Appendix
Conrad Road Improvements
March 11, 2025Page 691 section
Engineering drawing sheet C02 showing details for proposed road improvements and site access.
Drawing No. 24-167-C02
CONARD ROAD IMPROVEMENTS
TOWN OF VIEW ROYAL
Project: XY VENTURES, 4 HELMCKEN ROAD, LANGFORD, BRITISH COLUMBIA Status: ISSUED FOR DEVELOPMENT PERMIT Date: 30/08/24 Drawing Number: 24-167-C02 Sheet: 2 of 4
Project Information
- Engineering Firm: Pacific Vista Consulting Ltd., 3111 Woodpark Drive, Victoria, BC V9C 1P2 (Telephone: 250-516-4143)
- Pacific Vista Project No.: 24-167
- Town of View Royal File No.: SUB21-006
- Elevation: 27.652
- Scales: Horizontal 1:100, Vertical 1:20
Revisions
| REV | DESCRIPTION | DATE (DD-MM-YY) | BY |
|---|---|---|---|
| 1 | ISSUED FOR DEVELOPMENT PERMIT | 30/08/24 | RBJ |
Legend - Proposed Services Shown Dashed
| Symbol | Description | Symbol | Description | Symbol | Description |
|---|---|---|---|---|---|
| W | WATER | C | CURB | — | EXISTING U/G UTIL. |
| D | DRAIN | S/W | SIDEWALK | — | PROPOSED U/G UTIL. |
| — | DITCH | — | EDGE PAVE. | — | LIGHT STANDARD |
| — | SEWER | — | BUSHLINE | — | POWER POLE |
| G | GAS | — | TREE | — | ANCHOR |
| ◯ | MANHOLE | ⬗ | HYDRANT | — | REDUCER |
| □ | CLEANOUT | ⋈ | VALVE | — | CAP |
| ☒ | CATCHBASIN | ⊗ | FLUSH VALVE | — | CULVERT |
| ⧄ | SILTRAP | ⊕ | AIR VALVE | ⊖ | HEADWALL |
| ⧇ | CONC. BOX | ⊚ | METER | ⌂ | ROAD SIGN |
| ◈ | MONUMENT | ● | LOT PIN | ◒ | LEAD PLUG |
Plan and Profile Views
Construction Notes and Technical Specifications
- Drainage: Existing 200ø drain shown approx. Contractor to verify location and elevation prior to construction.
- Service Connection: Contractor to install new 150mm PVC service with inspection chamber at PL (Property Line).
- Asphalt Transition: Sawcut along entire length of proposed curb and asphalt transition min. 1.0m from edge of existing asphalt.
- Utility Verification: Contractor to confirm location and depth of G/S main prior to construction. Consult Fortis BC on findings.
- Existing Conditions Note: The location and elevation of existing underground services on this drawing may not be accurate or complete. The actual horizontal and vertical locations must be confirmed by utility companies and the contractor prior to the start of any excavations.
Construction Details
- Surface: 50mm of new asphalt to match existing grade.
- Sidewalk: 1.5m sidewalk, 100mm thick brushed finish concrete.
- Base: 100mm of 20mm minus granular base compacted to 95% Modified Proctor Density.
- Sub-base: 250mm of 80mm minus granular sub-base compacted to 95% M.P.D.
- Topsoil: 200mm of topsoil and grass seed.
Page 69