Detailed architectural plans for Block S of the townhouse development.

9.3.3 a) Development Permit 2024-01 - 2001-2014 West Park Lane - Phase 6
Dated: July 13, 2023Two-storey triplex design

PROJECT INFORMATION

CUSTOMER: LIMONA HOLDINGS LTD. ADDRESS: BLOCK S - TLC SUBDIVISION (PH5) ISSUE DATE: JULY 13, 2023 DRAWN BY: KL CHECKED BY: KL

PROJECT DATA TABLE: RESIDENTIAL TOWNHOUSE/ DUPLEX

ITEM PROPOSED ALLOWED
Lot Size 42,595.3m²
Zoning CD-23
Floor space ratio 0.095 (2,025.31m²) 21,800.27 Sq. Ft 0.50 (21,297.65m²)
Lot coverage (total) 3.51% (1,495.95m²) 50.00% (21,297.65m²)
Impermeable Surface Coverage 4.85% (2,066.05m²) 50.00% (21,297.65m²)
Average grade
Average building height See Elevations 9.00m 2.5 storeys
Front Setback 5.50m avg. - see site plan 4.50m
Rear Setback see site plan 6.00m
Side Setback 1.55m avg. - see site plan 1.20m
Flanking Side Setback - 4.00m
Setback to Thetis Lake Park - 10.00m
Setback to Trans Canada Highway - 10.00m
Where there is direct access from a driveway, siting of a garage or carport from a highway or private right-of-way driveway, minimum - 5.50m

NAFS REQUIREMENTS

Performance Grade of 30 Water Test Pressure of 260 Pa


Page 153–158

CONSTRUCTION NOTES AND DETAILS

CONSTRUCTION ASSEMBLIES:

  1. 4" concrete floor on 6 mil poly V.B. compacted granular fill
  2. 2x10 floor joist 16" O.C. typ. nail and glue 3/4" T&G plywood x-bridging @ 8' O.C. typ
  3. Asphalt shingles, building paper, 7/16" O.S.B. (or 1/2" plywood), engineered trusses designed by supplier @ 24" O.C. typ., R28 batt insulation, 6 mil U.V. poly V.B. 5/8" GWB
  4. 2x4 framing 16" O.C. typ. 1/2" GWB finish throughout
  5. Exterior finish, 3/4" air space, pressure treated strapping, sheathing paper, 1/2" sheathing, 2x6 studs @ 16" O.C. R-22 batt insulation, 6 mil poly. V.B., 1/2" GWB. (See elevations)

DEMISING WALL: (1h as per W13a - Table A-9.10.3.1.A)

  • Two rows 38 mm x 89 mm studs, each spaced 400 mm or 600 mm o.c. on separate 38 mm x 89 mm plates set 25 mm apart
  • 65 mm thick absorptive material on each side
  • 1 layer of 15.9 mm Type X gypsum board on each side

CONSTRUCTION NOTES:

  1. R40 insulation, 6 mil poly V.B. 1/2" ceiling board.
  2. Continuous soffit vent.
  3. Aluminum gutters and non-vented soffits - roof overhangs as per plans
  4. All windows vinyl, supply rain caps over, rainscreen as per BCBC. Windows in doors to be safety glass
  5. Stairs: 7 7/8" rise, 10 3/4" tread, 1" nosing with continuous handrail
  6. Provide drains to perimeter system
  7. 4" drain tile with 6" rock over
  8. Provide roof vents: 1/150 using Ridgevent / Ridge Vent
  9. Eave protection to 12" beyond heated wall
  10. 8" concrete wall on 8"x16" concrete footings - 2x4 bar continuous - R12 rigid insulation - 2 coats damp proofing
  11. Caulk over and around all exterior openings.
  12. 10" x 10" post saddle on 8" pilaster 2'x2'x2'e concrete footing. NOT SHOWN
  13. 42" non climbable continuous handrail
  14. Undisturbed non-organic soil

Page 153–158

FOUNDATION PLAN

  • S47, S46, S45: 4" concrete floor on compacted granular fill, 6 mil poly V.B., R12 rigid perimeter insulation, slope to drain.
  • Garage Areas: Reinforced slab, slope concrete to drain away from house.

Page 153–158

MAIN FLOOR PLAN (8'-0 3/4" WALLS)

FLOOR AREA STATISTICS

  • S45 FLOOR AREA: 650.41 Sq Ft (60.43 Sq M)
  • S45 GARAGE AREA: 433.55 Sq Ft (40.28 Sq M)
  • S46 FLOOR AREA: 655.96 Sq Ft (60.94 Sq M)
  • S46 GARAGE AREA: 433.55 Sq Ft (40.28 Sq M)
  • S47 FLOOR AREA: 641.21 Sq Ft (59.57 Sq M)
  • S47 GARAGE AREA: 432.19 Sq Ft (40.15 Sq M)

NOTE: TRIPLEX TO BE SPRINKLERED ALL POT LIGHT CAVITIES IN CEILINGS, PLUMBING BOXES, FANS, ELECTRICAL PANELS... IN PARTY WALLS TO BE COMPLETELY SEALED AND FIRE RATED WITH TYPE 'X' DRYWALL


Page 153–158

UPPER FLOOR PLAN (9'-0 3/4" WALLS)

FLOOR AREA STATISTICS

  • S45 UPPER FLOOR AREA: 1,007.40 Sq Ft (93.59 Sq M)
  • S46 UPPER FLOOR AREA: 1,012.51 Sq Ft (94.07 Sq M)
  • S47 UPPER FLOOR AREA: 1,007.40 Sq Ft (93.59 Sq M)

NOTE: TRIPLEX TO BE SPRINKLERED ALL POT LIGHT CAVITIES IN CEILINGS, PLUMBING BOXES, FANS, ELECTRICAL PANELS... IN PARTY WALLS TO BE COMPLETELY SEALED AND FIRE RATED WITH TYPE 'X' DRYWALL


Page 153–158

ELEVATIONS

EXTERIOR FINISHES SCHEDULE

KEY ITEM DESCRIPTION KEY ITEM DESCRIPTION
A ROOFING: ASPHALT ROOFING WITH RAISED RIDGE & HIP CAPS F1 WALL FINISH: HARDIE-BOARD AND BATTEN 16"O.C. CHECKER PATTERN - REFER TO ELEVS RAINSCREEN AS PER BCBC
B GUTTER & SOFFIT: ALUMINUM GUTTER AND VENTED SOFFIT F2 WALL FINISH: HARDIE-PLANK SIDING LAPPED TO 4" EXPOSURE - COLOUR AS PER OWNERS SPECS
C BARGE BOARD: 2x10 WITH 1x4 DOUBLE BARGE BOARD, PAINTED TRIM COLOUR F3 WALL FINISH: HARDIE-PLANK SIDING LAPPED TO 4" EXPOSURE - COLOUR AS PER OWNERS SPECS
D WINDOW & DOOR TRIM: 1x4 TRIM BOARDS - PAINTED/ STAINED G POSTS: 6x6 POSTS - PAINTED/STAINED AS PER OWNERS SPECS - SEE ELEVS
E CORNER TRIM: 1x4 CORNER BOARDS - PAINTED/ STAINED

NOTES:

  • "ALL WINDOWS MUST COMPLY WITH BCBC AND NAFS REQUIREMENTS"
  • MUST BE CLEARLY LABELED ON ALL WINDOW UNITS UPON INSTALLATION FOR INSPECTION.
  • ONE EXTERIOR DOOR IS PERMITTED TO HAVE A HIGHER U-VALUE OF 2.6, ALL OTHERS MUST BE LOWER.
  • GARAGE VEHICULAR DOORS MUST BE MINIMUM NOMINAL RSI OF 1.1