This site is in beta — data may be incomplete and features are still being added.

Meeting Documents

March 11, 20251 PDF45 documents extracted

2025 03 11 Committee of the Whole Agenda - Agenda - Pdf

Minutes

TOWN OF VIEW ROYAL MINUTES OF A COMMITTEE OF THE WHOLE MEETING HELD ON TUESDAY, FEBRUARY 11, 2025

Official minutes from the February 11, 2025 Committee of the Whole meeting, recording discussions and resolutions on various development permits and town business.

Pages 5–104 key facts
Staff Report

COMMITTEE OF THE WHOLE REPORT: DEVELOPMENT VARIANCE PERMIT 2024-03 – 2401 BURNSIDE ROAD WEST (BC TRANSIT)

Staff report analyzing a request for sign variances at the BC Transit handyDART Centre to increase maximum sign heights and character sizes.

Pages 11–154 key facts
Appendix

Attachment 1: Priority Permits Letter to Mayor and Council

A letter from the applicant's agent justifying the requested sign variances based on visibility from the highway and architectural integration.

Pages 16–174 key facts
Appendix

Attachment 2: BC Transit, 2401 Burnside Road, View Royal BC Complete Set of Permit Drawings

Site plans and elevation drawings showing the proposed locations and dimensions of Sign 2 and Sign 3 at the BC Transit facility.

Pages 18–214 key facts
Presentation

Presentation: DEVELOPMENT VARIANCE PERMIT 2024-03 – 2401 Burnside Rd W (BC Transit)

A slide deck summary of the development variance permit application for the BC Transit facility signs.

Pages 22–283 key facts
Staff Report

COMMITTEE OF THE WHOLE REPORT: DEVELOPMENT PERMIT NO. 2024-06 – 4 HELMCKEN ROAD (SSMUH)

Staff report recommending a development permit for a four-unit small-scale multi-unit housing project at 4 Helmcken Road.

Pages 29–315 key facts
Staff Report

Report to Committee of the Whole Re: DP 2024-06 – 4 Helmcken Rd

Concluding page of a staff report for Development Permit No. 2024-06, including administrative concurrence and a list of attachments related to the 4 Helmcken Road project.

Page 323 key facts
Correspondence

Re: Development Permit Application for Fourplex at 4 Helmcken Road

A letter from XY Ventures LTD to the Mayor and Council proposing a fourplex development at 4 Helmcken Road that supports local essential workers and seniors.

Pages 33–344 key facts
Appendix

Proposed Houseplex for XY Ventures, Ltd. 4 Helmcken Road (Architectural Plans)

Architectural design package for a 4-unit houseplex, including site plans, site sections, floor plans, and building elevations.

Pages 35–386 key facts
Appendix

Landscape Plan - 4-Plex Development 4 Helmcken Road

Detailed landscape architectural plans including planting schedules, shrub distribution, and site construction details for the development.

Pages 39–414 key facts
Appendix

4 Helmcken Road Tree Protection Plan

A comprehensive tree inventory and protection plan assessing the impact of development on site trees and specifying mitigation measures.

Pages 42–586 key facts
Appendix

4 Helmcken Road Victoria, BC V8Z 5G5 Tree Protection Plan

Technical document excerpt defining Protected Root Zones (PRZ) and Off-site (OS) tree designations for the 4 Helmcken Road development.

Page 593 key facts
Appendix

Appendix VI – Replacement Tree Summary

A summary table calculating the required tree replacements and cash-in-lieu contributions for the 4 Helmcken Road site.

Page 603 key facts
Appendix

Appendix VII – Additional Photographs

Visual documentation of various trees and their aspects located at the 4 Helmcken Road property.

Pages 61–642 key facts
Appendix

Appendix VIII – Additional Information

A brief note regarding version history for the arborist report related to 4 Helmcken Road.

Page 651 key fact
Appendix

Appendix IX - Assumptions and Limiting Conditions

Standard arborist report disclosures regarding data sources, legal descriptions, and limitations of the findings.

Page 661 key fact
Form

Appendix X - Certificate of Performance

Signed certification by a qualified arborist regarding his independence and professional assessment of the property's trees.

Page 673 key facts
Appendix

Attachment 5 - 4 Helmcken Road Development: Site Plan, General Notes, & Drawing List

Engineering drawing sheet C01 containing general project notes, drawing indexes, and a topographic site map.

Page 683 key facts
Appendix

Conrad Road Improvements

Engineering drawing sheet C02 showing details for proposed road improvements and site access.

Page 691 key fact
Appendix

Onsite Grading

Engineering drawing sheet C03 detailing the proposed grading plan for the houseplex structures.

Page 702 key facts
Appendix

Onsite Services

Engineering drawing sheet C04 detailing sewer, water, and gas utility connections for the development site.

Page 712 key facts
Appendix

Attachment 6 – Zoning Review for 4 Helmcken Road (SSMUH)

A technical review comparing the proposed houseplex development at 4 Helmcken Road against R-1B zoning requirements.

Pages 72–733 key facts
Presentation

Presentation: Development Permit 2024-06 – 4 Helmcken Rd (SSMUH)

Visual slide deck for the Committee of the Whole meeting illustrating site plans, elevations, and staff recommendations for the proposed development.

Pages 74–823 key facts
Staff Report

Staff Report: Development Permit with Variances Application No. 2024-03 – 294, 296 Eltham Road and 242 Helmcken Road

Report recommending council authorize a development permit for five blocks of three-storey townhouses (20 total units) with variances for height and aisle width.

Pages 83–855 key facts
Staff Report

Staff Report: Development Permit with Variances Application No. 2024-03 - 294, 296 Eltham Road and 242 Helmcken Road

A staff report evaluating a proposed 20-unit townhouse project, recommending approval with variances for building height, manoeuvring aisle width, and accessory structure siting.

Pages 86–915 key facts
Appendix

Attachment 1. Subject properties

An aerial location map showing the subject properties at the corner of Eltham Road and Helmcken Road.

Page 922 key facts
Correspondence

Letter from Ankenman Marchand Architects re: Development Permit application for The Pebbles

A cover letter from the project architects submitting the formal development permit application and supporting documentation for 'The Pebbles' townhouse project.

Pages 93–944 key facts
Appendix

Attachment 3. Architectural Plans - The Pebbles

A comprehensive set of architectural drawings including site plans, floor plans, elevations, sections, and shadow studies for 'The Pebbles' development.

Pages 95–1125 key facts
Appendix

Architectural Plans: Sections, 3D Representations, and Area Plans (Attachment 3)

Architectural set for the proposed townhouse development at Eltham and Helmcken Road, including building sections, visual renderings, and unit area breakdowns.

Pages 113–1155 key facts
Appendix

Landscape Plan (Attachment 4)

Detailed landscape design plan showing outdoor amenity spaces, visitor bicycle parking, and site access for the Eltham & Helmcken project.

Page 1164 key facts
Appendix

Arborist Report and Tree Management Plan (Attachment 5)

A consultant report and technical drawing evaluating tree impacts and defining protection measures for construction.

Pages 117–1246 key facts
Appendix

Preliminary Servicing Plan (Attachment 6)

Engineering drawing showing the proposed layout for water, sanitary sewer, and storm drainage infrastructure.

Page 1253 key facts
Form

Project Sustainability Checklist (Attachment 7)

Completed municipal checklist detailing the environmental, economic, and social sustainability features of the proposed development.

Pages 126–1335 key facts
Staff Report

Development Permit Area Guidelines - Review (Attachment 8)

Staff analysis evaluating the project's consistency with the Town's Mixed Residential Development Permit Area design guidelines.

Pages 134–1394 key facts
Appendix

Attachment 8: Mixed Residential DPA review (294, 296 Eltham Road)

A review document evaluating a development proposal against the Town's Development Permit Area (DPA) guidelines for energy efficiency and signage.

Page 1403 key facts
Appendix

Attachment 9: Zoning Review - CD-29: Comprehensive Development (Eltham Road Townhouse)

A detailed comparison of zoning regulations against the proposed 20-unit townhouse development, highlighting where variances are required.

Pages 141–1424 key facts
Presentation

Presentation: DEVELOPMENT PERMIT 2024-03 - 294, 296 Eltham Road and 242 Helmcken Road

A presentation deck outlining the development application for 20 townhouse units, including site plans, elevations, and specific variance requests.

Pages 143–1514 key facts
Staff Report

Staff Report: Financial Plan Insights 2025-2029

A comprehensive report from the Chief Administrative Officer providing context and data for the upcoming 2025-2029 Financial Plan and budget development.

Pages 152–1665 key facts
Staff Report

Staff Report: Financial Plan Insights 2025-2029 (Asset Management)

A section of the Financial Plan Insights report detailing asset management strategies and the Sustainable Infrastructure Replacement (SIR) Plan for infrastructure renewal.

Page 1674 key facts
Staff Report

Staff Report: CAO Update

A comprehensive report from the Chief Administrative Officer providing highlights on significant activities across municipal departments including administration, finance, engineering, and parks.

Pages 168–1745 key facts
Staff Report

Staff Report: Helmcken Road at Watkiss Way Intersection Protection Measures

A report seeking approval for the installation of a 'quick build traffic calming curb' at the northeast corner of the Helmcken Road and Watkiss Way intersection to improve safety for cyclists.

Pages 175–1794 key facts
Appendix

Appendix: Helmcken Road Intersection Design Drawings

Detailed engineering design drawings for Helmcken Road intersection improvements (Drawing set 34046, Sheets 4-6).

Pages 180–1823 key facts
Staff Report

Staff Report: Helmcken Road/Watkiss Way Intersection Improvement Options

A background report (originally from May 2024) analyzing multiple concept options to balance traffic flow and active transportation needs at the Helmcken and Watkiss intersection.

Pages 183–1894 key facts
Appendix

Appendix: Watkiss Way and Helmcken Rd Intersection Review Options

Concept drawings illustrating three distinct improvement options (C01, C02, and C03) for the Helmcken and Watkiss intersection review.

Pages 190–1924 key facts
Staff Report

Staff Report: Building Department Report for February 2025

A statistical summary of building and plumbing permit activity for the month of February 2025, including construction values and revenue.

Page 1934 key facts