This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Appendix VI – Replacement Tree Summary
Appendix

Appendix VI – Replacement Tree Summary

March 11, 2025Page 601 section

A summary table calculating the required tree replacements and cash-in-lieu contributions for the 4 Helmcken Road site.

1 CALL TO ORDER
5 protected trees removed onsite10 replacement trees proposed$700 per replacement tree cash-in-lieu

Appendix VI – Replacement Tree Summary

Onsite Minimum replacement tree requirement Count Multiplier Total
A. Protected trees removed onsite 5 X 1 5
B. Replacement trees proposed based on bylaw requirement (2:1 replacement requirement as per bylaw) 5 X 2 10
C. Replacement trees to be planted TBD X1 TBD
D. On site replacement tree deficit (B-C) Record 0 if negative N/A N/A TBD
E. Protected trees removed off-site 0 X 1 0
F. Off-site replacement trees required (2:1 replacement requirement as per bylaw) 0 X 2 0
G. Offsite replacement trees to be planted 0 X1 0
H. Off-site replacement tree deficit (F-G) Record 0 if negative N/A N/A 0
I. On site trees proposed for cash-in-lieu ($700 per replacement tree) N/A N/A TBD
J. Off-site trees proposed for cash-in-lieu ($700 per replacement tree) N/A N/A 0
K Cash-in-lieu proposed (I + J) x $700. N/A N/A TBD
Page 60
Extracted from: 2025 03 11 Committee of the Whole Agenda - Agenda - Pdf