Report to Committee of the Whole

Re: Craigflower Bridge Replacement Project Update May 2014

Meeting Date: May 13th, 2014

Photo of people walking and cycling on a bridge with the caption "EAST SIDE OF BRIDGE OPEN TO PEDESTRIANS AND CYCLISTS"
Photo of people walking and cycling on a bridge with the caption "EAST SIDE OF BRIDGE OPEN TO PEDESTRIANS AND CYCLISTS"
Photo of workers on the ground with the caption "INSTALLING EXPANSION JOINT MATERIAL BETWEEN DECK AND ROADWAY"
Photo of workers on the ground with the caption "INSTALLING EXPANSION JOINT MATERIAL BETWEEN DECK AND ROADWAY"
Photo of a crane removing a structure from the water with the caption "REMOVING TEMPORARY WORK BRIDGE"
Photo of a crane removing a structure from the water with the caption "REMOVING TEMPORARY WORK BRIDGE"

AN OVERVIEW OF CONSTRUCTION PROGRESS IN PHOTOS

Page 132–134