Project Summary: Sewer SCADA Pack Upgrades
A project to supply and install new SCADA packs at all 17 sewer pump stations to improve data accuracy.
Project Summary
Priority: Optimal
Public Engagement: Not applicable
Financial Plan: 2025 – 2029 (C-200)
Project Name: Sewer SCADA Pack Upgrades (5-2-11703-950 CC1303)
Submitted by: Darryl Woodley
Director: Ivan Leung, Sewer


Executive Summary
As the community continues to urbanize in areas stipulated in the updated Official Community Plan (2026), data accuracy will become more important when assessing and analysis the health of the Town's sanitary sewer system.
This project recommends an upgrade to the SCADA system at all pump stations to support DNP3 polling which will increase the accuracy and usability of the flow data collected (aka "SCADA packs"). This will significantly improve accuracy when modeling sewer catchment flows and inflow and infiltration data: key metrics in measuring current and future sanitary sewer system health.
Recommended to be scheduled in 2025 so that more accurate readings and a 1 year period can be provided for the Sanitary Sewer Master Plan (scheduled 2026).
Business problem and opportunity
The current SCADA system at the Town's pump stations only support Modbus polling methods which result in poor data for flow meters, which results in poorer accuracy in hydraulic modelling exercises.
Proposed project objectives
To supply and install the new SCADA packs at all 17 sewer pump stations in View Royal.
Business risks
With the OCP expected to be updated in 2026, a preliminary sensitivity analysis indicated that the existing data may be less useful for future sanitary modelling purposes. In other words, less accurate data has a negative and incremental effect to the resilience and accuracy of the sanitary model, thus impacting project priorities.
Proposed sources of funding
Sewer Capital Reserve 5-1-00500-173

Costs and benefits
| Costs | FY1 | FY2 | FY3 | FY4 | FY5 | 5-year Total |
|---|---|---|---|---|---|---|
| Capital | 106,000 | 0 | 0 | 0 | 0 | 106,000 |
| Operational | 0 | 0 | 0 | 0 | 0 | 0 |
| Total | 106,000 | 0 | 0 | 0 | 0 | 106,000 |
Benefits
- Tangible: [Empty]
- Intangible: [Empty]
Recommendation
THAT the Committee recommend the 2025-2029 Financial Plan include Sewer SCADA Pack Upgrades in 2025 to be funded by