This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/West Shore Parks and Recreation Society Major Repairs and Maintenance
Appendix

West Shore Parks and Recreation Society Major Repairs and Maintenance

January 13, 2015Pages 54–563 sections

Projected capital maintenance and equipment replacement costs for 2015-2019.

6.2.3 b) West Shore Parks and Recreation Society 2015 Budget
Total 2015 Building/Park maintenance: $576,500Total 2015 Equipment replacement: $130,000

Major Repairs & Maintenance

Major Repairs & Maintenance title page
Major Repairs & Maintenance title page
Page 54–56

West Shore Parks and Recreation Society Major Repairs and Maintenance For the Budget Year 2015

Major Site Repairs & Maintenance (01.11.28.300.7120)

Major Site Repairs & Maintenance 2015 2016 2017 2018 2019 Five Year Total
Administration Office - AHU 496,500 536,000 430,000 230,000 330,000 2,022,500
"Q" Centre Water Tanks 40,000 30,000
Clubhouse Hot Water Tank 30,000 30,000
Clubhouse Floors 15,000 15,000
Curling Rink Compressor Rebuild 210,000 210,000
Fieldhouse Air Handling Unit 45,000 45,000
Fieldhouse Flooring Lobby and Pro Shop 20,000 20,000
Fieldhouse Hot Water Tank 6,000 6,000
JDF Arena Floor 300,000 300,000
JDF Electrical Room Upgrade 43,500 43,500
JDF Heat Reclaim 373,000 373,000
JDF Multi Purpose Room Roof 40,000 40,000
JDF Multi Purpose Room Windows 10,000 10,000
JDF Partitions and Countertops 50,000 50,000
JDF Reception AHU 20,000 20,000
JDF Weightroom AHU 30,000 30,000
JDF Tunnel AHU
Pool Changeroom Air Handling 25,000 25,000
Pool Liner (lengths pool) 150,000 150,000
Pool Office AHU 15,000 15,000
Seniors Bldg. Air Handling Unit
"Q" Centre Railings
Front Sign Replacement 30,000 30,000
Main Pool UV 30,000 30,000
Radio Repeater and Upgrade 60,000 60,000
Brine Heater Heat Exchanger 120,000 120,000
"Q" Centre Cooling Tower 120,000 120,000
JDF Cooling Tower 20,000 20,000
DOC Upgrade 100,000 100,000
Hot Tub Filter 20,000 50,000 70,000
Tots Pool filter 50,000 50,000
Main Pool Filter

Parks Major Maintenance (01.11.28.310.7120)

Parks Major Maintenance 2015 2016 2017 2018 2019 Five Year Total
Belmont Lacrosse Box Chain Link 80,000 59,000 95,000 215,000 55,000 504,000
Diamonds Irrigation 40,000 40,000
Field Washroom Roof 20,000 20,000
JDF Lacrosse Box (Board Replacement) 4,000 4,000
Roadway Repair 45,000 45,000 45,000 45,000 45,000 225,000
Sign LED Front 160,000 160,000
Signage 10,000 10,000 10,000 10,000 10,000 50,000
TOTALS FOR BUILDING AND PARKS MAINTENANCE 576,500 595,000 525,000 445,000 385,000 2,526,500
Table showing detailed Major Site and Parks Repairs & Maintenance budget for 2015-2019
Table showing detailed Major Site and Parks Repairs & Maintenance budget for 2015-2019
Page 54–56

West Shore Parks and Recreation Society Major Repairs and Maintenance For the Budget Year 2015

Vehicle Replacement fund (01.50.29.211.7180)

Vehicle Replacement fund 2015 2016 2017 2018 2019 Five Year Total
ADMINISTRATION 139,000 134,000 149,000 138,000 142,000 702,000
Blue Bird School Bus 70,000 70,000
12 Passenger Van 30,000 30,000
MAINTENANCE
Ice Edger, Old
Ice Edger, New 5,000 5,000
Ice Scraper 11,000 11,000
Zamboni 110,000 110,000
Gator JD (4X2)
Toro Eman 15,000 15,000
Forklift 5000lb
Floor Machine (JDF) 20,000 20,000
Floor Machine ("Q") 20,000 20,000
GOLF COURSE & LAWN BOWLS
Gator JD 6X4 12,000 12,000 24,000
Bowls Mower
Bowls Mower
Toro Pro Pass 35,000 35,000
Toro Walk Behind Aerator 30,000 30,000
Toro Workman 25,000 25,000
Core Harvester 7,000 7,000
Greens Ride on Toro 32,000 32,000
PARKS
Toro 4500 75,000 75,000
John Deere Front Deck Rotary 38,000 38,000
Toro Workman Lightduty 12,000 12,000
Push Mower 2,000 2,000
Pressure Washer 2,000 2,000
Pressure Washer Portable 4,000 15,000 19,000
Backhoe Snow Plow 3,000 3,000
Toro Workman light duty 25,000 25,000
Fertilizer Spreader 8,000 8,000
Deep Tine Aerator 32,000 32,000
Ty-Crop Top Dresser 40,000 40,000
Toro Workman light duty 12,000 12,000

Equipment Replacement (01.11.28.320.7120)

Small Equipment Replacement 2015 2016 2017 2018 2019 Five Year Total
Small Equipment Replacement 130,000 110,000 110,000 110,000 110,000 570,000
EQUIPMENT REPLACEMENT 130,000 110,000 110,000 110,000 110,000 570,000

Grand Totals

2015 2016 2017 2018 2019 Five Year Total
TOTAL MAJOR SITE REPAIRS AND MAINTENANCE 496,500 536,000 430,000 230,000 330,000 2,022,500
TOTAL PARKS MAJOR MAINTENANCE 80,000 59,000 95,000 215,000 55,000 504,000
TOTAL VEHICLES REPLACMENT 139,000 134,000 149,000 138,000 142,000 702,000
TOTAL EQUIPMENT REPLACEMENT 130,000 110,000 110,000 110,000 110,000 570,000
GRAND TOTALS 845,500 839,000 784,000 693,000 637,000 3,548,228
Table showing Vehicle and Equipment Replacement budget for 2015-2019 and Grand Totals summary
Table showing Vehicle and Equipment Replacement budget for 2015-2019 and Grand Totals summary
Page 54–56
Extracted from: 2015 01 13 Committee of the Whole Agenda