Appendix
SCHEDULE C - TOWN OF VIEW ROYAL CONVERSION CHART
May 14, 2013Page 681 section
Technical conversion chart for soil measurement between bank deposits and stockpiles.
1 Cubic Meter Bank = 1.18 Cubic Meters Stockpile1 Cubic Yard Stockpile = 0.650 Cubic Meter Bank
SCHEDULE C
TOWN OF VIEW ROYAL CONVERSION CHART

| BANK DEPOSIT | STOCK PILE DEPOSIT |
|---|---|
| 1 Cubic Meter | 1.18 Cubic Meters |
| 1 Cubic Meter | 1.54 Cubic Yards |
| 1 Cubic Meter | 2.17 Metric Tonnes |
| STOCK PILE DEPOSIT | BANK DEPOSIT |
| 1 Metric Tonne | 0.462 Cubic Meter |
| 1 Cubic Yard | 0.650 Cubic Meter |
| 1 Cubic Meter | 0.850 Cubic Meter |
Page 68
Extracted from: 2013 05 14 Committee of the Whole Agenda