This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Attachment 2 - Concept Plan (Thetis Vale Phase 6)
Appendix

Attachment 2 - Concept Plan (Thetis Vale Phase 6)

June 10, 2014Pages 135–1361 section

Engineering concept plan for drainage and site layout of Thetis Vale Phase 6.

2. APPROVAL OF AGENDA
Project No. 20132450Scale: 1:500

THETIS VALE PHASE 6 - OVERALL SITE PLAN CONCEPTUAL DRAINAGE

Engineering drawing titled "OVERALL SITE PLAN CONCEPTUAL DRAINAGE" for Thetis Vale Phase 6, including a topographical site map with lot layouts 1-21 and an elevation chart labeled "SECTION B-B"
Engineering drawing titled "OVERALL SITE PLAN CONCEPTUAL DRAINAGE" for Thetis Vale Phase 6, including a topographical site map with lot layouts 1-21 and an elevation chart labeled "SECTION B-B"

Project Information

  • Project No.: 20132450
  • Scale: 1:500
  • Drawn: DAH
  • Designed: DAH
  • Project: THETIS VALE PHASE 6
  • Client: LIMONA CONSTRUCTION
  • Drawing Title: OVERALL SITE PLAN CONCEPTUAL DRAINAGE
  • Drawing Number: 2450-00-FG.102
  • Revision: A
  • Status: PRELIMINARY NOT FOR CONSTRUCTION - DRAFT

Volume Calculations

VOLUME - FEE SIMPLE REGION ONLY

  • 10700 m³ CUT
  • 16500 m³ FILL

Drawing Notes and Features

  • SECTION B-B: Elevation profile chart showing vertical grades from stations 3+000 to 3+160.
  • HWY OFFRAMP: Roadway identified along the northern property boundary.
  • Inlet Headwall: Multiple drainage entry points marked on the plan.
  • Remove Headwall & Extend Pipe: Construction instruction at the eastern edge of the site.
  • Wall Height (S.1): Reference markers for planned wall heights.
  • Approx. Extent of Concrete-Infilled Wall (Typ): Indicated along the highway offramp.
  • Alternate 1:1 Stacked Boulder Wall: Specification for wall construction with a 1.5m bench when height exceeds 3.5m.

THIS PAGE INTENTIONALLY LEFT BLANK

Page containing the centered text "THIS PAGE INTENTIONALLY LEFT BLANK"
Page containing the centered text "THIS PAGE INTENTIONALLY LEFT BLANK"
Page 135–136
Extracted from: 2014 06 10 Committee of the Whole Agenda