Committee of the Whole/Documents/Location Plans (South and North) - Proposed Christie Point Water Main
Appendix

Location Plans (South and North) - Proposed Christie Point Water Main

June 10, 2014Pages 85–862 sections

Site maps detailing existing underground utilities and the proposed water main alignment.

2. APPROVAL OF AGENDA
Date: April 2014Scale: 1:1000

LOCATION PLAN (SOUTH) - Proposed Christie Point Water Main

Location plan (south) of Craigowan Road showing existing utility lines and Portage Inlet
Location plan (south) of Craigowan Road showing existing utility lines and Portage Inlet

Project Information

  • Client: RIF Consulting Ltd.
  • Project: Proposed Christie Point Water Main
  • Location: Craigowan Road, View Royal, B.C.
  • Engineering Firm: RYZUK GEOTECHNICAL Engineering & Materials Testing
  • Drawn By: JG
  • Date: April 2014
  • Scale: 1:1000
  • Drawing No: 8-6852-1-1

Map Labels

  • Craigowan Road
  • Portage Inlet
  • Existing gas meter/shutoff
  • Part Section 2 Esquimalt District
  • Existing gas line (typ.)
  • Existing underground gas, hydro or communications crossing (typ.)
  • Existing water main (typ.)
  • Bedrock depth anticipated to be approximately 2 m at these locations (deeper elsewhere within road alignment)

Legend

  • --- . --- Existing gas line
  • .............. Existing water main

Notes

  1. This drawing is based upon the Site Survey provided to us by RIF Consulting Ltd.
  2. Locations of existing gas line and water main based upon ground penetrating radar and electromagnetic tracking and are approximate only, their exact locations should be confirmed by contractor prior to any excavation.
  3. Lateral crossing locations based on observed patch on asphalt road and could be either gas, hydro or communications.
  4. Depth of existing gas line was estimated to be roughly 0.6 m for majority of alignment.
  5. Depth of existing water main was estimated to be between 1.2 and 2 m for majority of alignment.
Page 85–86

LOCATION PLAN (NORTH) - Proposed Christie Point Water Main

Location plan (north) of Craigowan Road showing existing utility lines and Portage Inlet
Location plan (north) of Craigowan Road showing existing utility lines and Portage Inlet

Project Information

  • Client: RIF Consulting Ltd.
  • Project: Proposed Christie Point Water Main
  • Location: Craigowan Road, View Royal, B.C.
  • Engineering Firm: RYZUK GEOTECHNICAL Engineering & Materials Testing
  • Drawn By: JG
  • Date: April 2014
  • Scale: 1:1000
  • Drawing No: 8-6852-1-2

Map Labels

  • Craigowan Road
  • Portage Inlet
  • Existing gas line (typ.)
  • Existing underground gas, hydro or communications crossing (typ.)
  • Existing water main (typ.)
  • Part Section 2 Esquimalt District
  • Bedrock depth anticipated to be approximately 2 m at this location (deeper elsewhere within road alignment)

Legend

  • --- . --- Existing gas line
  • .............. Existing water main

Notes

  1. This drawing is based upon the Site Survey provided to us by RIF Consulting Ltd.
  2. Locations of existing gas line and water main based upon ground penetrating radar and electromagnetic tracking and are approximate only, their exact locations should be confirmed by contractor prior to any excavation.
  3. Lateral crossing locations based on observed patch on asphalt road and could be either gas, hydro or communications.
  4. Depth of existing gas line was estimated to be roughly 0.6 m for majority of alignment.
  5. Depth of existing water main was estimated to be between 1.2 and 2 m for majority of alignment.
Page 85–86