Conrad Road Improvements

March 11, 2025Page 691 section

Engineering drawing sheet C02 showing details for proposed road improvements and site access.

1 CALL TO ORDER
Drawing No. 24-167-C02

CONARD ROAD IMPROVEMENTS

TOWN OF VIEW ROYAL

Project: XY VENTURES, 4 HELMCKEN ROAD, LANGFORD, BRITISH COLUMBIA Status: ISSUED FOR DEVELOPMENT PERMIT Date: 30/08/24 Drawing Number: 24-167-C02 Sheet: 2 of 4

Project Information

  • Engineering Firm: Pacific Vista Consulting Ltd., 3111 Woodpark Drive, Victoria, BC V9C 1P2 (Telephone: 250-516-4143)
  • Pacific Vista Project No.: 24-167
  • Town of View Royal File No.: SUB21-006
  • Elevation: 27.652
  • Scales: Horizontal 1:100, Vertical 1:20

Revisions

REV DESCRIPTION DATE (DD-MM-YY) BY
1 ISSUED FOR DEVELOPMENT PERMIT 30/08/24 RBJ

Legend - Proposed Services Shown Dashed

Symbol Description Symbol Description Symbol Description
W WATER C CURB EXISTING U/G UTIL.
D DRAIN S/W SIDEWALK PROPOSED U/G UTIL.
DITCH EDGE PAVE. LIGHT STANDARD
SEWER BUSHLINE POWER POLE
G GAS TREE ANCHOR
MANHOLE HYDRANT REDUCER
CLEANOUT VALVE CAP
CATCHBASIN FLUSH VALVE CULVERT
SILTRAP AIR VALVE HEADWALL
CONC. BOX METER ROAD SIGN
MONUMENT LOT PIN LEAD PLUG

Plan and Profile Views

Construction Notes and Technical Specifications

  • Drainage: Existing 200ø drain shown approx. Contractor to verify location and elevation prior to construction.
  • Service Connection: Contractor to install new 150mm PVC service with inspection chamber at PL (Property Line).
  • Asphalt Transition: Sawcut along entire length of proposed curb and asphalt transition min. 1.0m from edge of existing asphalt.
  • Utility Verification: Contractor to confirm location and depth of G/S main prior to construction. Consult Fortis BC on findings.
  • Existing Conditions Note: The location and elevation of existing underground services on this drawing may not be accurate or complete. The actual horizontal and vertical locations must be confirmed by utility companies and the contractor prior to the start of any excavations.

Construction Details

  • Surface: 50mm of new asphalt to match existing grade.
  • Sidewalk: 1.5m sidewalk, 100mm thick brushed finish concrete.
  • Base: 100mm of 20mm minus granular base compacted to 95% Modified Proctor Density.
  • Sub-base: 250mm of 80mm minus granular sub-base compacted to 95% M.P.D.
  • Topsoil: 200mm of topsoil and grass seed.