This site is in beta — data may be incomplete and features are still being added.
Advisory Committee/Documents/Geotechnical and Sea Level Rise Report - Ryzuk Geotechnical
Appendix

Geotechnical and Sea Level Rise Report - Ryzuk Geotechnical

April 25, 2017Pages 161–1711 section

Technical report assessing soil conditions, bedrock levels, and flood hazards, specifically recommending a flood construction level for the Christie Point site.

9.a Christie Point Rezoning Application (2861 Craigowen Road)
Date: August 5, 2016Flood Construction Level (FCL): Recommended at +3.3m geodeticSea Level Rise: Assumed 0.80m over 75 years

Technical report assessing soil conditions, bedrock levels, and flood hazards, specifically recommending a flood construction level for the Christie Point site.

Page 161–171

Document Images

(10)
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Extracted from: 2017 04 25 Joint Advisory Committee Meeting Agenda - Agenda - Pdf