Committee of the Whole/Documents/Grading Plan - Thetis Vale Phase 6
Appendix

Grading Plan - Thetis Vale Phase 6

May 12, 2015Pages 102–1031 section

Engineering drawing showing proposed site elevations, slopes, and boulder wall locations.

9.2.3 a Mixed Residential Form and Character Development Permit No. 2014/10 - 2429 Chilco Road Lot 20 (Thetis Vale Phase 6 - 16 Duplex Residential Units)
Drawing Number 2450-00-C.107Notes boulder walls for grade transition

Grading Plan - Thetis Vale Phase 6

Detailed grading plan for Thetis Vale Phase 6, showing residential lot layouts for townhouses and single-family homes, road networks (Chean Road, Chilco Road, Townhouse North, Townhouse East), elevation contours, and designated green spaces.
Detailed grading plan for Thetis Vale Phase 6, showing residential lot layouts for townhouses and single-family homes, road networks (Chean Road, Chilco Road, Townhouse North, Townhouse East), elevation contours, and designated green spaces.

Project Information

  • Project: Thetis Vale Phase 6
  • Drawing Title: Grading Plan
  • Project No.: 20132450
  • Scale: 1:500
  • Drawn by: DAH
  • Designed by: DAH
  • Client: Limona Construction
  • Drawing Number: 2450-00-C.107
  • Revision: E
  • Sheet: 8 of 13
  • Status: PRELIMINARY NOT FOR CONSTRUCTION DRAFT

Legend

  • Minimum limit of lot grading
  • Boulder wall limits
  • 40.8 Underside of footing elevation (Cut)
  • 40.8 Underside of footing elevation (Fill)
  • 44.1 Garage elevation (Townhomes)
  • 39.18 / (40.25) Proposed grade & road centerline
  • (45.9) Lot pad excavation elevation

Revisions

NO. DATE ENG. BY SUBJECT
E MAR 30, 2015 DD DAH ISSUED FOR FINAL APPROVAL
D JAN 12, 2015 DD DAH RE-ISSUED FOR APPROVAL
C AUG 1, 2014 DD DAH RE-ISSUED FOR APPROVAL
B APR 18, 2014 DD DAH ISSUED FOR APPROVAL
A MAR 3, 2014 DD DAH ISSUED FOR REVIEW

General Notes

  • Ditch invert in this area to be raised to same elevation of ditch invert at elevation highest point to be below 40.0m.
  • For cuts over 6m, a shelf is to be constructed under the direction of the geotechnical engineer.
  • Geotech engineer to certify all rock cuts and mortared boulder-stacked walls.
  • NOTE: Erosion and sediment control to be monitored by project biologist.
  • See sheet C-108 for gutter grading details.
  • Site location is indicated with a red arrow.

Designated Areas and Roads

  • Roads: Townhouse North, Townhouse East, Chean Road, Chilco Road, Six Mile Exit Ramp.
  • Green Space Areas:
    • 0.20 ha
    • 0.02 ha
    • 0.11 ha
    • 0.06 ha
    • 0.07 ha
    • 0.07 ha
    • 0.13 ha
Document page containing the text "THIS PAGE INTENTIONALLY LEFT BLANK".
Document page containing the text "THIS PAGE INTENTIONALLY LEFT BLANK".

THIS PAGE INTENTIONALLY LEFT BLANK

Page 102–103
Extracted from: 2015 05 12 Committee of the Whole Agenda