Committee of the Whole/Documents/Project Summary: GPS Unit Replacement
Appendix

Project Summary: GPS Unit Replacement

April 8, 2025Page 331 section

A project to replace an outdated GPS unit with a more accurate model for municipal asset field pickups.

8.1.a) 2025 Draft Financial Plan
$13,000 capital budgetPriority: StrategicFunding from Casino revenue

Project Summary

Project Name: GPS Unit Replacement Priority: Strategic Public Engagement: Not applicable Reference Number: 2-2-13104-590 CC1296 Submitted by: Darryl Woodley Director: Ivan Leung, Sewer

Executive Summary

The GPS unit that staff currently use is outdated with software no longer supported (it was purchased over 15 years ago). The replacement of this unit is required to at minimum maintain existing levels of service in the maintenance of the Town's sanitary sewer and drainage infrastructure.

Business problem and opportunity

GPS units are used to provide field pickups of Town infrastructure, which is important work in improving and updating asset information. The age and technology of the current GPS unit is inaccurate to today's best practice standards and will be unreliable without software support.

Staff recommend the purchase of a GPS unit accurate to one centimeter: a reliable standard for municipal asset field pickups. Doing so will not only provide reliable information in house (without the need of contracted surveys for small work): it will also reduce costs associated with sanitary sewer and drainage master planning. The asset may also be of benefit for parks playground planning.

Proposed project objectives

To replace an asset that no longer has software support. Provide quick, accurate field pickup of surface features for our GIS system.

Business risks

The current GPS unit we have is unstable, not very accurate and at the end of its hardware and software support.

Proposed sources of funding

Casino Revenue 2-1-00557-866 Operations: None

Costs and benefits

Costs FY1 FY2 FY3 FY4 FY5 5-year Total
Capital 13000 0 0 0 0 13,000
Operational 0 0 0 0 0 0
Total 13,000 0 0 0 0 13,000

Benefits

  • Tangible: Reduced operational costs and more accurate information provided to meet current standards
  • Intangible: Less reliance on contracted surveys

Recommendation

THAT the Committee recommend the 2025-2029 Financial Plan include GPS Unit Replacement in 20__ to be funded by .