Appendix

Synchro Capacity Analysis Reports

March 14, 2023Pages 704–7092 sections

Technical modeling reports analyzing intersection delay and Level of Service (LOS) for existing and post-development scenarios.

Intersection: Helmcken Rd & Eltham RdLOS B identified for westbound approachesDelay modeled at 11.2 - 11.5 seconds

HCM 6th TWSC 15-Unit Townhouse Development, View Royal

1: Helmcken Rd & Eltham Rd (Existing 2022 AM Peak Hour)

Timing Plan: EX2022-AM

Intersection Int Delay, s/veh: 0.5

Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 7 15 239 10 4 313
Future Vol, veh/h 7 15 239 10 4 313
Conflicting Peds, #/hr 9 13 0 9 9 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 5 4 4 2 2
Mvmt Flow 8 16 260 11 4 340
Major/Minor Minor 1 Major 1 Major 2
WBL WBR NBT NBR SBL SBT
Conflicting Flow All 632 288 0 0 280 0
Stage 1 275 - - - - -
Stage 2 357 - - - - -
Critical Hdwy 6.45 6.25 - - 4.12 -
Critical Hdwy Stg 1 5.45 - - - - -
Critical Hdwy Stg 2 5.45 - - - - -
Follow-up Hdwy 3.545 3.345 - - 2.218 -
Pot Cap-1 Maneuver 440 744 - - 1283 -
Stage 1 764 - - - - -
Stage 2 702 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 431 730 - - 1273 -
Mov Cap-2 Maneuver 431 - - - - -
Stage 1 758 - - - - -
Stage 2 694 - - - - -
Approach WB NB SB
HCM Control Delay, s 11.3 0 0.1
HCM LOS B
Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT
Capacity (veh/h) - - 598 1273 -
HCM Lane V/C Ratio - - 0.04 0.003 -
HCM Control Delay (s) - - 11.3 7.8 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 0.1 0 -

1: Helmcken Rd & Eltham Rd (Existing 2022 PM Peak Hour)

Timing Plan: EX2022-PM

Intersection Int Delay, s/veh: 0.7

Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 8 16 244 13 14 225
Future Vol, veh/h 8 16 244 13 14 225
Conflicting Peds, #/hr 16 16 0 16 16 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 94 94 94 94 94 94
Heavy Vehicles, % 2 2 3 3 3 3
Mvmt Flow 9 17 260 14 15 239
Major/Minor Minor 1 Major 1 Major 2
WBL WBR NBT NBR SBL SBT
Conflicting Flow All 568 299 0 0 290 0
Stage 1 283 - - - - -
Stage 2 285 - - - - -
Critical Hdwy 6.42 6.22 - - 4.13 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.227 -
Pot Cap-1 Maneuver 484 741 - - 1266 -
Stage 1 765 - - - - -
Stage 2 763 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 464 721 - - 1249 -
Mov Cap-2 Maneuver 464 - - - - -
Stage 1 754 - - - - -
Stage 2 742 - - - - -
Approach WB NB SB
HCM Control Delay, s 11.2 0 0.5
HCM LOS B
Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT
Capacity (veh/h) - - 609 1249 -
HCM Lane V/C Ratio - - 0.042 0.012 -
HCM Control Delay (s) - - 11.2 7.9 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 0.1 0 -

1: Helmcken Rd & Eltham Rd (Post Development AM Peak Hour)

Timing Plan: PD-Opening-AM

Intersection Int Delay, s/veh: 0.6

Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 10 17 239 11 5 313
Future Vol, veh/h 10 17 239 11 5 313
Conflicting Peds, #/hr 9 13 0 9 9 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 5 5 4 4 2 2
Mvmt Flow 11 18 260 12 5 340
Major/Minor Minor 1 Major 1 Major 2
WBL WBR NBT NBR SBL SBT
Conflicting Flow All 634 288 0 0 281 0
Stage 1 275 - - - - -
Stage 2 359 - - - - -
Critical Hdwy 6.45 6.25 - - 4.12 -
Critical Hdwy Stg 1 5.45 - - - - -
Critical Hdwy Stg 2 5.45 - - - - -
Follow-up Hdwy 3.545 3.345 - - 2.218 -
Pot Cap-1 Maneuver 438 744 - - 1282 -
Stage 1 764 - - - - -
Stage 2 700 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 429 730 - - 1272 -
Mov Cap-2 Maneuver 429 - - - - -
Stage 1 758 - - - - -
Stage 2 691 - - - - -
Approach WB NB SB
HCM Control Delay, s 11.5 0 0.1
HCM LOS B
Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT
Capacity (veh/h) - - 579 1272 -
HCM Lane V/C Ratio - - 0.051 0.004 -
HCM Control Delay (s) - - 11.5 7.8 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 0.2 0 -

2: Eltham Rd & Access A1 (Post Development AM Peak Hour)

Timing Plan: PD-Opening-AM

Intersection Int Delay, s/veh: 1.3

Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 2 14 22 0 0 5
Future Vol, veh/h 2 14 22 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 15 24 0 0 5
Page 704–709
Major/Minor Major 1 Major 2 Minor 2
EBL EBT WBT WBR SBL SBR
Conflicting Flow All 24 0 - 0 43 24
Stage 1 - - - - 24 -
Stage 2 - - - - 19 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1591 - - - 968 1052
Stage 1 - - - - 999 -
Stage 2 - - - - 1004 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1591 - - - 967 1052
Mov Cap-2 Maneuver - - - - 967 -
Stage 1 - - - - 998 -
Stage 2 - - - - 1004 -
Approach EB WB SB
HCM Control Delay, s 0.9 0 8.4
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1591 - - - 1052
HCM Lane V/C Ratio 0.001 - - - 0.005
HCM Control Delay (s) 7.3 0 - - 8.4
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0 - - - 0

1: Helmcken Rd & Eltham Rd (Post Development PM Peak Hour)

Timing Plan: PD-Opening-PM

Intersection Int Delay, s/veh: 0.8

Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 10 18 244 15 16 225
Future Vol, veh/h 10 18 244 15 16 225
Conflicting Peds, #/hr 16 16 0 16 16 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 94 94 94 94 94 94
Heavy Vehicles, % 2 2 3 3 3 3
Mvmt Flow 11 19 260 16 17 239
Major/Minor Minor 1 Major 1 Major 2
WBL WBR NBT NBR SBL SBT
Conflicting Flow All 573 300 0 0 292 0
Stage 1 284 - - - - -
Stage 2 289 - - - - -
Critical Hdwy 6.42 6.22 - - 4.13 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.227 -
Pot Cap-1 Maneuver 481 740 - - 1264 -
Stage 1 764 - - - - -
Stage 2 760 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 460 720 - - 1247 -
Mov Cap-2 Maneuver 460 - - - - -
Stage 1 753 - - - - -
Stage 2 738 - - - - -
Approach WB NB SB
HCM Control Delay, s 11.3 0 0.5
HCM LOS B
Minor Lane/Major Mvmt NBT NBR WBLn1 SBL SBT
Capacity (veh/h) - - 599 1247 -
HCM Lane V/C Ratio - - 0.05 0.014 -
HCM Control Delay (s) - - 11.3 7.9 0
HCM Lane LOS - - B A A
HCM 95th %tile Q(veh) - - 0.2 0 -

2: Eltham Rd & Access A1 (Post Development PM Peak Hour)

Timing Plan: PD-Opening-PM

Intersection Int Delay, s/veh: 1

Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 4 27 24 1 0 4
Future Vol, veh/h 4 27 24 1 0 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 29 26 1 0 4
Major/Minor Major 1 Major 2 Minor 2
EBL EBT WBT WBR SBL SBR
Conflicting Flow All 27 0 - 0 64 27
Stage 1 - - - - 27 -
Stage 2 - - - - 37 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1587 - - - 942 1048
Stage 1 - - - - 996 -
Stage 2 - - - - 985 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1587 - - - 939 1048
Mov Cap-2 Maneuver - - - - 939 -
Stage 1 - - - - 993 -
Stage 2 - - - - 985 -
Approach EB WB SB
HCM Control Delay, s 0.9 0 8.4
HCM LOS A
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1587 - - - 1048
HCM Lane V/C Ratio 0.003 - - - 0.004
HCM Control Delay (s) 7.3 0 - - 8.4
HCM Lane LOS A A - - A
HCM 95th %tile Q(veh) 0 - - - 0
Page 704–709