This site is in beta — data may be incomplete and features are still being added.

Meeting Documents

June 10, 20141 PDF42 documents extracted

2014 06 10 Committee of the Whole Agenda

Agenda

TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE MEETING AGENDA

Meeting agenda for the Town of View Royal Committee of the Whole on June 10, 2014, listing items for discussion including building reports, capital updates, and development permits.

Pages 1–64 key facts
Minutes

MINUTES OF A COMMITTEE OF THE WHOLE MEETING HELD ON TUESDAY, MAY 13, 2014

Official minutes of the previous Committee of the Whole meeting, documenting approvals of building and bylaw reports, project updates, and committee restructuring discussions.

Pages 7–144 key facts
Form

TOWN OF VIEW ROYAL PETITION & DELEGATION REQUEST FORM

Request by Carolyn Stewart (CRD) to provide a project update regarding the development of the E&N Rail Trail – Humpback Connector.

Page 154 key facts
Staff Report

Protective Services & Community Services Report: BUILDING AND BYLAW ENFORCEMENT REPORT

Monthly update on the operations of the Building and Bylaw Department, covering project reviews, complaints, and revenue generation.

Pages 16–174 key facts
Staff Report

2014 Building Report - MAY

Statistical summary of building permit activity for May 2014, including permit types, construction values, and year-to-date totals.

Pages 18–214 key facts
Staff Report

Town of View Royal SUMMARY OF ANIMAL CONTROL REVENUE RECEIVED YTD 2014

Monthly and year-to-date summary of revenue from animal control services and statistics on impounds and complaints.

Pages 22–233 key facts
Staff Report

View Royal Public Safety Building Monthly Report for May 2014

Construction progress report for the new Public Safety Building, detailing project status, photographs, and budget variances.

Pages 24–354 key facts
Staff Report

Mayor’s Report for the Month of May 2014 (West Shore RCMP)

Summary of RCMP activity in the West Shore area for May 2014, including calls for service statistics and significant files.

Pages 36–404 key facts
Staff Report

TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE REPORT: CAPITAL PROJECT UPDATE

Financial update on the status of approved capital projects for 2014, including expenditures and projected completion dates.

Pages 41–424 key facts
Staff Report

TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE REPORT: CAO UPDATE

High-level administrative update from the CAO regarding various department activities, from archives to engineering.

Pages 43–454 key facts
Staff Report

TOWN OF VIEW ROYAL FINANCE & ADMINISTRATION REPORT: ADVISORY COMMITTEE STRUCTURE REVIEW & REVITALIZATION

Report proposing changes to the advisory committee structure to shift focus toward a task-oriented approach and improve efficiency.

Pages 46–534 key facts
Appendix

Attachment A - ADVISORY COMMITTEE STRUCTURE REVIEW & REVITALIZATION (May 5, 2014)

A previous report summarizing findings on committee structures from other municipalities and outlining potential revitalization options.

Pages 54–623 key facts
Appendix

Attachment B - TOWN OF SIDNEY Community Development Committee (CDC) Terms of Reference

Example terms of reference for the Town of Sidney's Community Development Committee, used as a reference for restructuring View Royal's committees.

Pages 63–653 key facts
Minutes

MINUTES OF THE JOINT ADVISORY COMMITTEE MEETING HELD TUESDAY, MAY 27, 2014

Minutes from a joint workshop between Council and Advisory Committees to discuss restructuring and revitalization opportunities.

Pages 66–673 key facts
Minutes

MINUTES OF THE PARKS, RECREATION & ENVIRONMENT ADVISORY COMMITTEE MEETING HELD TUESDAY, MAY 27, 2014

Regular committee meeting minutes covering updates on Welland Legacy Park, trail mock-ups, and the E&N Rail Trail fencing.

Pages 68–703 key facts
Staff Report

TOWN OF VIEW ROYAL COMMITTEE OF THE WHOLE REPORT: ENVIRONMENTAL DEVELOPMENT PERMIT 2951 CRAIGOWAN RD (CHRISTIE POINT)

Application for an environmental development permit to install approximately 750m of 250mm water main at Christie Point.

Pages 71–734 key facts
Appendix

Subject Property Map - 2951 Craigowan (Christie Point)

Geographic map showing the location of the subject property at 2951 Craigowan Road.

Page 741 key fact
Appendix

Subject Property Orthophoto - 2951 Craigowan

Aerial photograph with parcel boundaries for the Christie Point property.

Page 751 key fact
Correspondence

Correspondence from RIF Consulting Ltd. re: Development Permit Application (2951 Craigowan)

Letter from the applicant's consultant explaining the need for the water main upgrade to meet fire protection requirements.

Pages 76–783 key facts
Appendix

Water Main Profile - Station 0+558 to Station 0+880 (2951 Craigowan Road)

Engineering profile drawings showing the planned route and elevation of the new water main.

Pages 79–803 key facts
Appendix

Ryzuk Geotechnical Report - Proposed Christie Point Water Main

Geotechnical investigation of subsurface soil conditions and recommendations for excavation and pipe bedding.

Pages 81–843 key facts
Appendix

Location Plans (South and North) - Proposed Christie Point Water Main

Site maps detailing existing underground utilities and the proposed water main alignment.

Pages 85–862 key facts
Appendix

Environmental Protection Plan - 2951 Craigowan Road Water Main Upgrade

Comprehensive document outlining environmental management strategies to minimize impacts during construction, including spill prevention and erosion control.

Pages 87–1093 key facts
Appendix

Develop with Care 2012 Fact Sheet #4 - Public Works

Provincial environmental guidelines for public works to minimize impacts on the natural environment during maintenance and development.

Pages 110–1122 key facts
Appendix

On-Site Works Location Plan (2951 Craigowan Road)

Overview plan identifying the site for the water distribution system upgrade.

Page 1132 key facts
Appendix

Water Main Profile and Erosion and Sediment Control Details

Detailed engineering drawings for sediment control measures and water main profiles.

Pages 114–1172 key facts
Bylaw

Noise Control Bylaw, 2003, No. 523

Municipal bylaw regulating and prohibiting noise, nuisance, or sounds within View Royal.

Pages 118–1212 key facts
Form

Town of View Royal Project Sustainability Checklist (2951 Craigowan Road)

A completed checklist evaluating the project's economic, environmental, and social sustainability components.

Pages 122–1282 key facts
Staff Report

TOWN OF VIEW ROYAL PLANNING AND DEVELOPMENT REPORT: DEVELOPMENT VARIANCE PERMIT 2014/03 - 2429 Chilco Road

Report requesting variances for road right-of-way widths for Cheam Road and Chilco Road to allow for a more site-sensitive layout.

Pages 129–1324 key facts
Appendix

Attachment 1 - Location Map (2429 Chilco Road)

Plan showing the subject property at Chilco Road and surrounding developments.

Pages 133–1341 key fact
Appendix

Attachment 2 - Concept Plan (Thetis Vale Phase 6)

Engineering concept plan for drainage and site layout of Thetis Vale Phase 6.

Pages 135–1362 key facts
Staff Report

TOWN OF VIEW ROYAL PLANNING AND DEVELOPMENT REPORT: ENVIRONMENTAL DEVELOPMENT PERMIT APPLICATION 2014/04 - 237 Anya Lane

Application to amend a development permit to allow a boulder retaining wall that was constructed without prior Town consultation.

Pages 137–1424 key facts
Appendix

Attachment 1 - Location Plan (237 Anya Lane)

Map identifying the property boundaries at 237 Anya Lane.

Page 1431 key fact
Correspondence

Attachment 2 - Letter from Charmaine & Dave Cung (237 Anya Lane)

Letter from the property owners explaining the necessity of the retaining wall for home stabilization and machinery access.

Page 1442 key facts
Appendix

Attachment 3 - Section 219 Covenant (Christopher Developments Inc. / Town of View Royal)

Legal document establishing a conservation covenant to preserve lands within 15 meters of the natural boundary of Millstream Creek.

Pages 145–1502 key facts
Appendix

Attachment 4 - Restoration and compensation for construction damage at 237 Anya Lane (Swell Environmental)

Report assessing damage to understory vegetation and proposing a restoration plan for the lower field area.

Pages 151–1553 key facts
Appendix

Attachment 5 - Tree Impact Review for 237 Anya Lane (Talbot Mackenzie & Associates)

Arborist review of impacts to trees resulting from the recent encroachment and driveway grading.

Pages 156–1583 key facts
Appendix

Attachment 6 - Tree impact review for 237 Anya Lane (Talbot Mackenzie & Associates)

Follow-up arborist memo noting visible changes in the health of four Big Leaf maple trees due to fill soils.

Pages 159–1603 key facts
Appendix

Attachment 7 - 237 Anya Lane Tree Damage Assessment Report (Michael Gye & Heidi Krogstad Urban Forestry Ltd.)

Detailed arborist assessment of five trees adjacent to the driveway and retaining wall, concluding that fill will have significant impacts on their lifespan.

Pages 161–1653 key facts
Staff Report

TOWN OF VIEW ROYAL COW REPORT: Regional Sustainability Strategy

Update on the emerging Regional Sustainability Strategy policy issue in the Chilco/Mill Hill area.

Pages 166–1683 key facts
Staff Report

TOWN OF VIEW ROYAL Public Works & Transportation Report: Update timeline for the Subdivision and Development Servicing Bylaw

Update on the process to revise the outdated subdivision servicing bylaw, including project schedule and upcoming open house.

Pages 172–1743 key facts
Minutes

MINUTES OF THE TRANSPORTATION ADVISORY COMMITTEE MEETING HELD TUESDAY, MAY 27, 2014

Committee minutes detailing discussions on traffic calming, pedestrian safety at Watkiss Way, and regional transportation investment.

Pages 175–1783 key facts