth assumptions
View Royal 11,575 15,641 16,692 17,700 “Forecast” figures (1.86%/year decreasing to 1.2%)
Colwood 18,961 30,312 34,295 38,802 2.5% growth per CAO
Langford 46,584 91,155 103,133 116,686 5-year average 6.36% (2016-2021); 6% (2022-2025); 4% (2025-2030); 3% (2030-2035); 2.5% (2035-2050)
Metchosin 5,067 6,535 7,034 7,570 1.53% average (2016-2021)
Highlands, Songhees Nation, Esquimalt Nation 4,645 5,734 6,147 6,607 2.31% average (2016-2021) for Highlands; 0% for Songhees, Esquimalt

How many RCMP to serve 2045 population?

  • 2021 Population served: 86,832 or average ratio of 1:827
  • Municipally funded populations:
    • RCMP ratio of 1:750 for Langford
    • RCMP ratio of 1:875 for Colwood, View Royal, Metchosin
  • Provincially funded populations: <5,000 staffing RCMP at ratio of 1:930 (Current ratio)
  • Administrative support: 3 RCMP : 1 Admin

RCMP headcount for 20-year (2045) population

Community 2045 Projected Population Ratio Corresponding RCMP headcount
View Royal 16,692 1:875 19
Colwood 34,295 1:875 39
Langford 103,133 1:750 138
Metchosin 7,034 1:875 8
Highlands, Songhees Nation, Esquimalt Nation 6,147 1:930 6
RCMP FTE Total 210
Administrative support (3:1) 70
Total FTE 281

How much space do we need to accommodate this headcount? (20-year population to 2045)

Space Category Square Feet
1 GENERAL UNITS 39,042
2 COMMON UNITS- Major Crimes/Serious Crime 13,719
3 SPECIAL UNITS/LARGE DETACHMENT 7,250
4 General + Common + Special (net) 60,011
5 Gross Up 32,406
10 TOTAL GROSS SPACE REQUIRED (293 FTE) 92,417 ft²

Parking Requirements

  • 393 stalls: Maximum anticipated demand
  • 295 stalls: At 75% occupancy
  • 297 stalls: Total stalls, plus two ERT vehicles (larger)
  • 1 stall : 1 FTE (same as current)
  • 2.5 acres (at 370 ft² per stall) for parking

Benchmarking future space requirements

Metric West Shore Current Projected 2045 Kelowna (2021)
Population served 85,000 167,301 142,000
RCMP FTE 96 210 214
Total FTE 147 281 314
Policing ratio (avg) 1 to 885 1 to 795 1 to 664
Square footage 37,067 92,417 106,000
Sq.ft. Per capita 0.44 0.55 0.75
Sq.ft. Per Total FTE 252 329 338

Summary Future Requirements to 2045

Category Size
Gross building size 92,417 ft²
Building footprint (Assumes minimum footprint per WA Architects) 17,945 ft² / 0.4 acres
Parking footprint 2.5 acres
Total 2.9 acres
Page 51–82

Site Options

Options to meet future requirements

Scenario 1: Redevelop existing + leased stalls

Detailed site plan for the redevelopment of the existing site
Detailed site plan for the redevelopment of the existing site

Scenario 2: Build new with all surface parking

Regional map showing the current RCMP location and context
Regional map showing the current RCMP location and context
* Acquire land * Build new * Surface parking

Scenario 1: Redevelop existing

  • Demolish 1960s
  • Build new on 1960s footprint
  • Retain existing 1999 facility, 25% redevelopment to meet program needs
  • Incorporates 0.7 acres of adjacent, Langford-owned residential properties to increase parking capacity
Proposed site layout for Scenario 1 showing new building, existing building, and surface parking
Proposed site layout for Scenario 1 showing new building, existing building, and surface parking
Building cross-section showing office levels, main floor, and basement
Building cross-section showing office levels, main floor, and basement

Scenario 1: Future parking requirements

  • Current site has 133 stalls (including leased land and overflow).
  • 297 stalls required at 370 ft² per stall
  • 237 stalls identified
  • An additional 60 stalls still required
  • Likely addressable with one or all of:
    • revised site plans,
    • further leased land extension,
    • additional land acquisition on East side of Winster Rd,
    • or future transport modal shifts reducing requirements
Aerial view of the existing site with identified parking zones of approximately 117 and 120 stalls
Aerial view of the existing site with identified parking zones of approximately 117 and 120 stalls

Scenario 2: Alternative Site Options

Three alternative sites of sufficient size and close to 3km of desired radius:

  • A - Western Speedway
  • B - Ridley Family land (Allandale Rd)
  • C - Woodsmere Holdings

RCMP described a strong preference for the current, central location with easy access to highway 1.

Regional map identifying alternative site options A, B, and C
Regional map identifying alternative site options A, B, and C
Page 51–82

Options Evaluation: Capital Costs

Estimated capital costs: building to 2045

Cost Component Scenario 1: Redevelop existing Scenario 2: Build new
Demolition $ 633,346 $ -
Site Servicing $ 647,080 $ 823,292
Surface parking $ 1,767,131 $ 3,096,900
Building Construction $44,443,329* $50,459,547
Subtotal $47,490,886 $54,379,739
Net Zero (5%) $ 1,939,573 $ 2,718,987
Post-Disaster Standard (10%) $ 3,702,433 $ 5,709,873
Furniture, Fixtures & Equipment (2.5%) $ 1,187,272 $ 1,359,493
Land acquisition (6 properties) $ 5,400,000 $ 9,000,000
Escalation to 2024 (3.5% per year) $ 4,253,569 $ 5,211,397
Project Delivery services (12%) $ 7,676,848 $ 9,405,539
Contingency (15%) $10,747,587 $13,167,754
Proceeds of sales $ - $ (2,700,000)
Estimated capital cost (+/- 25%) $82.4M $98.3M

*Includes $6M in seismic upgrading costs added to the 1999 facility in Scenario 1 to enable useful life beyond 2045

Page 51–82

Options Evaluation: Whole Life Costs

Whole Life Cost Summary

Item Scenario 1 - Redevelop Scenario 2 - Build New Variance
2026 Operating Cost
Operating Expense ($1,182,850) ($1,134,260) $48,590
Capex Maintenance ($265,952) ($162,262) $103,690
2026 Operating Cash Flow ($1,448,801) ($1,296,522) $152,280
NPV - Operating Cost (inc. 1999 life extension) ($30,475,831) ($18,436,790) $12,039,041
Capital Cost $ (82,398,168) $ (98,252,783) $ (15,854,615)
Whole-life Cost $ (112,873,999) $ (116,689,573) $ (3,815,574)

Staff Recommendation Verbatim:

The Steering Committee recommends Scenario 1, redevelopment of existing site, given the lower capital and whole life costs, and given its preferred, central location.

Page 51–82

Options Evaluation: Do we build 15, 20, or 25 year requirements?

15-20-25 year population estimates

Municipality 2021 Census 2040 (15 year) 2045 (20 year) 2050 (25 year)
View Royal 11,575 15,641 16,692 17,700
Colwood 18,961 30,312 34,295 38,802
Langford 46,584 91,155 103,133 116,686
Metchosin 5,067 6,535 7,034 7,570
Highlands, Songhees, Esquimalt 4,645 5,734 6,147 6,607
Total population 149,377 167,301 187,365

15-20-25 year facility sizes and costs

Metric 2040 (15 year) 2045 (20 year) 2050 (25 year)
Total population 149,377 167,301 187,365
Total FTE (RCMP + support) 250 281 315
Facility Size 82,431 ft² 92,417 ft² 103,607 ft²
Capital Cost to Redevelop Existing Site $75.3M $82.4M $91.9M

Why build to 2045?

  • Minimum financing term likely 20 years
  • Capacity of the building would ideally meet community requirements to mirror the financing term
  • Construction begins earliest 2023/4 with earliest completion in 2025/6; building to 2045 coincides with 20-year term
  • 15-20% of the space could be leased on 10 to 15-year terms until required by RCMP
  • Construction costs are only increasing; since June 2021, Class D estimate has increased approximately 2.7% ($1.65M for 2045 build)
Page 51–82

Recommendations: Planning the Future West Shore Detachment

  • Redevelop existing site
  • Build to 2045 requirements (20 years)
  • Total gross space required is approximately 92,417 ft²
  • Capital cost to redevelop current site is approximately $82.4M (+/- 25%)
Municipality 50% Population (2021) / 50% Assessment (2021) Difference from 1997 Capital cost contributions
Langford 60.13% +13.75% $49.6M
View Royal 15.56% -2.84% $12.8M
Colwood 24.31% -10.91% $20.1M
Page 51–82