This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/View Royal Public Safety Building Monthly Report for April 2014
Staff Report

View Royal Public Safety Building Monthly Report for April 2014

May 13, 2014Pages 48–505 sections

Architectural status report on the construction of the View Royal Public Safety Building.

May 8, 2014Tasks: Blasting, rock removal, concrete walls + slabs, structural steelFraming of building and concrete placement in progress

View Royal Public Safety Building

Town of View Royal

Page 48–50

Monthly Report for April 2014

Construction site photograph showing excavation, heavy machinery, and foundation work, captioned "Photo: 2 April 2014"
Construction site photograph showing excavation, heavy machinery, and foundation work, captioned "Photo: 2 April 2014"

Date of report: 8 May 2014

PREPARED FOR:

  • Kim Anema, Chief Administrative Officer, Town of View Royal
  • Paul Hurst, Fire Chief, Emergency Program Coordinator, View Royal Fire Rescue

PREPARED BY:

  • Heather Spinney, Architect AIBC, Hughes Condon Marler Architects

CONTENTS:

Section Page
Introduction 3
Status of Project 3
Work Progress 3
Progress Photographs 4-6
Supplemental Instructions 7
Change Orders / Change Directives 7
Appendix A: Schedule
Page 48–50

INTRODUCTION

This report summarizes the progress and status of the View Royal Public Safety Building up to the end of the month of April 2014.

Page 48–50

STATUS OF PROJECT

2 Construction Coordination Meetings have been conducted.

  • Framing of building + placing of concrete in progress
  • Installation of civil, mechanical & electrical infrastructure in progress.
  • Preparation for installation of roofing membrane in progress
Page 48–50

WORK PROGRESS

Key tasks started, in progress or completed this month include:

  • Additional blasting (upper parking + training ground)
  • Clean Up / Rock Removal (ongoing)
  • Grading
  • Concrete (walls + slabs) + CMU
  • Civil, Mechanical + Electrical Infrastructure
  • Structural Steel
  • TJI Framing + stud framing
  • Installation of roofing membrane started

Refer to the following pages for photographs illustrating the current progress of construction.

Page 48–50