This site is in beta — data may be incomplete and features are still being added.

Meeting Documents

April 25, 20171 PDF37 documents extracted

2017 04 25 Joint Advisory Committee Meeting Agenda - Agenda - Pdf

Appendix

Attachment A

Visual rendering of the proposed building massing for the Christie Point redevelopment.

Page 71 key fact
Appendix

Attachment B: UBC Stats for Density

A density comparison chart comparing Town of View Royal and PIPS calculations with UBC standards.

Page 82 key facts
Appendix

Attachment C: Table 1. Summary data adapted from Desbonnet et al.

Technical table regarding the removal effectiveness of pollutants at different buffer widths.

Page 91 key fact
Appendix

Attachment D: Table 1. Land use classification scheme and associated setback distances

Regulatory setback standards from Fisheries and Oceans Canada for various land uses.

Page 101 key fact
Appendix

Attachment E

Photograph illustrating the narrow road buffer of 2.8m from the water.

Page 111 key fact
Appendix

Attachment F

Aerial photograph with annotated measurements of the existing building and site layout.

Page 121 key fact
Appendix

Attachment G: CHRISTIE POINT | LANDSCAPE MASTERPLAN

The proposed landscape master plan map showing restoration zones, community gardens, and trails.

Page 131 key fact
Presentation

PIPS VERBAL PRESENTATION TO C.O.W. February 15th 2017

Notes for a previous verbal presentation by PIPS to the Committee of the Whole opposing the rezoning.

Pages 14–152 key facts
Staff Report

TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE REPORT: REZONING – 2951 CRAIGOWAN ROAD (CHRISTIE POINT)

Staff report providing background, OCP context, and detailed analysis of the Christie Point rezoning application.

Pages 16–455 key facts
Appendix

Subject Property Map 2951 Craigowan Rd (Christie Pt)

Zoning map detail of the Christie Point property and surrounding area.

Page 461 key fact
Appendix

Subject Property Ortho 2951 Craigowan Rd (Christie Pt)

Aerial orthophoto map of the subject property.

Page 471 key fact
Appendix

CHRISTIE POINT COMPREHENSIVE DEVELOPMENT PLAN

Detailed redevelopment proposal document by D'AMBROSIO architecture + urbanism for the Christie Point site.

Pages 48–1055 key facts
Appendix

Appendix B: Christie Point Redevelopment Plan Community and Stakeholder Engagement Summary

Cover page for the community and stakeholder engagement summary report dated December 12, 2016.

Page 1061 key fact
Staff Report

Christie Point Redevelopment Plan | Community and Stakeholder Engagement Summary

A comprehensive summary of the community engagement process conducted by TownSquare Planning Inc. for Realstar regarding the Christie Point redevelopment.

Pages 107–1275 key facts
Appendix

Appendix A: Letters to Esquimalt Nation and Songhees Nation

Correspondence between Realstar and the Chiefs of the Esquimalt and Songhees Nations regarding the redevelopment project and planning principles.

Pages 128–1374 key facts
Appendix

Appendix B: Neighbourhood Open House Comment Form and Post-It Note Feedback

A compilation of feedback received during the September 20, 2016 tenant meeting and the September 22, 2016 neighbourhood open house.

Pages 138–1523 key facts
Appendix

Christie Point Rezoning Application Architectural and Landscape Plans

Site context, plans, project data, and rendered views for the Christie Point redevelopment submitted by D'Ambrosio Architecture + Urbanism.

Pages 153–1595 key facts
Appendix

Appendix C: Technical Reports List

Table of contents for the technical reports accompanying the rezoning application, including geotechnical, arborist, archaeology, and transportation studies.

Page 1602 key facts
Appendix

Geotechnical and Sea Level Rise Report - Ryzuk Geotechnical

Technical report assessing soil conditions, bedrock levels, and flood hazards, specifically recommending a flood construction level for the Christie Point site.

Pages 161–1713 key facts
Appendix

Arborist Review - Talbot MacKenzie and Associates

An assessment of the tree resource on the redevelopment site, providing a complete inventory, protection guidelines, and analysis of construction impacts.

Pages 172–2033 key facts
Appendix

Archaeological Overview Assessment Report - Terra Archaeology

An overview of the archaeological potential of the Christie Point peninsula, identifying documented sites and recommending further field work.

Pages 204–2084 key facts
Other

Archaeological Overview Assessment Report - Christie Point Redevelopment Project

A technical report by Terra Archaeology assessing archaeological potential and documented sites within the redevelopment area.

Pages 209–2183 key facts
Other

Placeholder: 4. Conceptual Servicing Report

A title/placeholder page for the Conceptual Servicing Report by McElhanney.

Page 2191 key fact
Staff Report

CONCEPTUAL SERVICING REPORT for CHRISTIE POINT REDEVELOPMENT

An engineering report by McElhanney assessing the infrastructure requirements, including sanitary sewer, storm water, and water systems for the proposed 473-unit redevelopment.

Pages 220–2295 key facts
Appendix

Appendix A: Site Plan, D’Ambrosio Architecture and Urbanism

Proposed site plans and level-by-level floor plans for the Christie Point redevelopment project.

Pages 230–2313 key facts
Appendix

Appendix B: Sanitary Sewer Calculations

Technical calculations for existing and proposed residential sanitary flows and pipe capacities.

Pages 232–2383 key facts
Appendix

Appendix C: Water Works Calculations

Hydrant curves and fire flow requirement calculations based on the Fire Underwriters Survey (1999).

Pages 239–2412 key facts
Other

Placeholder: 5. Environmental Overview Assessment

A title/placeholder page for the Environmental Overview Assessment report by Swell Environmental Consulting.

Page 2421 key fact
Staff Report

Environmental Overview Assessment for Christie Point, View Royal

A detailed environmental study evaluating terrestrial vegetation, shoreline habitats, and wildlife, particularly birds, within the project area.

Pages 243–2864 key facts
Other

Placeholder: 6. Transportation Impact Assessment

A title/placeholder page for the Transportation Impact Assessment report by Bunt & Associates.

Page 2871 key fact
Staff Report

Christie Point Transportation Impact Assessment Final Report

A report analyzing traffic operations, parking demand, and mitigation measures for the proposed increase from 161 to 473 residential units.

Pages 288–3104 key facts
Staff Report

Christie Point | Transportation Impact Assessment

A technical report by Bunt & Associates evaluating the transportation impacts of the proposed 473-unit Christie Point redevelopment.

Pages 311–3424 key facts
Appendix

APPENDIX A: Traffic Flow Diagrams

Visual diagrams illustrating existing, background, and projected traffic volumes for the Christie Point development area.

Pages 343–3482 key facts
Appendix

APPENDIX C: TAC Signal Warrant

Traffic signal warrant analysis spreadsheets for the Island Highway and Shoreline Drive intersection.

Pages 349–3521 key fact
Staff Report

Christie Point TIA Review

A peer review of the Bunt & Associates TIA conducted by Opus International Consultants for the Town of View Royal.

Pages 353–3594 key facts
Appendix

Appendix A: Site Visit Observations

Field notes from traffic observations conducted at the Island Highway and Admirals Road intersection at various times of day.

Pages 360–3622 key facts
Appendix

Appendix B: Signal Warrant Sensitivity Analysis

Additional traffic signal warrant analysis based on different volume assumptions (June vs. November counts).

Pages 363–3652 key facts