Meeting Overview

The Committee of the Whole meeting reviewed several key municipal functions, including West Shore RCMP operations and department financial reports (Budget Variance, Fleet Replacement, Transportation Services). Significant discussions focused on proactive governance, resulting in motions to refer Council convention attendance and Advisory Committee structure review to future Strategic Planning sessions. The evening session addressed parks usage for commercial activities and approved the Terms of Reference for the Urban Forest Strategy. The most contentious item was amending the Secondary Suite Permit Bylaws, which ultimately resulted in the elimination of compliant Type 1 permits and the controversial increase of the renewal fee for non-compliant Type 2 permits from $100 to $200, intended to incentivize compliance with current building codes.

Key Decisions

  • THAT West Shore RCMP verbal report update from Supt. Preston be received for information.
  • THAT the Building Department Report for the Month of September 2023 be received.
  • THAT the report dated October 5, 2023 from the Manager of Accounting titled "Budget Variance and Projects Update Report to September 30, 2023" be received for information.
  • THAT the report dated October 5, 2023 from the Manager of Accounting titled "Fleet Vehicle and Equipment Replacement Plan Update" be received for information.
  • THAT the report dated October 3, 2023 from the Director of Finance titled "Financial Plan Review - Transportation Services" be received for information.
24
Agenda Items
21/23
Motions Passed
2h 57m
Duration
15
Participants

Transcript

1456 segments
Sid Tobias0:00

Good afternoon, View Royal.

Sid Tobias0:01

I'll call the committee the whole meeting to order for Tuesday, October 10th, 2023.

Sid Tobias0:09

And for a territorial acknowledgement, as we look over our agenda today, we recognize the Lakwin speaking people known today as the Esquimalt Nation and the Songhees Nation, and that their historic connections to these lands continue to this day.

Sid Tobias0:24

This afternoon we'll hear from the public during the public participation portion of the agenda, and this evening we will hear from the public during the public participation and question period portions of the agenda.

Sid Tobias0:36

For members of the audience, which there are none in house except some of our guest speakers.

Sid Tobias0:44

But if you're calling in.

Sid Tobias0:45

First, first let me apologize for a glitch in the system for our last council meeting that our unmuting seemed to be having a bit of a glitch.

Sid Tobias0:56

I uh have been told by Don that she has thrashed the system entirely and uh was unable to replicate the faults.

Sid Tobias1:06

So if you're having challenges, uh Carl can assist with a form that you could provide your question with him and submit it, and then we will have that uh either comment or question read out in chamber.

Sid Tobias1:21

Um so if you wish to provide comments, uh call 778-402-9227 and when prompted, enter conference ID 523-186-681 at the appropriate time in the agenda.

Sid Tobias1:35

I will then announce the last four digits of your phone number, ask you to uh mute the live webcast to avoid feedback, ask you to not use your speaker phone so we can hear you, and ask you uh to unmute yourself by pressing star six.

Sid Tobias1:52

Speakers will have five minutes uh each uh to speak during public participation and two minutes to ask a question during question periods.

Sid Tobias2:01

The meeting will be recorded by participating in the webcast.

Sid Tobias2:05

You are consenting to being recorded, and the recording will be available on the town's website forever.

Sid Tobias2:12

Um so can I get a motion to approve the agenda, please?

Kim Anema2:19

So moved.

Sid Tobias2:20

Moved by councillor Lemon.

Sid Tobias2:22

Seconded by Councillor Brown.

Sid Tobias2:24

Is there any errors or omissions?

Sid Tobias2:27

Seeing none, um, I'll call the question to approve the agenda.

Sid Tobias2:32

All in favor?

Sid Tobias2:34

Any opposed?

Sid Tobias2:35

Seeing none opposed, motion carries.

Sid Tobias2:40

And uh can I get a motion to adopt the previous minutes uh from uh the uh September 12th?

John Rogers2:49

So moved.

Sid Tobias2:50

Moved by Councilor Rogers, seconded by Councilor Brown.

Sid Tobias2:54

Uh any errors or omissions?

Sid Tobias2:58

Seeing none, I'll call the question.

Sid Tobias3:00

All those in favor?

Sid Tobias3:02

Any opposed?

Sid Tobias3:03

Seeing none opposed, motion carries.

Sid Tobias3:06

Petitions and delegations looking to staff.

Sid Tobias3:08

I'm seeing none.

Sid Tobias3:10

Uh, we can move down to protective services, where I pass the chair to councillor Brown, please.

Don Brown3:14

Well, thank you, Mayor Tobias, and welcome everyone to the Protective Services portion of this meeting.

Don Brown3:22

Uh, I do have a short chair's report.

Don Brown3:24

I just wanted to report that uh Councillor Rogers and myself attended the uh cops for cancer event last week and represented town of U Royal.

Don Brown3:32

It was an excellent event.

Don Brown3:33

Uh each table had uh one of the riders with us, which was great.

Don Brown3:37

Um, several uh uniformed RCMP members there ushering and looking after the uh the auction.

Don Brown3:42

And of course, I think you had four riders, right?

Don Brown3:44

Hidden or five representing West Shore.

Don Brown3:47

So so that was awesome.

Don Brown3:48

And the the ride for the first time exceeded over a million dollars.

Don Brown3:51

And I think a lot of people from the auctions, for the way some of the items went very high.

Don Brown3:56

They did their part to help raise it over a million dollars.

Don Brown3:58

So that was great.

Don Brown3:59

So please pass my kudos on.

Don Brown4:01

And also uh Cole did an awesome job uh being the MC, Cole Brewer, Constable Brewer did a great job MC in the event.

Don Brown4:08

Um it was great.

Don Brown4:09

Just uh it well, of course, we had the the funeral was on for Constable O'Brien um uh the same day.

Don Brown4:16

So I probably limited some of the members, but it was well attended by by the community.

Don Brown4:20

It was uh it was really good.

Don Brown4:22

Um also I'd like to thank uh uh Corporal Sager again for keeping us up to date on all the press releases and the uh public service announcements.

Don Brown4:30

And I know she put sent out something recently about all the telephone scams that have been happening.

Don Brown4:35

I know uh my wife and I both got uh calls on our phones the other day and one at the home phone, and she checked it out and found it was uh a phone number from Egypt.

Don Brown4:43

So the first thing I thought for sure was it must be a pyramid scheme.

Don Brown4:46

But anyway, on that note of um I'll turn it over to uh Superintendent Preston for his police report.

T. Preston4:55

Counselor Mr.

T. Preston4:56

Mayor Council thanks for uh thanks for having me.

T. Preston4:58

Yeah I regret that I was unable to attend I I attended the funeral for Constable O'Brien so uh that's why I wasn't at the cops for cancer and uh Inspector Rose uh attended the cops for cancer.

T. Preston5:08

So divide and conquer there was um yeah I think we raised uh during that evening uh $35 or $40 thousand dollars in that range uh for uh for the cause.

T. Preston5:18

And I don't think there's any greater cause than pediatric cancer research and uh taking those unfortunate uh children to camp uh for camp day.

T. Preston5:27

So uh yeah, we're we're pretty proud to be part of that.

T. Preston5:29

And like I said, this year was five riders, the most of uh of anybody on the island here, and uh really well represented by West Shore here.

T. Preston5:36

So um I'll dig into it here.

T. Preston5:38

Uh just uh to go over some statistics.

T. Preston5:41

Um we had 34 traffic engagements, 17 warnings, 19 tickets, uh, four were prohibited drivers, six uninsured uh vehicles.

T. Preston5:50

We did six school zone checks done in September uh by the watch and the traffic unit in your area.

T. Preston5:56

Um I'm just gonna go through some of the files here, as I usually do.

T. Preston5:59

Um, we had a report of a sus uh suspect with a machete getting into a cab.

T. Preston6:03

The machete was found on the ground ground in the vehicle.

T. Preston6:05

The uh subject of the complaint was arrested for possession of a weapon dangerous to public.

T. Preston6:09

Um the subject complaint reported to have thrown the machete out of the cells and released on an undertaking when sober.

T. Preston6:20

On September 11th, police attended the shell gas station on the island highway by witnesses who observed agitated male who had a knife uh sticking out of his pocket.

T. Preston6:27

The suspect fought with police when arrested.

T. Preston6:29

The male was arrested for cause of service and possession of a weapon, uh dangerous to purpose, and was released uh on an undertaking and is also transported to uh Vic General Hospital.

T. Preston6:39

Uh September 18th, we had a complaint.

T. Preston6:41

Uh the complainant attended the uh the RCP's front counter to surrender suspect uh suspected drugs located near a residence on the 200 block of Island Highway.

T. Preston6:49

It tested positive franphetamines and methamphetamine, and that was uh lodged for destruction.

T. Preston6:54

So, of obvious concern that uh you know, we're seeing drugs laying around uh the community that are being picked up by the the general public.

T. Preston6:59

And the obvious concern there is uh a young child that picks that up that doesn't know any better and then opens that package.

T. Preston7:07

Um September 17th, we had a blue uh 2011 Volvo reported stolen.

T. Preston7:11

Witnesses advised female drove uh off with the vehicle while acting erratic.

T. Preston7:16

Other vehicles uh sustained damage in the near uh nearby area, and uh the suspect was identified as they were known to police, was located and arrested when she returned to the scene of the theft.

T. Preston7:27

Um the vehicle was also uh located, dumped at the casino.

T. Preston7:32

So this individual was actually um high on drugs, was uh at the fountain diner in Langford initially, stole the vehicle, smashed up vehicles, dumped it at the casino, was found at the casino, and somehow ended up back to the fountain diner in Langford where she was arrested at that point.

T. Preston7:50

Um, we had a sudden death uh reported at Theatus Lake, corner attendant, and believed to be a natural cardiac uh arrest, natural causes.

T. Preston7:58

We had a report of uh uttering threats near uh Atkins Ave and View Royal suspect was arrested uh and released on the way of an undertaking.

T. Preston8:05

Uh we had members dispatched to the parking lot at Vic General Hospital to report of a car uh doing suspicious or car being suspicious doing donuts.

T. Preston8:12

The police attended and found the car fitting the description of the vehicle, had no license plate or registered owner, and the vehicle took off at a very high rate of speed in a in a pursuit-like manner.

T. Preston8:21

We didn't uh chase that individual.

T. Preston8:24

Um September 27th, uh the 200 block of Highland Highway suspect arrested for driving with an invalid driver's license enlisted as prohib.

T. Preston8:33

And that individual was uh charged with driving while prohibited and a seven-day vehicle impound.

T. Preston8:38

We unfortunately had a uh drowning reported, uh I think that was fairly high profile drowning at Theatus Lake of an international student, and we had the uh body was recovered by View Roll Fire Department.

T. Preston8:50

Um October 9th, we had a male uh running in and out of traffic near the six mile on Island Highway, causing a bus to stop briefly.

T. Preston8:57

The male was paranoid but not deemed a threat to himself or others and left the roadway um walking on the goose.

T. Preston9:06

October 8th, uh we had a reports of shots being heard uh near near the second lake at Theodus Lake.

T. Preston9:13

Officers attended, located one family on a boat who also stated they had heard something but didn't see any firearms in the area.

T. Preston9:19

October 7th, we had a suicidal male standing on the outer portion of Helmakin Bridge, eventually came back over the bridge, but ran on foot and was chased down and apprehended as he was trying to run into traffic uh to commit suicide.

T. Preston9:30

This is the fourth attempt uh in the last six months of suicide on this bridge.

T. Preston9:34

Uh, we've been speaking with the Ministry of Highways uh to try to put up uh higher barriers.

T. Preston9:39

And I believe uh Mitzi Dean has also been involved uh with uh trying to champion that as well.

T. Preston9:45

Um we had 9,600 block of Talcut uh road.

T. Preston9:49

The homeowner heard a bang, front windows smashed in, uh smash indoor.

T. Preston9:53

Homeowner was bear sprayed uh by unknown individuals as he went to investigate what happened outside.

T. Preston9:58

The uh the SOC wearing a blue hoodie got into a blue sports car, and uh the victim was uncooperative uh during that file.

T. Preston10:08

Uh thus far we've had uh a 15% increase in overall calls for service, 336 more files than we did last year.

T. Preston10:15

So we have uh thus to date in view world, we've gone to 2,541 uh calls for service.

T. Preston10:23

Um fortunately, the violent crime has increased uh 30%, so 26 additional files.

T. Preston10:29

Last year we've had 113 violent uh incidents, and that's common assaults, subtraid threats, harassing, communication.

T. Preston10:36

Those are kind of the top three that represent violent offenses.

T. Preston10:40

Um, and unfortunately, like I said, we've had 27 more of those uh compared to last year.

T. Preston10:43

Property crime is up uh 14 percent compared to to last year as well.

T. Preston10:51

Uh that's 32 files to put that in perspective.

T. Preston10:55

Um, thus far we've had 267 compared to 235 last year at this time.

T. Preston11:00

The casino, we've seen a 15% increase plus 10 files uh last year.

T. Preston11:06

We've gone through uh 76 times to the uh the casino for various reasons.

T. Preston11:10

The hospital has actually remained pretty stable, it's just a 1% increase, so it's uh pretty much the same as last year.

T. Preston11:15

We've been at the hospital uh for that.

T. Preston11:19

And we've had a three percent decrease in mental health related calls at the hospital.

T. Preston11:24

Um I'll probably stop right there and just uh and one other note.

T. Preston11:29

I should uh I've been speaking with the CAO and and the fire chief about potentially putting um moving our First Nations police officer in the interim to the fire hall.

T. Preston11:43

Um and if we're fortunate enough to get a second position there, um, which we've been asking for to help out with songgies and the squamalt and first nations uh in general uh for our area.

T. Preston11:55

We yeah, I'm told that that area would be sufficient, enough room uh to to hold two members.

T. Preston12:01

Uh so uh I bring that to council's attention because it'll likely come to to you to um solidify that, but uh I certainly support that.

T. Preston12:10

It's uh it's a the location's perfect, it's um obviously with the fire department uh it's the security's not an issue and and at this point here I'm I understand that there's not sufficient area at Songhiz wellness center for coal uh constable brewer there to to be placed so I'm certainly supportive of that uh as we kind of embark on a new building and uh who knows what the future will bring from there.

T. Preston12:33

So uh counselor if I could open it up to questions there.

Sid Tobias12:37

Mayor Tobias go ahead.

Sid Tobias12:40

Thank you Mr.

Sid Tobias12:41

Chair.

T. Preston12:41

Um yeah I had a um uh a call from your I guess appointed uh mental health unit uh supervisor today um and uh uh just understanding from her that the province hasn't yet put in place the psychiatric nurses that would be the support system have you got a timeline uh for that is there anything we can do to support yeah no i i i got that today initially they had asked uh my my understanding is that they were talking about putting counselors instead of nurses and we've asked for nurses so that backed it up uh uh about 30 days it sounds like it everything's in place for the uh in terms of putting the application or the the job posting out and i'm told that posting will go out um in the next three to four weeks that posting should go out with uh VIHA and then at that point it's a matter of hiring and then they have to give notice so realistically now we're probably January is what I'm being told um we're ready to go at any point uh with those clinicians and the corporal that you were speaking with uh earlier Lauren Ferguson who's heading up the unit um has started you know building the policies um doing all the background the admin and taking on some of the uh files that we can kind of deal with on a on an aside if you will so but um yeah we're I mean it's not going to be the silver bullet in terms of fixing our mental health issues but it's certainly going to provide a lot more support services for for those that are in need and so we're certainly looking forward to that.

T. Preston14:17

But it probably won't be till January.

Don Brown14:22

Sir Lemon, go ahead.

Gery Lemon14:24

Thank you.

Gery Lemon14:26

Superintendent, you mentioned a an incident on Talcut in which the victim was uncooperative.

Gery Lemon14:32

So have you been called to that address before?

T. Preston14:36

Is it I believe that's the one that uh if you're referring to have to go back from my notes here, but there's one that we're very familiar with 96 block of telecodes.

T. Preston14:47

So I believe that is the one that uh I believe.

T. Preston14:50

Don't quote me, I'd have to look into it, but I I know there is a repeat of that's the one you're referring to.

Gery Lemon14:56

I yeah, the one which you he was the victim was sprayed with bear spray and then was uncoop uncooperative.

T. Preston15:04

Yes.

T. Preston15:05

Yeah, there is a there is a residence that's well known to police on that on that street.

John Rogers15:09

Okay, thank you.

T. Preston15:10

Oh, sir Rogers.

John Rogers15:12

Yes, thanks.

John Rogers15:13

I I had just alluded to this uh earlier this this afternoon.

John Rogers15:16

And um I've spoken to uh Counselor Brown about this, and and I'd certainly would appreciate you uh looking into it and coming back next time.

John Rogers15:23

And that's the whole aspect of some police stations using and and working with um residents and businesses who have uh security cameras and that they can voluntarily um if you like sign up um with uh the their police detachment and offer their their video camera uh should the uh uh the police have need of that uh for some investigative purposes or because you often hear on the news, um if anyone has any dash cam or uh video, whatever, whatever, um this may be uh an opportunity, but um I knew there's pros and cons and and uh I'd appreciate your thought and if you'd give us a yeah I mean obviously uh that would be very advantageous.

T. Preston16:06

I believe that they're housed actually within a uh the city or and I had this in Kimberley actually it was a private business that actually that installed them all that then was able to with her cooperation um access all the cameras as well and supply those with their permission to the police.

T. Preston16:24

Um the issue is we wouldn't be able like we wouldn't have the the resources to actually to store um all those those cameras or um so it would have to be done through a kind of a joint effort through the municipalities.

T. Preston16:37

It's a great idea um because that is what all too often what we're looking for and and if we had it at our fingertips it would be substantially easier i will look into it i'm not an IT person um at all but I'll uh I'll certainly ask around and see what uh what could be done what the potential is what the risks are and get back to you on that.

John Rogers16:57

Yeah it is it is a um a program that's offered through the policy uh so I think it was the Saskatoon police and maybe Miss Surrey uh but I don't know if it's the Surrey police or the RCMP.

John Rogers17:10

But uh yeah it's a it's there's an application form people s can just uh sign up and and uh and offer their services and they and i i think these are as as common as doorbell um security alarm security systems but uh I'll leave that with you.

T. Preston17:27

Yeah it's a good suggestion counselor I'll I will look into that.

Don Brown17:29

Thank you yeah yeah just it's it's good to hear that you're gonna be using some of the space in fire hall I think that's awesome it's uh halfway towards the community police station but um obviously I well probably most of the time you would probably start and finish the shift there is that correct correct yeah so um yeah obviously be driving through V Royal so you get that uh um visit visibility yeah from the community and that won't stop you uh assigning one of the GD members on a regular basis to yeah I know and and again just because I know this we got some new council uh members as well.

T. Preston18:01

Um yes, there is zones that the members will get assigned.

T. Preston18:05

It doesn't mean that they're only going to those those zones for the day.

T. Preston18:08

So, you know, we may have 10, 10 members on right now.

T. Preston18:11

And if there's eight calls in V Royal, all eight members are in B Rural right now.

T. Preston18:16

If they're over there and per capita, when you actually go back and you look at the stat, it's it's it's crazy actually how close it is to the proportion that you actually pay for.

T. Preston18:26

So all three communities proportionately are contributing, but you know, economy to scale and you don't perhaps don't need eight right now.

T. Preston18:34

But Callwood needs eight.

T. Preston18:35

We have the ability to to be nimble and pivot that way.

T. Preston18:37

But no to answer your question, no.

T. Preston18:39

I mean, uh we'll certainly still have coal is a uh is a position uh paid for by the the province and the federal government.

T. Preston18:46

So that position is solely to build bridges um with the First Nations communities.

T. Preston18:51

His job is not to take files essentially.

T. Preston18:55

It's just to be an ambassador and build bridges and build those networks with the uh the the First Nation communities.

T. Preston19:01

Yeah.

Don Brown19:03

No further questions.

Don Brown19:05

Uh thank you very much.

Don Brown19:06

Thank you.

Don Brown19:10

Next is the building inspection report.

Don Brown19:13

I don't know if this is just for uh information or did staff want to comment on that or or can it be a just receive and file?

Don Brown19:19

Can I get a motion to receive and file?

Elena Bolster19:21

Uh well Sarah, did you have your hand up?

Don Brown19:25

Okay.

Elena Bolster19:26

Mover shape.

Don Brown19:27

Uh seconder.

Don Brown19:30

Okay.

Don Brown19:30

Cool.

Don Brown19:31

Yeah.

Don Brown19:31

But do you want to do the second and first and okay, second by Mayor Tobias?

Don Brown19:36

Yeah, go ahead, uh, Counselor Lemon.

Gery Lemon19:38

Yeah.

Gery Lemon19:39

Um, to staff, uh, which project is the 59 million one.

Leanne Taylor19:48

Through the chair, it's the Aspire Development at the corner of Burnside and Helmkin.

Don Brown19:59

And there's no uh new business, so I can uh move it on to uh counselor Lemon for the uh arts and culture.

Don Brown20:06

Oh sorry, seriously, go ahead.

Sarah Jones20:08

Thank you.

Sarah Jones20:09

Um may I encourage uh uh the meeting to move back to public participation period, please.

Don Brown20:18

Back to Mayor Tobias.

Sid Tobias20:20

You're right, we skipped over it.

Sid Tobias20:22

Thanks, Sarah.

Sid Tobias20:23

Um we can move to public participation period now.

Sid Tobias20:27

Of course, we can move in the room first if anybody wants to make any comments.

Sid Tobias20:29

Carl, we got everybody on the phone.

Sid Tobias20:33

I'm seeing shakes of head.

Elena Bolster20:38

Mayor Tobias, we have no callers at this time and no emails from the general public.

Don Brown20:45

Thank you, Carl.

Don Brown20:46

Back to you.

Don Brown20:48

And I'll pass it over to Councillor Lemon for her committee.

Gery Lemon20:52

Thank you very much.

Gery Lemon20:54

This will be short and sweet.

Gery Lemon20:57

Within the last couple of weeks, I've attended the Greater Victoria Public Library Board meeting, and it was pretty low-key.

Gery Lemon21:08

We discussed how to proceed with the strategic plan and the and the process to be used.

Gery Lemon21:15

Likewise the CRD Arts Commission, very low key, and staff and the chair are visiting the arts commission has 10 of the 13 municipalities on on board.

Gery Lemon21:33

And so they're visiting the the non attendees in hopes of of eventually or soon having be a truly regional arts commission.

Gery Lemon21:47

As it is, you know, everyone in the region participates in arts Downtown that are that are or arts around the region, but most of them are downtown that are supported by this council, this town, and nine other municipalities.

Gery Lemon22:04

So it would be great if they're successful and could get the non attendees on side.

Gery Lemon22:14

So I look forward to hearing about that.

Gery Lemon22:16

And other than that, I nothing, but I did I did want to address in case because it is, you know, we are live.

Gery Lemon22:24

I just wanted to say that I am perfecting my makeup skills to hide what might well be a visible mark here.

Gery Lemon22:32

The other guy was a six-year old with a stick.

Gery Lemon22:38

And it's it's um it's been taking its time to heal, but but um we're working on it.

Gery Lemon22:44

And that's all.

Gery Lemon22:45

I'll turn it over to you now, Mayor Tobias.

Sid Tobias22:50

Thank you, Councillor Uh Lemon.

Sid Tobias22:52

I'll forego uh chair report and uh introduce the finance and administration portion.

Sid Tobias22:58

Don't believe there is any business arising, and I'll go to 6.3.381 for the budget variants and projects update.

Damon Christenson23:10

Thank you, Chair.

Damon Christenson23:11

This is just our routine report.

Damon Christenson23:13

Happy to answer any questions if there are any.

Sid Tobias23:25

Councilor Roger.

John Rogers23:27

So reading the conclusion, it appears that uh we were within acceptable variances and we're all okay.

John Rogers23:33

Is that is that uh on target?

Damon Christenson23:36

That is uh the conclusion of the report, absolutely, and we will continue to monitor as we near year end.

John Rogers23:42

I move a sheet.

Damon Christenson23:45

Second.

Sid Tobias23:46

Uh moved by councilor rogers, seconded uh by counselor McKenzie.

Sid Tobias23:51

Uh any discussion?

Sid Tobias23:54

Comments?

Sid Tobias23:55

Seeing none, I'll call the question.

Sid Tobias23:57

All in favor of receipt.

Sid Tobias23:59

Any opposed?

Sid Tobias24:00

Seeing none opposed, motion carries.

Sid Tobias24:02

And I think that brings us to the fleet vehicle and equipment replacement plan update.

Sid Tobias24:10

I think this is yours.

Damon Christenson24:13

Thank you.

Damon Christenson24:14

We will have asked the manager of accounting to present uh the report that he uh kind of shepherded all the way to conclusion.

Steven Vella24:26

Good afternoon, Mary Tobias, members of council, Stephen Vella, manager of accounting here at the town.

Steven Vella24:33

Uh each year staff bring forward a council of fleet vehicle replacement plan for your consideration ahead of budget discussion scheduled for the new year.

Steven Vella24:42

Uh, what's new for this year is that we've incorporated in the report, the replacement of self-contained breathing apparatus units, as well as fire hoses due to the magnitude and and nature of their funding.

Steven Vella24:59

As part of the town's commitment to asset management and fiscal sustainability, the intent of this plan is to forecast the timing of vehicle and equipment replacements together with their funding sources.

Steven Vella25:12

This ensures the safety of staff and the public and as well as levels of service being maintained, and that reserves remain sustainable over the long term.

Steven Vella25:26

The town's fleet consists of 25 vehicles, ranging in age from newly acquired to 32 years old.

Steven Vella25:34

Vehicle conditions were established relative to reliability, maintenance requirements, and other operating cost drivers.

Steven Vella25:44

19 vehicles or 76% of the fleet are rated from good to excellent condition, while six vehicles or 24% are in either fair or poor condition.

Steven Vella25:57

Contributions to the machinery and equipment reserve remain unchanged, while an annual increase of $24,000 is required to maintain the fire department machinery and equipment reserve at sustainable levels.

Steven Vella26:12

Staff continue to balance the practical needs of the town with market availability of more fuel uh efficient and environmentally sensitive options.

Steven Vella26:21

Depending on each vehicle's intended use, electric vehicles may be appropriate, and the plan incorporates the financial impact of the town's move toward a greener uh vehicle fleet supporting View Royal's goal of carbon neutrality.

Steven Vella26:37

So staff recommend that uh committee receive this report for information uh in advance of budget workshops planned for February of 2024, and uh these workshops will allow for further discussion regarding the timing and funding options of the plan.

Steven Vella26:53

So thank you.

Steven Vella26:54

And with that, uh staff are available for questions.

Steven Vella26:58

Council Lemon, please.

Gery Lemon27:00

Thanks, Steve.

Gery Lemon27:02

Um, you might not know the answer to this, but do you and I and I should, but that's all right.

Gery Lemon27:09

Yeah, the int the brush truck for 350,000, what does what does it do?

Steven Vella27:18

You're right.

Steven Vella27:18

I mean I I I wouldn't be able to speak to that definitively.

Steven Vella27:22

So I'm not sure if one of our uh our senior managers may be able to speak to that further.

Steven Vella27:30

Maybe Kim, but I don't know.

Steven Vella27:32

Yeah, Chief would be the one.

Damon Christenson27:34

My my feel on that is that it was more related to wildfire fighting activities, and that's about as good as I'm gonna get you.

Damon Christenson27:44

Okay, good.

Gery Lemon27:46

Thank you.

Steven Vella27:47

I do know that that truck is usually kept local, I believe, like for regional, right?

Steven Vella27:54

Firefighting, but yeah, to Don's point, the wildfire uh issues.

Sid Tobias27:59

Yeah, thanks.

Gery Lemon27:59

Okay.

Speaker_Unknown28:00

Yeah.

Gery Lemon28:01

Thank you.

Sid Tobias28:02

Any other questions?

Sid Tobias28:04

Uh Councilor Roger.

John Rogers28:07

Uh great report.

John Rogers28:08

Um so you know, we we've in the in the summary, we've uh there's a recommendation that we've increase the um um the contributions to reserves.

John Rogers28:16

And it sounds like that's uh specifically for um uh fire department um equipment.

John Rogers28:22

Am I right?

Steven Vella28:25

Well, that does incorporate the the equipment that we've added, uh the funding uh for in the plan for those fire hoses and SCBAs.

Steven Vella28:33

Uh and there was also uh Chevy Venture, I believe, uh noted in the report that we're going to be looking at replacing in uh 2025 and then further replacement down the road.

Steven Vella28:44

I don't have that in front of me, but because it's beyond the scope of this report.

John Rogers28:50

Okay, so the um the that with particular reserve that the way of staff are recommending an increase in contributions that handles both equipment and fire trucks.

Steven Vella28:59

Is that is that right?

Steven Vella29:01

Fire trucks uh based on on the the magnitude of their cost and if if they if we can absorb the cost uh through reserve funding, then yes, otherwise we look at debt or casino as we've discussed in the past.

John Rogers29:16

Okay.

John Rogers29:17

Okay, so um the recommendation is because I I do see in uh in the discussion on fire apparatus that we're we have we do need that if we're going to uh meet our continued goals.

John Rogers29:27

Okay, that's that's great.

John Rogers29:28

The um in terms of and I really appreciated the the discussion about the vehicles and um EV vehicles when and if they're they're appropriate for um and can do the task that we we want.

John Rogers29:41

There was also, if I'm reading this properly, um some aspect if we're going to get uh EVs and moving towards those, uh, that we would need uh more charging stations uh to uh for those vehicles.

John Rogers29:54

Is that something that we would need to do on site here or would we uh be able to do that?

John Rogers30:00

Well, anyway, general question, what's going on there?

Steven Vella30:03

Well, I'll pass it over to Director of U Transportation Services.

Ivan Leung30:08

Thank you, Chair.

Ivan Leung30:08

Ivan, the young director of engineering and parks.

Ivan Leung30:11

So, yes, uh, these parks vehicles are secured in a yard that's gated after hours.

Ivan Leung30:17

Um additional EV vehicle be in our fleet, uh, we would need additional EV charging stations in that uh facility.

Ivan Leung30:27

Um there are two other public facing charging stations, one at uh Helm's Annual Park and one just outside in the front parking lot, but those are not secured and they're often used by residents.

John Rogers30:44

So um have we budgeted um and some kind of timeline in the next five years when we might need to um uh address the cost, uh capital cost for that installation?

Ivan Leung30:58

Uh through the chair, staff will be incorporating that in future budgeting uh so for example i believe the next one in 2024 uh there's an east on frontier that might be suitable as an EV replacement so um the idea would be to have uh an upgrade to the year to incorporate that and uh at this time staff are looking at options and costings for the purposes of budgeting and one last question um the expensive super e1 number 38 fire truck is that um and is that cost that's um going to be budgeted through a reserve or reserve and casino that has been budgeted uh as coming out of casino uh a hundred percent uh at this point and I guess in in February you that'll be revisited once again.

John Rogers31:56

Thanks for the reminder.

John Rogers31:57

I couldn't remember.

Sid Tobias32:00

Thank you, Councillor Rogers.

Sid Tobias32:02

Anybody else with questions or comments on the report?

Sid Tobias32:05

And we've got a motion on the floor to receive, I believe.

Sid Tobias32:09

So all in favor?

Sid Tobias32:11

Any opposed?

Sid Tobias32:12

None opposed.

Sid Tobias32:14

Thank you.

Sid Tobias32:16

And I think that brings us to item C: Financial Plan Review Transportation Services.

Don Brown32:22

Doug.

Don Brown32:35

Good afternoon, Chair and Committee.

Damon Christenson32:40

This report is the third of a series.

Damon Christenson32:44

We've seen each other quite often in this way, haven't we?

Damon Christenson32:48

It is a series of five.

Damon Christenson32:50

So we're we're halfway there.

Damon Christenson32:53

So we have been going through the operational budget kind of division or function by function just to have an idea of you know what kind of revenue might be um driven by these activities and the kind of the perspective on the expenses and what what we pay for in each of these services.

Damon Christenson33:13

Today we're looking at transportation services we call it transportation services but I I appreciate that you'll want to understand what we mean by that and it really is a broad variety of activities.

Damon Christenson33:29

If you think about as you're driving down Island Highway what do you see boulevards sidewalks curbs bus shelters street lights signs signals it's it's a wide variety uh and and you know you know quite it's not just pavement, right?

Damon Christenson33:50

It's it's uh everything um associated with keeping our our transportation system safe.

Damon Christenson33:58

I also want to uh highlight that in a small organization like this, people do double duty.

Damon Christenson34:08

And by that I mean that we have personnel in our that are budgeted for in our transportation budget, and primarily that might be what these individuals are focused on.

Damon Christenson34:23

However, the engineering department who looks after our transportation services also manages our parks services, also looks after storm drainage, also looks after and administers our environmental or our sanitary sewer systems.

Damon Christenson34:44

And we we do a cost-benefit analysis of would it take more time to count the pennies allocated to each activity than it's worth?

Damon Christenson34:57

And in in most cases, we say it's not worth it to try to have everybody write down exactly what they're doing every moment so that we allocate the budget specifically to each activity.

Damon Christenson35:10

So generally, um, what you're seeing in administration in transportation services is dealing with transportation services, but there are some activities that I would say are some uh levels of efforts um that would be attributed to administering parks environmental service and you know building maintenance this facility right engineering services does that as well so I just want to uh highlight that for your information and context for the numbers that we see when we look at revenue um really transportation services does not generate a lot of revenue it just really doesn't um and and typically the revenue that you're seeing coming in here is often work done for others we call it work done for others so it's work that it only makes sense for the for our people and you know to to do it, and then we recover the cost, might be from the developer, it might be from Astraticorp, it might, you know from from various other places.

Damon Christenson36:09

And at the end of the day, it still doesn't amount to a whole lot, about 1% really.

Damon Christenson36:16

Expense-wise, you can see that generally the expenses is uh uh represents about 19% on average of Uroy's total operating expenses, with uh the majority of that for transportation and roads.

Damon Christenson36:33

Uh 29% administration, uh please do take that in the context that I referred to a few minutes ago, and drainage about 9%.

Damon Christenson36:41

That's our storm drain system.

Damon Christenson36:46

And of that, uh because we are we deliver our transportation services primarily through a contracted services service for road maintenance, winter road maintenance, boulevard maintenance, that sort of thing.

Damon Christenson37:02

Um you can see that 65% of the services delivered by you know either contractor or or we're directly buying goods and and services, and 22% by in-house personnel.

Damon Christenson37:16

Utilities, of course, would be would would include the cost of the electricity for the streetlights, for example.

Damon Christenson37:25

And that's all I have.

Damon Christenson37:26

The recommendation is to receive the report.

Damon Christenson37:28

Happy to answer any questions or uh direct ones that I can't answer to the director of engineering and parks.

Sid Tobias37:36

No, counselor lemon has one, but I'll go first.

Sid Tobias37:39

Um and that is uh when we're also moving to asset management.

Sid Tobias37:48

Um are our roads considered assets and will there be and everything to do with them?

Sid Tobias37:55

And will that provide us uh greater clarity for when things need replacing and more accurate uh budgeting, I guess would be the hopeful outcome of all of that.

Damon Christenson38:10

Absolutely, yes.

Damon Christenson38:11

Roads and um all of the services provided under the roads, sanitary sewers, um, water means, of course, are our CRDs, but um all of those roads definitely, and all of the things that we include or think of of uh associated with our roads are all VRoyal assets that are included and will be included in our asset management projections for replacement values and times, you know, timelines.

Sid Tobias38:41

Thank you, Donna.

Sid Tobias38:42

Just uh for uh Ivan, if you haven't seen it, that um Sanach is quite upset with one of the bus routes that they built all of their bus shelters uh and then they changed the route.

Sid Tobias38:54

So the bus is actually going in the opposite direction, so all their bus shelters don't work.

Sid Tobias38:59

So um a good reason to have a regional transportation authority, but also having a heads up from BC Transit when they can plan to change their route.

Sid Tobias39:11

Uh councillor Lemon, please.

Gery Lemon39:14

And they got it wrong.

Gery Lemon39:14

Yes, and that road was closed for a year.

Gery Lemon39:21

Question regarding bus shelters, Dorm.

Gery Lemon39:24

When a bus shelter is vandalized, glass is smashed.

Gery Lemon39:29

And we've seen that happen.

Gery Lemon39:31

Is that our dime?

Damon Christenson39:33

That is a really good question.

Damon Christenson39:35

We do have insurance for some things, but I'm going to ask our uh director of engineering and parks to tell us what he knows about that.

Ivan Leung39:44

Yeah.

Ivan Leung39:45

Um, that's a good question, too, or is it depends on who owns it?

Ivan Leung39:49

So BC Transit owns some, Patterson owns some, and then the town owns some.

Ivan Leung39:53

So it really depends on which stop uh is being vandalized.

Gery Lemon39:59

So further to that, um but what what's the what's the split on BC Transit vis-a-vis the town?

Ivan Leung40:11

I don't have the numbers at the top of my head.

Ivan Leung40:13

I believe BC Transit has the market share of the transit stops in Vero.

Ivan Leung40:17

Um that is followed fairly closely by the um Patison stops.

Ivan Leung40:23

Uh both of them have agreements with the town in terms of who maintains what.

Ivan Leung40:27

So there are certain portions the town would maintain, that'd be the the sidewalks, the pad, garbage cans, but the actual stops itself, it really depends on uh who owns that shelter.

Gery Lemon40:41

Got it.

Gery Lemon40:41

Thank you.

Ivan Leung40:44

Councillor McKenzie, please.

Alison MacKenzie40:44

Thank you for your report.

Alison MacKenzie40:47

Um, I will ask the question I always ask on this, and for the director of engineering, I believe, is there any opportunities to for cost savings if we needed to?

Alison MacKenzie41:00

And the first thing that pops into my mind is the boulevards end up maybe switching to perennials in some places.

Alison MacKenzie41:06

I know a lot of people call us out on those because they see a lot of work um being happening on the boulevards.

Alison MacKenzie41:12

So uh yeah, if you wouldn't mind commenting on that.

Ivan Leung41:15

Yeah, through the chair.

Ivan Leung41:17

Um, in the short term, no, and the reason why I say that is because the boulevards are maintained under contract.

Ivan Leung41:24

So um, by implementing cost reduction measures now, um, while practically speaking it may cause cost reductions we're still under contract by basically uh per boulevard and that's a fixed number so if we reduce the the the the maintenance cost now we wouldn't see it until basically next uh next contract amendment essentially great thank you thank you councillor McKenzie Councillor Brown please thank you don't this is kind of a uh minor question but I'm just wondering the charging stations do they generate any revenue or is it kind of cost neutral?

Don Brown42:02

And also how how much usage do they get?

Don Brown42:05

We just have two, right?

Ivan Leung42:08

Yeah, uh through the chair.

Ivan Leung42:10

Um a report was sent to council probably maybe a year ago or so um about that actual topic.

Ivan Leung42:17

And the short answer is that it's basically cost neutral.

Sid Tobias42:23

Uh council Rogers.

John Rogers42:24

Yeah, thanks.

John Rogers42:25

Um thanks, Ron.

John Rogers42:27

The uh there are the two um um pages you have uh that show the um operating budget and yeah, it's like a graph and a circle.

John Rogers42:39

Can you can you just go to those um like the first one?

John Rogers42:44

And one more up.

John Rogers42:46

Okay, so for that one there, um, you know, it it says one percent, one percent, one percent.

John Rogers42:52

What's one percent?

Damon Christenson42:56

That is the uh relative proportion of revenue brought in by the transportation services division.

Damon Christenson42:59

Okay, next one.

John Rogers43:06

One below that.

John Rogers43:08

So what are those dark blue lines?

Damon Christenson43:10

So that's the relative expense of the total operating budget for that transportation services represents.

Damon Christenson43:19

So transportation services basically is a is 18, 19 of the total view royal operating budget on the expense side.

John Rogers43:29

Okay.

John Rogers43:29

Thanks for the explanation.

John Rogers43:30

But if someone were to re-see this, um, they may not um it may not be directly or easily obvious.

John Rogers43:38

Um, so when when when we have that, it it's it would be helpful to have some other text to explain what what that is.

John Rogers43:44

Okay, so that would that would be useful.

John Rogers43:49

Um so we we contract a lot out to um uh is it main road or uh it's uh Victoria Contracting Master Municipal Corporation.

John Rogers44:01

Yeah.

John Rogers44:02

So with with that contracting out, and I'm just trying to think of economies to scale.

John Rogers44:06

Um, you know, they obviously still removal and boulevard maintenance and uh other sorted uh um responsibilities.

John Rogers44:14

Um do we have any sense of uh the number of staff and vehicles that um we would need in View Royal to do that service ourselves?

Ivan Leung44:26

Probably not, and the reason why I see that is because uh one is level of service so getting it through municipal versus getting it through uh a contractor contract does um explicitly say times like call-outs and and of that sort so uh the first thing to really consider is level of service and the second thing to consider is what kind of staffing is needed uh to maintain that from a municipal level um that's as about as far as I can really state right now because this this is the first time I've heard of this question and I would love to give you more information on that but that requires a little bit more research.

John Rogers45:10

I thank you so um indeed, you know, we we um I and I don't know how much with that municipality is comparatively speaking, you know, that they're providing their own service uh machinery and maybe they have all the acreage necessary to have these trucks and space storage is as we do not.

John Rogers45:29

But it's um I think it's it's helpful for people who uh remember maybe at at some point uh we can have that analysis and and that public information so they are able to put that into context there in terms of the uh efficiencies and economies of scale that staff are working towards that I can maybe provide more uh information just from a from a high level and um certainly right now, uh, in terms of space, uh the amount of maintenance vehicles we have as we have right now, uh knowing that we contract out the market share of work, and we're pretty much at capacity for our own space.

Ivan Leung46:08

And so if there was to be uh an internal kind of road maintenance portion, um, that would require more space.

Ivan Leung46:17

Uh the real estate is only one portion of the of the equation, the other portion is uh staff.

Ivan Leung46:26

So um a lot of our uh contracted employees, they actually have their own customer service department as well.

Ivan Leung46:33

Um, they take the complaints and then they administer them uh through their own means and methods.

Ivan Leung46:38

And so to have a an internal kind of public works would um significantly increase staff resources that are required.

Ivan Leung46:46

And you know, our staff, as as uh Director Christensen has alluded to, um our administrative staff don't only do transportation, I mean they do uh garbage collection complaints, they do solid waste, they do uh public works, they do uh parks as well.

Ivan Leung47:02

So it's uh it's very multifaceted, and I do uh appreciate the the one and a half staff that we have um to administer those.

Don Brown47:09

Thank you.

Ivan Leung47:10

Appreciate it.

Sid Tobias47:13

Councilor Rogers, any other questions?

Sid Tobias47:16

Comments?

Sid Tobias47:18

Seeing none.

Sid Tobias47:19

Uh do we have a motion on the floor for that?

Sid Tobias47:20

I'm trying to refresh my memory.

Sid Tobias47:22

I believe we did.

Sid Tobias47:23

Second, uh moved by Councillor Rogers, seconded by Councillor Lemon.

Sid Tobias47:27

All in favor.

Sid Tobias47:28

Any opposed?

Sid Tobias47:29

Seeing none opposed, motion carries.

Sid Tobias47:32

And I think that brings us down to our action list update, Kim, for the third quarter.

Kim Anema47:38

Thank you.

Kim Anema47:39

I don't have a presentation for you.

Kim Anema47:41

You have the action list as part of the report.

Kim Anema47:44

The intention of the report is to provide council with a status of the various resolutions that council has passed and the progress with which we are proceeding through those decisions made by council.

Kim Anema48:03

The uh recommendation is to receive the report.

Don Brown48:10

Thank you.

Sid Tobias48:11

Uh moved by Councillor Lemon, seconded by Councilor Rogers.

Sid Tobias48:19

Any questions for Kim?

John Rogers48:22

I I think I'll I'll send some questions in through email.

John Rogers48:27

Thank you.

Sid Tobias48:29

Okay.

Sid Tobias48:31

Anyone else with questions on the action list?

Sid Tobias48:39

And Kim, is this um also posted uh on our website or available to us?

Kim Anema48:46

That's kind of it is not.

Sid Tobias48:48

It is not.

Kim Anema48:49

It is only available through the agenda.

Sid Tobias48:51

Okay.

Kim Anema48:52

It's not a document that is um updated uh in real time.

John Rogers48:58

We generally try to update it just prior to council receiving it i mean some departments may on a real time basis update it but that's not been the requirement thanks kim then if council is happy we could move to a vote uh is this going to be an email question or a real question council roger sorry uh i'm trying to you know i looked at uh there's one and it made reference to um if the matters addressed with C 122.

John Rogers49:33

How do i find c one two two isn't is it you know and that's one of the nice things if it were electronic, you know, being able to sort by column or a sort by, you know, um a staff in a in a shorting fashion.

John Rogers49:46

Um is there any clues to how I can find that particular you want to receive it on the agenda in a different sort?

John Rogers49:57

Uh well I um okay, you know, the let me ask the question then.

John Rogers50:02

You know, in um with respect to um gosh, I'm sorry, I'm just trying to find it now.

Don Brown50:17

Okay.

John Rogers50:18

On page two, second is a future report on the North East Park area, and this is the Burnside neighborhood area, West uh hospital neighborhood.

John Rogers50:26

And you know, it said these works are incorporated as part of a project C122.

John Rogers50:29

Um, but I don't know where C122 is.

Kim Anema50:37

So there should be a reference on the um third column from the left.

John Rogers50:43

Mm-hmm.

Kim Anema50:44

So those those are numbers that are assigned to the resolutions themselves, and they should be in numerical order.

John Rogers50:51

Okay.

Kim Anema50:54

The intention of the report really is only to let council know what is the status of each one of the items as opposed to it becoming a this uh a discussion item.

Kim Anema51:04

If if council is particularly concerned about the lack of progress or the speed with which we are accomplishing the uh the different decisions by council then this is your opportunity to make comment um we believe that we give the correct priority to the list that is to say we think we understand which ones are the hot items that need to be attended to and if we're not attending to them in the correct order or if you have a particular concern to one of the items you could email myself or or Jennifer Lynn um and we can provide you with an update on specifics of each of the items or any of the items that you have.

John Rogers51:47

Yeah.

John Rogers51:48

Uh in my my and my question the fact that um it's referenced you know that particular one references C122 but I can't find C122 in this unless of course Sarah phoned it.

Sarah Jones52:00

That is a capital project one two two so that it'll be in your budget book projects are capital uh projects and so that's the C for capital.

John Rogers52:11

Okay.

John Rogers52:12

Yeah great thank you.

Sid Tobias52:14

Thank you uh Sarah uh any other questions I'll call the question um move that we receive all in favor any opposed seeing none opposed thank you Kim thank you.

Kim Anema52:31

The CAO update is uh is also a um a document that we provide uh each committee of the whole.

Kim Anema52:38

I don't have a presentation for you.

Kim Anema52:40

Um one item that's not in the uh in the report, I got an email this afternoon.

Kim Anema52:46

We've been without a um a level three building inspector since November of 2020.

Kim Anema52:51

And I'm happy to say that we now have a level three building inspector.

Kim Anema52:55

Our building inspector, Mr.

Kim Anema52:57

Patterson, was successful in completing the requirements.

Kim Anema53:02

And so we can uh perhaps breathe a little easier given we've been under a lot of pressure relative to level three items.

Sid Tobias53:12

Congratulations, Mr.

Sid Tobias53:14

Patterson.

Sid Tobias53:14

That's uh that's amazing news.

Sid Tobias53:16

And uh uh thank you, Kim, for being creative as well, because I know in a very competitive market, particularly for building inspectors, that if uh there's not one, then we have to create the conditions to make somebody successful to achieve that.

Sid Tobias53:32

And I think um I think all of that all of us that work on the outside realize what that creative HR looks like.

Sid Tobias53:40

So thank you for your leadership there.

Sid Tobias53:42

That's that's uh wonderful news.

Kim Anema53:44

If council members have questions regarding the report, the team is here to respond.

Sid Tobias53:49

Council Rogers.

John Rogers53:51

Uh no particular questions.

John Rogers53:53

Uh just uh again, uh great thanks for the um the effort of staff and and uh to arrange the um revitalization of the uh Atkins Tunnel artwork.

John Rogers54:02

Uh I know that the public has sent in their thanks for that, and uh I think that that's really excellent to see happen.

John Rogers54:08

Also uh great to have the uh the best shelters uh coming along, the pads uh going in.

John Rogers54:13

Uh that's perfect and and hopefully we don't repeat sanites' problem um the um lastly peninsula seems great to see their work um the evidence of their work is is quite obvious with hospital creek and to take that that um restoration achieved a hospital creek we will probably see uh those benefits in V Row Craigower Creek pretty soon so again thanks for the coordination and cooperation on that thank you councillor Rogers Councillor Levin I just want to thank you and acknowledge that this is very likely your last CAO report.

Gery Lemon54:54

So thank you, Kim thank you thank you.

Sid Tobias54:59

Thanks, folks.

Sid Tobias55:00

Uh did we get to a motion?

Sid Tobias55:03

Uh too many motions, receipt.

Sid Tobias55:05

I think we've got a mover and a seconder.

Sid Tobias55:06

All in favor receipt to the CAO's report.

Sid Tobias55:09

Any opposed?

Sid Tobias55:11

Seeing none opposed.

Sid Tobias55:12

Motion carries.

Sid Tobias55:14

Um I think this brings us back to new business.

Sid Tobias55:19

We're down to new business.

Sid Tobias55:21

Um and uh wanted to bring this one up.

Sid Tobias55:25

Of course, UBCM is concluded now.

Sid Tobias55:28

Um I know there was a bit of a frenzy trying to reduce our operational costs, particularly as a council, uh, and restrict opportunities uh to attend um conferences that are only getting more expensive.

Sid Tobias55:44

There's no question about that.

Sid Tobias55:47

Uh, even the registration fee for UBCM, I think was something like $1,700.

Sid Tobias55:53

And then you add on the hotel and even add a discount and your transportation.

Sid Tobias55:59

And uh I know we've been uh each counselor uh has traditionally had about $5,000 to um, you know, attend those things that we need attending.

Sid Tobias56:11

That goes by very quickly.

Sid Tobias56:13

So likely you get one shot out of the deal, uh, particularly if there's travel involved.

Sid Tobias56:18

Um, so I'd like to revisit that.

Sid Tobias56:20

And I I know a note staff's recommendation that we move that to the the budget um uh deliberations that we're going to to do later on.

Sid Tobias56:29

And I I certainly support that, but uh nothing more than to bring it up.

Sid Tobias56:34

UBCM uh I think was a worthwhile worthwhile uh for me to attend.

Sid Tobias56:39

Uh associated with that uh was the uh BC municipalities insurance uh annual general meeting, which is um uh you're voting on the essential leadership and and any directions that that they require in their AGM.

Sid Tobias56:56

Um but I certainly looking at the what I know right now, AVIC will be in Victoria, so there'll be very little cost associated with transport there, obviously parking or or or meals and registration fees.

Sid Tobias57:09

Um UBCM again will be in Vancouver next year.

Sid Tobias57:13

Um affordable as a shot deal.

Sid Tobias57:13

Um and FCM this year, I believe, is in Calgary.

Sid Tobias57:22

So again, not uh arguably your flight to Vancouver might be more expensive than your flight to Calgary, depending on how you're flying.

Sid Tobias57:30

Uh so they're achievable.

Sid Tobias57:31

And I just wanted to put that uh out there.

Sid Tobias57:34

The only thing I would ask council to consider is that maybe we have a discussion more fully during the budgeting process, but it would be great to know in advance who wants to be an AVIC contingent uh contingent, a UBCM, because there were times where I could have used support that there were two concurrent things going on at the same time that View Royal could have been you know represented or at least hearing those things.

Sid Tobias58:04

So um AVIC is also one of those things, although I don't think there's much uh the things are separated out a little bit better than than UBCM where they try to stack them in.

Sid Tobias58:15

Um, but uh looking forward to have a fulsome discussion about that because I think there's even with saving money, I think we're in roles to provide governance, and increasingly that governance is um representing the town, uh, either you know, having our say in resolutions uh or uh or some greater discussions about uh creating new resolutions that that occur uh in the event.

Sid Tobias58:43

So um food for thought, but willing to open it up for a bit of a discussion now, but no decision I don't think needs to take place until we hit the budget time.

Sid Tobias58:52

Counselor Brown.

Don Brown58:54

Yeah, I know that uh counselor Mattson Rogers and myself were delegates for supposed to be on that committee for the insurance.

Don Brown59:01

So obviously you had a goal because you're the only one there.

Don Brown59:04

So I could see there's there'd be times when there's a conflict.

Don Brown59:07

Um, and I obviously there's three years left in our terms, and there's six counselors.

Don Brown59:11

So my suggestion, again, I know we'll discuss it more fully later on, but if if two counselors and yourself went to to the uh AGM, it would be good.

Don Brown59:21

It would also be nice to see the agenda well ahead of time because sometimes there may be specific items on that agenda that would be really interesting to certain people.

Don Brown59:28

I know when I used to go to the uh uh school board annual meetings, the STE meetings, uh um lots of times there was items that were really I thought they were really good, but other times there was I'm looking at it, it's repetitive sometimes.

Don Brown59:42

Make it the same item three or four years in a row.

Don Brown59:45

And uh there were some years there, and I decided I I wouldn't go because there wasn't really anything that interesting.

Don Brown59:51

Uh and even staying the whole day or the whole week, or was it four days, right?

Don Brown59:56

I think sometimes you if people left on the third day or second day, there's another way to help reduce the cost.

Don Brown1:00:03

Thank you.

Don Brown1:00:04

Councillor Levin.

Gery Lemon1:00:06

Yeah, thank you for bringing this up.

Gery Lemon1:00:08

I I think resolutions um are if if we occasionally, as we did last year, put forward resolutions, we need to be there to speak to them, whether it's at AVICC or UBCM, or both in some cases.

Gery Lemon1:00:31

You know, some of them are very fitting that they, you know, because they're they they they have impact the island and with the you know if they go from there with ABICC support, you want to have your proponent there to speak to it as a resolution.

Gery Lemon1:00:46

So I think, you know, to your point on on governance, um, you know, we we appear, you know, less objective and less consequential, I think, on a provincial stage without some presence.

Speaker_Unknown1:01:02

Yeah.

Sid Tobias1:01:03

Thank you, Councillor Lemon.

Sid Tobias1:01:05

Any other thoughts?

Sid Tobias1:01:06

Councilor Rogers.

John Rogers1:01:08

Uh yeah, thanks for let's and I agree with staff.

John Rogers1:01:11

Let's have the discussion when we have a real sense of what uh the next fiscal year is they're gonna loom over us like with bad English.

Sid Tobias1:01:23

Yeah and I think we can uh refer that.

Alison MacKenzie1:01:26

Uh councillor McKenzie, did you have a comment or a thought so when this when we previously discussed it, I I agree that it's not only for um um I guess like personal development to attend these.

Alison MacKenzie1:01:43

It is also for for the town to represent the town to make connections that then allow us to make effective change in in the community.

Alison MacKenzie1:01:52

So I am fully on board with um having more people attend those kind of conventions.

Sid Tobias1:02:02

Can I get a motion to refer this to um well we can we can just say ask Dawn now that uh we budget for 100% um you know for attendance for next year and and to dawn by 100%.

Sid Tobias1:02:21

That means I think the the way we had budgeted before was 5,000 per counselor, was it not for uh representation?

Sarah Jones1:02:34

It was a little bit more than that.

Sarah Jones1:02:36

It was between five and six, and and each member was able to allocate it according to their own wishes.

Sid Tobias1:02:43

Okay, thank you.

Sid Tobias1:02:44

That that's uh that's helpful so that we can bring that up during uh budget uh meeting, but can I get a motion that will plan on a hundred percent uh attendance for 2024?

Gery Lemon1:02:57

So moved.

Sid Tobias1:02:57

Uh moved by counselor Lemon, seconded by Councilor McKenzie.

Sid Tobias1:03:02

Uh all in favor?

John Rogers1:03:03

But can I squeeze the motion?

Sid Tobias1:03:05

Pardon me.

John Rogers1:03:06

I will oppose.

John Rogers1:03:08

Um okay.

John Rogers1:03:09

I I don't think that we know what um the um 2024 budget will be like.

John Rogers1:03:16

And how how we've already had the request that we contribute $25,000 more to um uh fire equipment.

John Rogers1:03:27

And uh that's that's just one small thing to to go for 100% of this when we have no sense of the of the budget.

John Rogers1:03:33

I mean we can have that discussion, absolutely, but we haven't seen the budget, and I would not want to even um propose that we do 100% like all seven members go to UBCM.

John Rogers1:03:47

That's that's not there's not a lot of municipalities that uh are willing to go to that expense.

John Rogers1:03:52

Having more greater attendance, I agree.

John Rogers1:03:55

But uh pinning 100%, assuming that and uh giving the suggestion, 100% attendance of all seven councillors to UBCM absolutely opposed.

Sid Tobias1:04:03

There's there's uh that's not reasonable to the taxpayer I I think the staff recommendation Council Rogers and I hear on this is 100% attendance in 2024.

John Rogers1:04:15

What I've interpreted that to mean is that we would cover off uh with representation UBCM FCM and um and um AVIC not necessarily all of us would go to all of them but there would be representation from the town uh for all three uh of those um conventions so it better um I would be uh urging the mover and secondary to say that we would um enter in discussions and increasing the amount um but um you know as as the motion stands uh i don't think we're doing the taxpayer any benefit um by even suggesting even even attending um fcm that's um that's a huge expense so um it's problematic i mean i i guess it'll be coming up to to council this particular motion but i would be definitely speaking against uh the motion if it's at 100 percent as it stands now okay so i think we've voted.

Sid Tobias1:05:18

I note that you're um not in favor, Councilor rogers, and this will obviously be revisited when we get into budget deliberations, um, exactly what that looks like, and we can have a fulsome discussion, I think, on representation.

Sid Tobias1:05:33

Um, so thank you for that.

Sid Tobias1:05:36

And I think we go to candidates in future election item B under new business and councillor McKenzie, would you be happy to talk to that?

Alison MacKenzie1:05:46

Yes, thank you.

Alison MacKenzie1:05:47

So this is uh by future motion, but I wanted to raise it uh sooner rather than later, just because I know if we do decide to go with it, it would involve a bit of work.

Alison MacKenzie1:06:00

And so just to give you, and so we don't need to discuss it tonight necessarily, but just to let you know, um, thinking ahead already to the the next election.

Alison MacKenzie1:06:10

Um yeah, just given that we grew in size with council, we want to make sure that we have a good selection of uh candidates.

Alison MacKenzie1:06:17

We're not just you know having people by by default, I guess, and also increasing the diversity of of our councils.

Alison MacKenzie1:06:25

So what thinking what we could do um to help with that.

Alison MacKenzie1:06:29

And there was some examples, such as in uh Vancouver, you know, doing some mock council experience.

Alison MacKenzie1:06:35

So I I note here that staff say that there are they are will be discussing increasing candidate pools at um upcoming regional corporate officers meetings.

Alison MacKenzie1:06:45

So um yeah, this discussion can wait until after that, if that works.

Sid Tobias1:06:52

Uh thank you, Councilor mackkenzie.

Sid Tobias1:06:54

One of the thoughts that I had before the next election was to provide a separate form for potential seek potential candidates and have an open forum where they could ask counselor counselors and the mayor what's your commitment in time look like what does you know all of the questions that you don't um you know get from reading um uh extensively kind of that shared experience of living and uh thought that would be um you know uh would try to expand our pool a little bit but I think yours goes beyond that councilor McKenzie so I'd be happy to have that discussion when it comes up um because I I think out of um all all of council there'd be some of this that that won't run uh for for the next election there there may even be opportunities for a by-election in this period because nobody knows what what the next few months brings in people's lives that's just reality um so yeah I'd be definitely supportive of this any other comments or questions counselor Brown yeah I think it's uh important for all of us to to promote that all the time so whether you're in a um service club or I know mayor to buyers you made an excellent uh speech at the VRL elementary school I have a neighbor that's in grade five and he asked me some questions about council about why we were there.

Don Brown1:08:18

And you know, I was there.

Don Brown1:08:19

I didn't say anything, but you did.

Don Brown1:08:21

And he asked me questions, what was the mayor doing and stuff like that.

Don Brown1:08:23

That's when he agreed five kid.

Don Brown1:08:24

But anytime you get a chance to to in the public, uh any events we go to, um, and friends, you're gonna they're gonna ask what you what do you do?

Don Brown1:08:29

And that's important to encourage and and to get people from the broader community, certainly.

Don Brown1:08:38

I I agree a hundred percent.

Sid Tobias1:08:41

I I think you're confusing a speech with me legitimately asking what a mayor should be doing, and I got no.

Don Brown1:08:47

Well, I kind of wondered.

Sid Tobias1:08:48

I don't really know it was good.

Sid Tobias1:08:53

Uh thank you, Council McKenzie.

Sid Tobias1:08:54

And I think we've got a late item, and that's uh an advisory committee discussion.

Sid Tobias1:09:02

Um and I think, you know, a bit of a background to that uh was uh, you know, the original advisory committee um appointments that we looked at.

Sid Tobias1:09:14

I guess it would have been November of last year.

Sid Tobias1:09:22

And, you know, was the committees meeting our need.

Sid Tobias1:09:25

And it's our obligation every once in a while to look at how we're structured as a council around the committee of the whole and what our assignments are that we review, of course, on a regular basis, but also the roles of the advisory councils, particularly of concern were I think uh not meeting was was a concern at the time or having meetings canceled, not having anything on the agenda.

Sid Tobias1:09:53

Recently, we heard in our agendas that people were concerned that they didn't have the right expertise to be reviewing a document.

Sid Tobias1:10:03

And um uh I spent some time talking with other mayors, and they do quite an extensive onboarding session.

Sid Tobias1:10:11

And one of the things that they talk about is that we want your opinion as a person, as a resident, not as a subject matter expert, where we've got subject matter experts.

Sid Tobias1:10:21

We're looking more like does a roundabout make sense here?

Sid Tobias1:10:26

Or where is it on our priority list?

Sid Tobias1:10:28

You know, uh those other things and thinking um, you know, outside of the decision making uh general uh issue.

Sid Tobias1:10:36

So uh I had earlier prepared um a possible plan uh that we could execute.

Sid Tobias1:10:44

We've sent that to committees.

Sid Tobias1:10:44

Um we heard back some feedback from just too many committees uh within that, but they like some of the the parts of the structure.

Sid Tobias1:10:56

So I think where we're at now is we come into a time where we'll be looking for revising our committee members, which we've delayed for a year, right?

Sid Tobias1:11:08

That which should normally be under review.

Sid Tobias1:11:11

Um and I think in November for the the new folks to start in January, we're going to have to line up um a uh what we want to do next.

Sid Tobias1:11:22

Do we want to dust off the plan that I came up with and modify that to meet our needs?

Sid Tobias1:11:29

Uh, because there's two things there's the general plan and there's also the policy um uh about it.

Sid Tobias1:11:36

Uh some other concerns we've heard that uh folks wanted to meet in per or some folks wanted to meet in person advice online.

Sid Tobias1:11:46

And of course, do we have the staff resources uh to accommodate that?

Sid Tobias1:11:51

Could it be hybrid if somebody wishes, you know, Council McKenzie to your earlier points about if somebody wanted to be a committee member, but they're uh challenged with balancing home care or child care or or jobs or whatever, but they could uh you know participate online.

Sid Tobias1:12:08

Um and so these are all questions that have bubbled up from the committees themselves.

Sid Tobias1:12:14

So the in the first place was my observations about the effectiveness of a committee.

Sid Tobias1:12:20

Um and we're asking them to do a bit more, and I think rightly so, Councilor McKenzie, about some things going through committee before they get to us, uh, which I do support, particularly if it's a report or something.

Sid Tobias1:12:34

And and I would challenge us, if that's the case, not to refer the thing back to a committee if it came from a committee initially.

Sid Tobias1:12:42

But there's some greater questions, and I was wondering uh what council's thoughts were on how we would like to tackle it.

Sid Tobias1:12:48

Um, because I I tried to propose a a plan uh and we've had some feedback and adjustments with it.

Sid Tobias1:12:57

What do we want to do now?

Sid Tobias1:12:58

Because not only um am I and other members of uh council feeling that perhaps it's underutilized, that we could be doing a better job, but we're now also hearing it from the committee that they would like to see some changes too.

Sid Tobias1:13:15

So just wondering your thoughts, comments, questions?

Sid Tobias1:13:19

Um Councilor Brown and Councillor Lemon.

Don Brown1:13:22

Personally, I prefer the the status quo, but using them more because we rarely, if any, ever refer stuff to committee.

Don Brown1:13:31

And a good example is uh these uh AGMs and stuff we're talking about.

Don Brown1:13:35

I mean, they'd have to have some background information on what they do at those conventions, but it'd be nice to get some feedback on that.

Don Brown1:13:41

And it wouldn't, nothing to come back to us is binding.

Don Brown1:13:44

I mean, I know it's not really official one, but I know Alison there are on that represents the council on that.

Don Brown1:13:44

But uh we we could definitely use the committees we have more.

Don Brown1:13:47

We already we kind of added one with the AC.

Don Brown1:13:54

So um I don't think there's a need to add a uh a whole bunch of new committees, um, unless someone in the current committee say, Well, no, I really would like this focus strictly on environment or strictly on parks.

Don Brown1:14:06

But personally, I haven't heard that.

Don Brown1:14:09

And I don't think we want to have a lot of committees and not a lot of interest.

Don Brown1:14:12

I'd prefer to have lots of interest in and just a fewer number of committees.

Don Brown1:14:17

Councilor Lemon.

Gery Lemon1:14:19

I I think Councillor Brown made much of my the point I wanted to make, but I I a question to you when you when you first presented the the new commit proposed committees um i think there was a lot of interest out there you know in around town um but i haven't heard that since um i haven't had anyone come to me and say you know what i'd really love to be on you know that committee your you've been um um asked to um be the liaison for um so i might i have you heard have you heard a much feedback in the in the months since you put that forward?

Sid Tobias1:15:03

Yeah, I had about a dozen people interested in different specific committees.

Sid Tobias1:15:07

So I think, you know to to don't point, we've got some people that we're not keeping them busy enough.

Sid Tobias1:15:13

But I would argue that, you know, um Councillor McKenzie is probably inundated with uh emails from the environmental side of the committee and the V Royal uh Climate Coalition as well as that environment, you know, there's lots of interest kind of there.

Sid Tobias1:15:30

Um, what I was hoping to be able to provide is that there's some people that um I don't I'm not interested in parks as much, but I am interested in environment.

Sid Tobias1:15:41

I'm not interested in development so much, but I am interested in in transportation or something, right?

Sid Tobias1:15:47

So I I don't think we have the right formula right now.

Sid Tobias1:15:51

I'm not sure what is, and we don't have to solve it all in a single year.

Sid Tobias1:15:56

We could probably tease out what would it look like if we teased out environment and allowed like parks and rec to have a separate committee and maybe others to say the same.

Sid Tobias1:16:10

And I'm open to anything.

Sid Tobias1:16:12

So I think there's an argument to say that people aren't getting involved with committees because they're not the right committees or they're not focused enough.

Sid Tobias1:16:24

And so I think there's that aspect as well.

Sid Tobias1:16:27

And for a large part as well, we're going up against uh going against our own policy for the amount of uh of time that people spend on our committees, right?

Sid Tobias1:16:39

Um I did a term as a chair and a term as a member uh of a committee, and that was a development and planning committee, I think in 2015.

Sid Tobias1:16:50

And I kind of after I was chair, moved left some space for others to come kind of in behind me and do that.

Sid Tobias1:16:58

But we've got many of our members who have been there uh for a while that we've got to be able to refresh with new members, and and uh I think it's a great way to segue into councils if we want to bring up that discussion, and it's a a gateway drug to becoming a counselor or mayor, maybe.

Sid Tobias1:17:16

So uh it's something that we could explore as a way not only of engagement but of uh of giving people experience in kind of the realm.

Sid Tobias1:17:25

Um Councillor McKinsey.

Alison MacKenzie1:17:29

Yeah, I I think from my attendance on PreAC, I I think it's been working quite well.

Alison MacKenzie1:17:37

Um, I can't really imagine separating out even further like environment and and things like that because there's as it is, we already sometimes overlap with CDAC.

Alison MacKenzie1:17:48

So for instance, there was a discussion about a potential playground in a park.

Alison MacKenzie1:17:52

So that fell into ours, but then I also saw it was on the CDAC.

Alison MacKenzie1:17:55

Um, so that's yeah, I think that might be an issue.

Alison MacKenzie1:18:00

And um for me, the issues are more around how the committee can raise an item.

Alison MacKenzie1:18:09

That's uh I've been told, you know, they're they sometimes feel like they can't raise a new item for the the agenda, um, which I think has gotten a little bit better.

Alison MacKenzie1:18:20

And then the other thing is them happening at the same time, pre ac and CDAC, because we can't counselors can't even attend different meetings.

Alison MacKenzie1:18:28

So those were those are more of my two issues that I've seen, but um I'm okay right now with pre ac and CDAC, just the two committees.

John Rogers1:18:38

Thank you, Councilman.

John Rogers1:18:39

Council Rudd.

John Rogers1:18:40

I'm not okay with just the two committees.

John Rogers1:18:43

Um I I think um transportation merits its own.

John Rogers1:18:49

The um and and you need a particular skill set um for that, you know, to be able to read traffic reports and um um uh there's i i think there's enough complexity that uh when the matter goes to cdak they don't have two hours to do it all the transportation portions can take two hours particularly if we're going to expect them to get on site and really assess the uh the implications of what's being proposed and the implications not only for traffic but pedestrians, cyclists, transit.

John Rogers1:19:26

My concern was um was I think quite evident when we did the active transportation plan and that was referred to committee.

John Rogers1:19:34

You know, quite frankly, I don't think they had the skill set to really understand, really delve into even the baseline report, you know, because there was a lot of material there and uh I thought the uh the discussion and revelations were very limited.

John Rogers1:19:52

I think they did an extraordinary job um with the uh mural um deliberations and discussions that was really uh an excellent meeting I was uh most pleased but you know when um when you have committee members that feel compelled to endorse a staff report because they don't feel that they have the expertise or the time to get into the nitty-gritty, then I think the public's disservice there's an element of disservice to really having a full, wholesome discussion on it.

John Rogers1:20:26

So um if uh and and I do think that the policy we have is limited.

John Rogers1:20:32

I think it needs a revision uh to uh bring back some ingenuity, some creativity, um, some self-determination to these these uh these committees.

John Rogers1:20:44

I'm not happy with the status quo, and I hope that um as we evolve through this that we can get um some of that um our residents will really feel that they can uh benefit and benefit the community for.

John Rogers1:20:57

No, I'm not happy with the status quo.

Sid Tobias1:21:01

Thank you, Councilor Rogers.

Sid Tobias1:21:02

Any other comments, thoughts?

Sid Tobias1:21:05

Um what what I'd recommend we consider is maybe um uh from what I've heard from you, um maybe tread cautiously by expanding committees.

Sid Tobias1:21:17

We've asked committees several times for their input on the committees.

Sid Tobias1:21:22

We've also heard some other stuff recently about some of the desires for committees.

Sid Tobias1:21:27

Can I ask that council reviews some of the feedback they've had and that we table this until the November meeting, which kind of um ties in with um with uh around the timing for the selection so we can see what we want to do and direct staff toward that selection, as well as um I think I I would like to have Councillor Mattson's and Counselor Qualitage's uh input in on this as well.

Sid Tobias1:21:59

Counselor Brown.

Don Brown1:21:59

I know we we advertise, which is good.

Don Brown1:22:05

We see what kind of interest you get, but I wonder in their advertising if we could just ask citizens, is there a specific area or areas of interest where you'd like to serve on a committee?

Don Brown1:22:17

And maybe they'll come up with something, maybe three or four people say, yeah, we really like transportation or we have a background in transportation.

Don Brown1:22:23

And then because I I don't want to put it out there and then nobody applies.

Don Brown1:22:28

And and going back to what what what Councillor McKenzie has said, it is a good training ground for people to move up into some see if they're interested in becoming a member of council.

Don Brown1:22:37

So it's also a way of of uh promoting interest.

Sid Tobias1:22:41

Well, I'm just wondering, you know, just roughing off of that, uh, Councillor Brown, I'm wondering if we want to have a survey about an engagement about engagement.

Sid Tobias1:22:50

It sounds kind of meta, but um essentially asking people how they would like to be participate in local government um and and incorporate some of those good questions that you you had there.

Sid Tobias1:23:00

Like uh if you were um thinking about uh uh you know being on a committee, what would that look like to you?

Sid Tobias1:23:08

Uh and and then particularly how can we benefit from that committee as well.

Sid Tobias1:23:12

Um Councillor McKenzie or Councillor Rogers, you had your hand up.

John Rogers1:23:15

Uh yeah, thanks.

John Rogers1:23:16

I I do um agree with staff that um the this is probably a uh strategic planning uh aspect.

John Rogers1:23:23

And and um uh I don't want to um have it as as a committee of the whole agenda.

Sid Tobias1:23:29

I hope that we would um this is important enough uh to increase um our our um public's input in in it giving advice to to council let's take it seriously let's have a workshop on it and let's um uh because looking at other municipalities and and how they do with their advisory committees and and their uh policy and so forth some good stuff out there i'd like really like us to have a look at what's out there and and um be the best we can be okay so uh the only the only reason I wanted to refer it to November, and I think we can do both actions because um uh November we can have uh an opportunity to uh review and I'll remind folks by email just to please revisit and I'll put in some links for those discussions to uh to to have as well as the advice that the committees have given us on the topic of the committees.

Sid Tobias1:24:26

Um and then uh we would uh hit that with a staff recommendation that we revisit it in uh early December.

Sid Tobias1:24:37

Um can I hear from staff?

Sid Tobias1:24:40

Normally the cycle for our committees is I think their last meeting is November, or we open it up in November for new candidates traditionally.

Sarah Jones1:24:52

The ads run in January, and the current terms run typically until the end of February, and then the appointments are done with the effective date March 1st.

Sid Tobias1:25:05

So that strategic planning would dovetail into that timeline as well.

Sid Tobias1:25:09

So any changes we made if we come up with another committee or or whatever, then uh then we do that.

Sid Tobias1:25:15

Um council have you with that approach that we would uh table this discussion just to include uh two other voices for November, get their input and then uh have staff plan to uh put that on to our strategic uh planning uh in December.

Sid Tobias1:25:36

I'll I'll move it.

Don Brown1:25:38

Second.

Sid Tobias1:25:39

Uh all in favor?

Sid Tobias1:25:41

Any opposed?

Sid Tobias1:25:42

Seeing none opposed.

Sid Tobias1:25:44

Uh that carries.

Sid Tobias1:25:44

And I think that brings us down to five minutes to five.

Sid Tobias1:25:50

And uh we've got no correspondence related to this.

Sid Tobias1:25:56

And uh we just need a motion to recess until 7 p.m.

Sid Tobias1:26:01

For those folks who are online, we will be back at 7 p.m.

Sid Tobias1:26:07

Hopefully with uh councillor Qualwich as well joining us.

Sid Tobias1:26:12

Uh moved by Councillor Brown, seconded by Councillor Rogers.

Sid Tobias1:26:15

All in favor?

Sid Tobias1:26:16

Any opposed?

Sid Tobias1:26:17

Seeing none opposed, motion carries.

Kim Anema1:26:20

Good evening, V Royal.

Sid Tobias1:26:22

Welcome to the evening installment um of the October 10th committee the whole meeting.

Sid Tobias1:26:29

I'll call the to reconvene.

Sid Tobias1:26:35

And I think we have no petitions and delegations.

Sid Tobias1:26:39

So that brings us right down to public participation period.

Sid Tobias1:26:44

And I know we don't have anybody in the room.

Sid Tobias1:26:48

Carl, have we got anybody on the line?

Elena Bolster1:26:51

Mayor Tobias, we have no callers this evening so far.

Sid Tobias1:26:56

Okay, so uh welcome uh Councillor Kwalowich and I'll hand it over to you for the parks and Rec.

Damian Kowalewich1:27:04

Good evening.

Damian Kowalewich1:27:05

I'd like to call the parks and Recreation committee to order.

Damian Kowalewich1:27:10

Uh I do not have a chair's report, uh, and I will hand over the floor to Town of View Royal staff for a report on parks space for commercial use.

Ivan Leung1:27:24

Thank you, Chair.

Ivan Leung1:27:25

Ivan Leoung, Director of Engineering and Parks.

Ivan Leung1:27:27

Uh, so I don't have a presentation here, but I can summarize just in brief uh the purpose of this report.

Ivan Leung1:27:33

Um, basically, uh at the one of the previous council meetings, uh staff was to prepare a report on the implications of allowing some commercial activities such as food trucks, markets, um, outdoor fitness yoga meditation classes, uh, musical performances to occur within a view rural park.

Ivan Leung1:27:52

So um, luckily, one of our staff is uh had an event planning experience in Victoria.

Ivan Leung1:27:58

So uh she was able to help me out with the research required.

Ivan Leung1:28:02

So we basically research uh many municipalities within the capital region as to what they do for commercial activities and food trucks and then basically compared that to our bylaws policies to see what gaps exist should council wish to move forward with this.

Ivan Leung1:28:20

But after a bit of an evaluation of certain metrics like such as parking availability of um of space uh mitigation of conflicts and the town was able to identify seven potential parks for small kind of commercial activities, uh, fitness yoga, uh, and then two locations for food trucks.

Ivan Leung1:28:43

Uh, it's all there in the report based on the evaluation.

Ivan Leung1:28:46

Um, there is quite a few things that needs to be done in order to allow for these to happen, though, be quite simply because um these parks are not uh zoned as a permitted use for commercial services.

Ivan Leung1:28:59

So uh the zoning bylaw would need to be updated as a result too, in accordance with the community charter.

Ivan Leung1:29:07

Uh the fees and charges bylaw would need to be updated as well.

Ivan Leung1:29:10

Um, it is recommended that that's engagement be done to understand what uh the the bureau of residents would like to see in terms of amenities, uh, especially for food trucks, picnic areas, and that and all of that will kind of inform on what kind of capital costs and lifecycle costs and maintenance costs and staffing would be required so this document is um for 13 pages is is still high level and the reason why uh we kept it high level is because we're seeking direction from council as to how to move forward so um it's it's all there in the report happy to take any questions thank you Ivan appreciate that uh council the report is before you do we have questions or comments uh merit thanks Ivan uh excellent report and probably just the right level as well um you know, to get us uh started.

Sid Tobias1:30:03

But I think in any of these events, there is a cost associated with the hosting because planning and coordination, unless you hand it over uh the extra facilities that we need, whether it's washrooms, accessibility, uh cleanup, I would imagine is is also a huge thing, uh, policing, ambulance, as well as the that.

Sid Tobias1:30:26

So yeah, being mindful of that, um I'm I'm thankful that you put it together, and it's really good to see what other municipalities are doing, as well as a really good study of where we could potentially host um um these things.

Sid Tobias1:30:42

So happy with uh with the report and um I'm still digesting it and working uh my way around it.

Sid Tobias1:30:51

A comment about uh I know Councillor McKenzie had also brought up a food market, and there is a food market uh or a farm market association of British Columbia that uh offers advice on setup, but the key that they spoke of highly is you need a dedicated coordinator, whether they're volunteer or whether they're paid, because it just doesn't magically come together, particularly for the farm market.

Sid Tobias1:31:19

You need like a full-time person in there to do it.

Sid Tobias1:31:22

Um, but there are some monies available too, and I can afford you that, Councilor McKenzie, if you would like.

Sid Tobias1:31:27

But thanks again, Ivan.

Damian Kowalewich1:31:30

Counselor McKenzie.

Alison MacKenzie1:31:31

Yes, thank you for the report.

Alison MacKenzie1:31:33

I thought it was very thorough.

Alison MacKenzie1:31:35

Um I I think my conclusion out of reading it was that I would like to see us maybe do a pilot before we invest any sort of money into the infrastructure.

Alison MacKenzie1:31:44

I know it's like for the trucks and things like that.

Alison MacKenzie1:31:48

But I think just to see how many people want to use the space, how many businesses want to use it, I would keep it open to all the parks that you've listed that are potential.

Alison MacKenzie1:32:02

And to see to see where people want to hold hold the events.

Alison MacKenzie1:32:05

And then maybe in the future we review it and evaluate if we limit the number of parks.

Alison MacKenzie1:32:10

But yeah, I think a pilot might be useful.

Damian Kowalewich1:32:16

Thank you.

Damian Kowalewich1:32:17

Councilor Rogers.

John Rogers1:32:19

Yeah, uh likewise, great report.

John Rogers1:32:20

I really like the way you've um I um looked at different parks on the on the columns and uh way the uh pros and cons of colons with destination parking and um pedestrian cycling access, and so on.

John Rogers1:32:29

It's um I totally agree.

John Rogers1:32:35

I think a uh pilot is uh is a logical thing to do.

John Rogers1:32:39

Um and I wondered if we might want to think of uh jiving this or coordinating it with the Centennial Parks Master Plan Review.

John Rogers1:32:48

Um I know that um with the uh um the baseball tournament that we had and and uh the number of uh patrons that we uh that did occur came to come there.

John Rogers1:32:59

And I do know that um uh the Bowell Association is uh desperately wanting to upgrade the food alternatives uh to what they have right now.

John Rogers1:33:09

Uh supply and gas and all that stuff in an antiquated building is really a problem.

John Rogers1:33:14

And if it was something that we could jointly support the ball uh tournament organization for their funding and so forth, uh put money back into the field in terms of that master plan and still provide a uh uh uh you know tasty alternatives to the many folks that are there.

John Rogers1:33:35

Um that might be a logical place for um uh for a pilot.

John Rogers1:33:42

What another column that I was thinking uh that might be a consideration is uh, and I'm glad you put residential proximity, also business proximity, because I I was thinking would uh would, you know, and again, Centennial is great because it doesn't have any local businesses that it would be competing against.

John Rogers1:34:01

But um, as I thought of the uh new park on Burnside, um, wouldn't that be an interesting idea?

John Rogers1:34:07

But that would maybe uh because it would help be an alternative for cyclists and so forth, but it would be a competition, I think, to the the uh the nest or whatever that um coffee shop is.

John Rogers1:34:19

So that's uh that's another consideration that um uh to to weigh.

John Rogers1:34:24

But I would personally like to see the pilot as um as a um a component of a centennial parks master plan.

John Rogers1:34:35

Thank you.

Damian Kowalewich1:34:38

Councillor Lemmon.

Gery Lemon1:34:40

Thank you.

Gery Lemon1:34:41

Um truly to to echo everyone else.

Gery Lemon1:34:44

Really, really thorough, good report.

Gery Lemon1:34:44

Thank you, staff.

Gery Lemon1:34:48

When I think of food trucks, for me that's kind of synonymous with an event, you know, a cultural celebration or a community celebration.

Gery Lemon1:34:57

So it and that to me limits the kind of space that where we where we could handle that.

Gery Lemon1:35:05

I don't see, for example, a food truck going to, you know, yoga in the park.

Gery Lemon1:35:11

So I perhaps if, you know, as a pilot, and and I'm just, you know, this is just I'm just going forward here.

Gery Lemon1:35:22

As a pilot, if we if if you know there was some kind of larger community gathering, perhaps arranged by the community, perhaps it doesn't have to fall to us.

Gery Lemon1:35:33

Um, that would be a good testing site, testing ground for food trucks.

Gery Lemon1:35:39

That's all.

Gery Lemon1:35:39

Anyway, great report.

Gery Lemon1:35:41

Thank you.

Gery Lemon1:35:41

Lots of food for thought, and I'm still digesting.

Don Brown1:35:48

Council Brown.

Don Brown1:35:50

Yeah, I think it's a great opportunity.

Don Brown1:35:51

Also a great report to get some music events.

Don Brown1:35:54

It'd be awesome to get some music events if we could coordinate with the other municipality.

Don Brown1:35:57

You know, Sands does it, Esquamble does it, Sydney.

Don Brown1:36:01

I'm trying to think of some of the other ones I've been to, but they have really good music events.

Don Brown1:36:03

Obviously, we wouldn't want the two of the same day kind of thing, but uh great opportunity for up and coming bands and uh and it does attract the people, especially when it's free, free event, and then the food trucks will come as well, I'm sure.

Don Brown1:36:14

Thank you.

Don Brown1:36:15

But great.

Don Brown1:36:16

Thanks very much.

Damian Kowalewich1:36:21

Uh pretty clear message for you to go away with.

Damian Kowalewich1:36:25

Uh, I've got nothing more to add.

Damian Kowalewich1:36:26

I concur with uh my colleagues.

Damian Kowalewich1:36:28

I think an exploratory pilot uh project-ish type uh endeavor is probably something that we all uh can support.

Damian Kowalewich1:36:37

Can I get a motion to uh receive the report from staff?

Damian Kowalewich1:36:43

Second moved by councillor Rogers, seconded by Lemon.

Damian Kowalewich1:36:47

All in favor, opposed, that's carried.

Damian Kowalewich1:36:49

That concludes the parks and Recreation committee.

Damian Kowalewich1:36:52

I will hand the chair to Councillor McKenzie.

Alison MacKenzie1:36:56

Thank you.

Alison MacKenzie1:36:57

I'll call the environmental committee to order.

Alison MacKenzie1:37:01

I do have a little bit of a chair support.

Alison MacKenzie1:37:04

I just wanted to give some uh a gist of what uh was discussed at the CRD Intermunicipal Climate Action Task Force that I attended at the end of September.

Alison MacKenzie1:37:15

Uh so the CRD are is working on a lot of things, um, currently working on extreme heat vulnerability mapping, uh, climate projections for the capital region, and as part of their e mobility programming, the CRD is working with BC Hydro to identify uh locations for public charging in collaboration with different municipalities.

Alison MacKenzie1:37:39

So perhaps if we know of anywhere that we can feed that to staff.

Alison MacKenzie1:37:55

And out of that, you might have seen Victoria raised an interesting motion that kind of put an action onto CRD to come up with some innovative ideas on how we can reduce the CRD's GHG emissions.

Alison MacKenzie1:38:10

So yeah, there uh CRD has to take that away and figure out how to do that.

Alison MacKenzie1:38:16

And then we had a discussion around uh the zero carbon step code.

Alison MacKenzie1:38:22

They actually had a picture of our media release on the screen in the meeting.

Alison MacKenzie1:38:27

And when we went around the table, um all the municipalities were either having their staff look into it or had done it.

Alison MacKenzie1:38:37

So I think we're definitely a leader and a lot of people are looking to follow us.

Alison MacKenzie1:38:43

So and finally just to give a plug for uh quite an interesting program that the CRD offers um it's called the Regional Home Energy Navigator Program.

Alison MacKenzie1:38:56

So everyone can access in the CRD can access it for free.

Alison MacKenzie1:39:01

If you have a single home I it uh gives you resources to determine how to improve the energy um consumption in your home.

Alison MacKenzie1:39:11

So yeah.

Alison MacKenzie1:39:13

Um, and I think I have no other items under me.

Alison MacKenzie1:39:21

So for the planning, development and engagement, I will hand to um oh do I oh yes, sorry, there we are.

Alison MacKenzie1:39:29

Um for staff report, I'll hand to the director of engineering for urban forest strategy terms of reference.

Ivan Leung1:39:39

Thank you, Chair.

Ivan Leung1:39:40

I'm the young director of engineering and parks again.

Ivan Leung1:39:42

So uh this report is uh about the urban forest strategy terms of reference.

Ivan Leung1:39:47

So at the time of uh budget deliberations for 2023, council has directed staff to um provide counsel with the terms of reference before going out um for RFP.

Ivan Leung1:39:58

So uh again, same idea as the previous report.

Ivan Leung1:40:02

A lot of research was done on the urban forest strategies that were done in the surrounding municipalities that are recent in nature.

Ivan Leung1:40:09

Also taking a look at some of the nice to have ones that were done in the mainland.

Ivan Leung1:40:15

But all the information's in there, we did our best to try to gauge how much we can get done with the bit with the budget allotted.

Ivan Leung1:40:33

But that's about as far as we got.

Ivan Leung1:40:35

Um, as part of the RFP process.

Ivan Leung1:40:38

Should we go down that route?

Ivan Leung1:40:39

Um, we will go back to council for award.

Ivan Leung1:40:41

But uh, terms of reference, the draft is there for your review.

Alison MacKenzie1:40:44

Yes, uh Mayor Tobias.

Ivan Leung1:40:45

Happy to take any questions.

Sid Tobias1:40:51

Uh I've got a couple, uh Ivan, and thanks for this.

Sid Tobias1:40:54

Uh, very much appreciate the opportunity to look this over.

Sid Tobias1:40:57

Does this include um Thetis Lake Park at all as well, or do we just consider that CRD and CRD would handle it?

Ivan Leung1:41:08

Uh that's a very good question.

Ivan Leung1:41:10

So because part of Theus Lake is within the town boundaries, it would be included.

Ivan Leung1:41:17

Um throughout the journey of this report, uh, staff would engage with the CRD to make sure that there is no overlap or if there is any shared resources so that we can focus less on that because they're already doing that job and then we can we can uh spread resources elsewhere.

Ivan Leung1:41:34

So that's uh the anticip what the anticipated action items are.

Sid Tobias1:41:38

Um thanks for that because I know that we just um had an update last week and about to revisit it tomorrow um on it, and it seemed like we might even be ahead of them a little bit when it comes to developing a strategy.

Sid Tobias1:41:52

I know that uh last year they had LIDAR uh available as well.

Sid Tobias1:41:59

So would be the plan to incorporate some of the data sets that we might already have access to to um this strategy as well.

Ivan Leung1:42:07

Yeah, through the chair, I believe so.

Ivan Leung1:42:10

We'd be using the data that uh the CD shared with us a couple of years ago.

Ivan Leung1:42:15

Um I do know that it utilizes uh GIS data um which may have been based on LIDAR.

Ivan Leung1:42:22

Uh the value of more current lidar is dependent on the land changes that have happened recently.

Ivan Leung1:42:29

So um in some neighboring municipalities that have developed it quite rapidly they were they had to um basically spend extra money to do uh more LIDAR quite simply because the data from two years ago was no longer relevant.

Ivan Leung1:42:44

So that's likely not the case here in View Royal.

Ivan Leung1:42:47

The amount of development that's happened here is bit is a little less so, and we can make some assumptions based on that.

Ivan Leung1:42:53

But um part of this RFP process will will to be in to allow um successful proponents or bidders to take a look and um figure out what they can do with money, and that if they if they wanted that additional service of more LIDAR, then that would be something brought forward to council at that time.

Sid Tobias1:43:12

Okay, last question that's two part, if that's okay.

Sid Tobias1:43:16

Um I I've noticed that uh with the CRD releasing their preliminary um uh heat mapping, uh literally heat mapping and not just the procedure of of looking at something, but actually heat mapping from the asphalt.

Sid Tobias1:43:32

It was really clear when I was looking at they've released it for um the regions, and it was really clear that anything that was unforested was glowing red.

Sid Tobias1:43:42

Um and anything with three canopy was less so to a point where it was almost cool.

Sid Tobias1:43:50

And I know CRD is going to release some of that.

Sid Tobias1:43:53

Could we integrate some of their work into this plan as well if it's data sets that already exist?

Sid Tobias1:43:59

And I'll hit you with my second part.

Ivan Leung1:44:02

Short answer is yes.

Ivan Leung1:44:04

So the terms of reference of the draft that we have here would require the successful consultants to consider climate change in their urban forest strategies of where to plant trees.

Ivan Leung1:44:15

It's a little more generalized than looking at pavement.

Ivan Leung1:44:19

It also looks at open spaces and parks and that.

Ivan Leung1:44:22

Certainly, it could be something that uh can be asked of the consultants to also consider within roads and pavement.

Ivan Leung1:44:28

Um, and that's not only public property, but also can be private property based as well.

Ivan Leung1:44:34

So I do know that the terms of reference does include a recommendation for or for the successful consultant to recommend changes to the OCP with respect to urban forestry and that could that could also inform on that.

Sid Tobias1:44:46

Perfect last part.

Sid Tobias1:44:48

And and thank you for that.

Sid Tobias1:44:50

The one of the the areas that a biologist brought up to me was the types of trees we're replanting in that often our our our birds and and everything won't nest in trees that might look good to us but aren't one of our native species.

Sid Tobias1:45:11

So we're thinking we're doing good, but we're actually restricting their habitat even more.

Sid Tobias1:45:16

Will that be included?

Sid Tobias1:45:18

Kind of a biological native species lens on our strategy.

Ivan Leung1:45:24

Yeah, so the one of the components of the urban forest strategy is to find out a way to improve and enhance not only the urban forest, but its habitat and to um maintain and provide resilience to the biodiversity that we have.

Ivan Leung1:45:46

But there are anecdotal evidence, for example, cedars being in decline as a result of climate change.

Ivan Leung1:45:53

And those are elements that uh and that's elements of the type that uh we would want the urban forest strategy to inform us on.

Ivan Leung1:46:00

Thank you very much, Ivan.

Ivan Leung1:46:01

Thank you, Chair.

John Rogers1:46:02

Yes, Councillor Rogers?

John Rogers1:46:04

Yes, thanks.

John Rogers1:46:05

Um reviewing the background and and the materials that we're providing, I think that's really great.

John Rogers1:46:11

Um, particularly, of course, the uh the climate action strategy, and and uh you know, as as we're hearing from um from others on on what the CRD is working on, um, the heat mapping is is certainly a concern with the the drought and and the survivability of of the species that we've uh known yesterday.

Ivan Leung1:46:33

And what um how far out um are we asking the um uh the agency to project forward in terms of uh what what our forest there are we are we doing what would look like at 2035 2045 um you know and um the methodologies to plan and protect um yeah through the chair that's ballpark i think i don't know the exact um exact year look forward that we're looking at but most urban forest strategies that has been reviewed have looked under a short term lens so within zero the 10 years and also the long term lens so looking at 2050 uh our likes of that um certainly uh you know, when looking further into 2050, 2100s, uh, some assumption assumptions need to make be made in terms of temperature and and heat.

Ivan Leung1:47:24

Um, but the the data is out there that's uh consultants are able to uh project to probably the next 20 or so, 20, 30 years as to uh what plans, um what strategies that town can can do.

John Rogers1:47:40

And we certainly we've we've heard about the um uh the health benefits of uh shading and um and you know protecting the trees for that, but I also appreciate in the out to uh in objectives uh uh two to F, whatever the page is, um, assessing the the changes to um develop a methodology of calculating dollar value and carbon sequestration.

John Rogers1:48:02

So that's uh I I really appreciate that value being uh placed on, and that will help guide us, I think, in in ensuring a a reasonable protection and uh um you know going forward.

John Rogers1:48:14

The um I'm also looking towards um the engagement and deliverables.

John Rogers1:48:19

Um again, I look forward to a baseline condition report.

John Rogers1:48:22

If it's as good as the the uh active transportation plan, this this will be uh I think very useful.

John Rogers1:48:28

Um the community survey, excellent.

John Rogers1:48:31

Um and the in-person engagement, um you've got the is that uh where at the end the public gets to have an open house and see what um what it's all about.

Ivan Leung1:48:42

A public open house is uh one tool that is considered in-person event.

Ivan Leung1:48:47

There are also other tools available.

Ivan Leung1:48:49

So at this time, um the idea is to leave it up to the consultants to tell us what's the best form of engaging in person.

Ivan Leung1:49:00

Because there are other ways of informing in person that's not necessarily an open house.

John Rogers1:49:07

Okay.

John Rogers1:49:08

Well um I know that uh REAC parks our parks advisory committee is is very um focused on this and and I'm sure very happy to see this thing going forward.

John Rogers1:49:19

So I I'm I'm looking forward to you know when when time comes that we're able to make this referral and and hopefully they're going to be available to hear that presentation and and give us um the the benefit of their thoughts as well.

John Rogers1:49:32

Hopefully that'll be part of the process.

John Rogers1:49:36

So thanks again.

John Rogers1:49:38

Looking forward to it.

Alison MacKenzie1:49:39

Great.

Alison MacKenzie1:49:40

Um, any other questions, Councillor Lemmon?

Gery Lemon1:49:42

Quickly.

Gery Lemon1:49:43

Uh thank you.

Gery Lemon1:49:44

Uh yes, that's correct.

Gery Lemon1:49:45

Uh staff, this is this year's money, right?

Gery Lemon1:49:52

Okay, so the so the RFP would go would would go out within well before the end of the year.

Ivan Leung1:49:58

Yeah, I I I wish I could say that as soon as council adopts this, that I just send a send button, but it requires a little bit more work, but it's gonna it would come pretty soon.

Ivan Leung1:50:07

Probably will require a little bit of carry over into next year's budget.

Ivan Leung1:50:09

So I'm talking to I'll be talking to Director Christensen about that.

Gery Lemon1:50:12

Okay, good, good to know.

Gery Lemon1:50:14

Thank you.

Gery Lemon1:50:14

Thank you for the work.

Alison MacKenzie1:50:16

Great.

Alison MacKenzie1:50:17

Any other questions before I ask for a motion and then open it up to discussion?

Alison MacKenzie1:50:26

Okay, so moved by councillor Rogers and seconded by Mayor Tobias.

Alison MacKenzie1:50:29

Opening up for discussion.

Alison MacKenzie1:50:33

Any further comments?

Alison MacKenzie1:50:35

No, uh I'll just add mine.

Alison MacKenzie1:50:38

I just want to caution that I hope this report um really or the report that's produced really focuses more on the future and recommendations and not at so much on the current inventory and data.

Alison MacKenzie1:50:57

Like I think it's important to have that but I I don't think that's what we what's the most important.

Alison MacKenzie1:51:04

I think it's more okay what do we do about it.

Alison MacKenzie1:51:07

Um and I know there's already sources of different data for that.

Alison MacKenzie1:51:12

And I know the View Royal Climate Coalition has done a bit of analysis with what's available.

Alison MacKenzie1:51:18

So yeah, if if that makes sense, just kind of not focus the majority of the report on that.

Alison MacKenzie1:51:24

I think it's more about the future.

Alison MacKenzie1:51:26

Um okay, so uh there's a motion on the table.

Alison MacKenzie1:51:30

So all in favor.

Alison MacKenzie1:51:32

Okay, opposed?

Alison MacKenzie1:51:33

No.

Alison MacKenzie1:51:34

Okay, and that's carried.

Alison MacKenzie1:51:35

Thank you, Chair.

Alison MacKenzie1:51:36

Okay.

Alison MacKenzie1:51:37

And now um I will pass for the planning, development, engagement committee over to Mayor Tobias.

Alison MacKenzie1:51:45

Are you taking over for Councillor Rogers or um Matson?

Sid Tobias1:51:48

I I will.

Sid Tobias1:51:50

Um uh course, Councilor Matson is uh out sick um this uh week.

Sid Tobias1:51:56

So uh I don't have any chair's report motions or business arising from previous minutes, so I think we can go down to uh Leanne, were you going to present on the secondary suite type one and two permits?

Leanne Taylor1:52:38

I'll start that again.

Leanne Taylor1:52:38

Good evening, Mayor Tobias and members of council.

Leanne Taylor1:52:41

My name is Leanne Taylor and I'm the Director of development Services.

Leanne Taylor1:52:44

This evening I will be presenting on the town's current secondary suite program.

Leanne Taylor1:52:49

The purpose of this presentation is to provide the committee with information, analysis, and recommendations for proposed changes to type 1 and type 2 secondary suite permits and proposed bylaw amendments to the existing secondary suite permit bylaw, the fees and charges bylaw, and the municipal ticket information bylaw.

Leanne Taylor1:53:10

First off, I'll give a bit of a background.

Leanne Taylor1:53:13

In 2006, the town established a secondary suite program, which included the adoption of the secondary suites permit bylaw.

Leanne Taylor1:53:21

The intent of this bylaw is to require a homeowner with a suite to obtain a type 1 or type 2 secondary suite permit, which are defined as type 1 is a permit issued for a secondary suite that complies with the BC Building Code, and these are the permits that we issue today.

Leanne Taylor1:53:39

Type 2 is a permit issue that were issued before September 1st, 2007 for a secondary suite that does not comply with the BC Building Code.

Leanne Taylor1:53:50

Should an homeowner wish to carry out any upgrades or renovations to their existing suite, they would be required to comply with the secondary suite regulations in the BC Building Code of the day, provided that a building permit is required for the proposed works.

Leanne Taylor1:54:05

Every person wishing to obtain a permit for a secondary suite must do so by making an application to development services and paying a fee of $150.

Leanne Taylor1:54:15

Once a permit is issued, it must be renewed annually before March 1st.

Leanne Taylor1:54:19

The owner must complete a renewal application and pay an annual fee of $100.

Leanne Taylor1:54:24

There are currently 201 type 1 permits and 245 type 2 permits.

Leanne Taylor1:54:29

And I just want to note that the town no longer issues type 2 permits.

Leanne Taylor1:54:34

That was just at one point in time when the secondary suite program was established.

Leanne Taylor1:54:39

And it was to give some of those suites that a bit of a grace period for those secondary suites that may have not complied with BC Building Code and were constructed likely prior to the incorporation of the town of V Royal.

Leanne Taylor1:54:56

V Royal and North Stanich are the only two municipalities in the Capitol region that require secondary suite permits.

Leanne Taylor1:55:03

In North Stanich, every homeowner of a single family dwelling that contains or is to contain a secondary suite must hold a valid and current secondary suite permit.

Leanne Taylor1:55:12

Upon issuance, provided that a permit has not been revoked or suspended, that's the secondary suite will be permit will be automatically renewed annually on January 1st without a charge.

Leanne Taylor1:55:24

The one-time fee in North Stanich is $100.

Leanne Taylor1:55:27

For the other 11 municipalities in the region, only a building permit is required to confirm compliance with the zoning bylaw and the BC Building Code to authorize a secondary suite.

Leanne Taylor1:55:41

There's a lot of information on this slide, and there is it's more it's easier to read in the report.

Leanne Taylor1:55:48

But here I just want to highlight the various tasks that are associated with administering the secondary suite program.

Leanne Taylor1:55:58

So, as noted in the report, the program has been for has been enforced for over 617 years, and when it was first implemented, it complemented the town's new secondary suite regulations and received support from the community.

Leanne Taylor1:56:13

In the staff report, it does indicate that this program currently consumes approximately 80 hours of staff time.

Leanne Taylor1:56:20

However, the administrative costs are significantly underrepresented in this table, and it was brought to my attention that after the report was published that there is an additional 95 hours of approxim of additional staff administrative time associated with managing this program.

Leanne Taylor1:56:38

So on average, the number of hours is closer to 165.

Leanne Taylor1:56:42

However, this does not take into account the anomalies that staff have to deal with, and therefore the total number of hours could potentially be more depending on the types of inquiries and issues that we may have to deal with as part of administering this program.

Leanne Taylor1:57:00

But the point is that it does take a significant amount of staff time to the program where secondary suites can be regulated and legalized through the building permit process.

Leanne Taylor1:57:13

So essentially, town staff is doubling up on some of the administrative and review processes for type 1 secondary suite permits.

Leanne Taylor1:57:21

And as noted earlier, building permits are the tool other municipalities use to legalize and keep track of secondary suites.

Leanne Taylor1:57:31

This evening staff is recommending three proposed changes to the secondary suite program.

Leanne Taylor1:57:36

The first change is that the town eliminate the requirement for type 2 secondary suite permits, including the renewals for the reasons noted in the previous slide.

Leanne Taylor1:57:47

The second proposed change is to consider doubling the annual renewal fee from $100 to $200 for type 2 permits to incentivize homeowners to bring their suites up to current BC building code by applying for a building permit, and this will slowly terminate type 2 permits.

Leanne Taylor1:58:06

Should council wish to increase the renewal fee for type 2 secondary suite permits, then staff recommend deferring the increase to the 2024 to 2025 renewal cycle to give homeowners an opportunity to become aware of that change.

Leanne Taylor1:58:21

The third proposed change is to carry out housekeeping amendments to the fees and charges and municipal ticket information bylaw to reflect the above changes noted on the screen.

Leanne Taylor1:58:31

As we know, um, secondary suites do play an important role in helping homeowners to um home buyers to offset the cost of mortgages, keeping families close, and providing additional rental housing for people in the community.

Leanne Taylor1:58:44

Um so staff has provided a recommendation.

Leanne Taylor1:58:48

However, um, should council not wish to proceed with all of the recommendations, there are alternative options for the committee's consideration this evening.

Leanne Taylor1:58:58

Thank you.

Sid Tobias1:59:01

Thank you, Leanne.

Sid Tobias1:59:02

And uh just before I get into questions, is it um I'm hearing two things from the province right now.

Sid Tobias1:59:08

One is that um the uh they're looking to streamline particularly suites, they're offering loans to uh provide.

Sid Tobias1:59:18

I think if if if you do rent it out for a period of time, they're willing to compensate for that.

Sid Tobias1:59:24

So how will that affect what you're doing here?

Sid Tobias1:59:27

Will it complement and streamline, or are we just duplicating a process that we might have to adjust to?

Leanne Taylor1:59:36

Through the chair.

Leanne Taylor1:59:37

The um my understanding of the um financial, I guess, support from the province is they're they're providing um like a uh a grant or a loan to um homeowners wishing to install suites.

Leanne Taylor1:59:52

Um, they have to rent them at a slightly below market.

Leanne Taylor1:59:56

Um, and so that is a separate program.

Leanne Taylor1:59:58

Um, what is being proposed here is that um the uh the committee consider eliminating the requirements for type one secondary suite permits because they are administered through the building permit process, and we are doubling up on our administrative work.

Sid Tobias2:00:14

Thank you for this.

Sid Tobias2:00:14

Perfect.

Sid Tobias2:00:15

Thanks for the clarification.

Sid Tobias2:00:16

Councillor Lemon, please.

Gery Lemon2:00:21

Lam, there's been there's already quite a bit of social media activity around the second point of the doubling of type two.

Gery Lemon2:00:34

Now, do the other municipalities, the other what, 10, 11 municipalities, um not have uh type two at all.

Gery Lemon2:00:45

None of them.

Leanne Taylor2:00:46

None of them do.

Gery Lemon2:00:47

So we're because because we are a leader in establishing the secondary suite bylaw, that's that's how type two came into effect.

Leanne Taylor2:00:58

Through the chairs.

Leanne Taylor2:01:00

The my understanding is back in 2006 when the town established the secondary suite by law bylaw and um and then the the secondary suite permit bylaw.

Leanne Taylor2:01:11

Um we we were the leaders.

Leanne Taylor2:01:13

We were I think we were one of the first municipalities within the region to to um permit secondary suites.

Leanne Taylor2:01:18

That's that's what I've been told.

Leanne Taylor2:01:20

And um, and so at the time, because it was a sort of a new form of rental housing, um not many places were doing it.

Leanne Taylor2:01:27

So these these regulations were were put into place, but also provided some comfort for the community.

Leanne Taylor2:01:34

Um fast forward 17 years now, um secondary suites are everywhere.

Leanne Taylor2:01:38

They're no longer really considered a form of innovative rental housing.

Leanne Taylor2:01:41

They are truly um really fill that gap and um it's uh and so it's it's it's it was time to sort of revisit the the secondary suite permit bylaw and um and uh and and looking at ways of how um the town may want to consider um tweaking it.

Leanne Taylor2:02:02

One more question so so if we were to eliminate the need for the type one permit um and keep type two at the hundred dollar level would that would that square with everything would you would would that would would that work for um compensate for the the staff time that goes into the program so through through through the chair um the if if there's no change like if if there's if it's just um if there's no change to increasing the type two um secondary suite permits um it's um it obviously it would cut the amount of staff time required to administer this program um the reason for uh recommending an increase is to incentivize folks to to bring them up to and and to bring them up to um code and in some cases it could be just um having a fire inspector come through and and make sure it meets like fire code um it could be very simple um and perhaps in some um suites it might not be as as a simple um upgrade it really depends but um the obviously if council eliminates type one and keeps type two it would eliminate the amount of administrative um work associated with this program good to know thank you let's go to councillor McKenzie then counselor brown and councilor roger thank you I have uh a few questions um my first one, when we're talking about it being non-compliant with BC building codes, are I'm guessing how dangerous are it is it that the I guess what are some examples of not meeting the building codes are there?

Alison MacKenzie2:04:03

So because I'm trying to figure out what our liability is for allowing a type of permit for something that doesn't comply with a building code, if something were to happen under that.

Leanne Taylor2:04:45

So through the chair, and the so when the when the program was created back in 2005, 2006, there was a secondary suites enforcement policy that was established, which stipulated that most secondary suites that existed before December 31st, 2005, and wished to not conform with the secondary suite regulations of the BC Building Code at the time would not face immediate requirements from the town to update these these suites.

Leanne Taylor2:05:18

And the type two in a way, and correct me if I'm if I'm wrong, but it it just it it also kind of acknowledges and informs um like the homeowner, the tenant, they have to put the type two suite permit like on the window that this is a this is a type two permit and um that it uh and the suite may not conform with the the the BC building code.

Leanne Taylor2:05:43

It is important to note too that over time like the BC Building Code does update like every couple every year every couple of years and there has been changes to the secondary suite regulations within the BC Building Code.

Kim Anema2:05:57

And we they have to be they have to be the FBM compliant with the code of the day so we're not going to go in and look at every single suite but um but if so in a way it's the type twos is just it's more of a an awareness a notification aware an awareness that um that's the type of secondary suite it is thank you i think kim has some amplifying information kimplete yeah i think we need to recognize that the um in the type two secondary suites did not meet the building code of the day when they were first issued and that means that they could conceivably be in a variety of different forms not complying in a variety of different ways we don't have details as to how they don't comply.

Kim Anema2:06:47

We know they don't and the the purpose of the building accord, of course, is health and safety of the occupants.

Kim Anema2:06:54

And so when it comes to liabilities, it's not something that we can get them to waive, it's something that just exists.

Kim Anema2:07:00

And so the incentive to um raise the fee with a purpose of having somebody achieve compliance is real.

Kim Anema2:07:11

We we do need to have that incentive.

Alison MacKenzie2:07:16

Okay, thank thank you.

Alison MacKenzie2:07:17

That answered my question.

Alison MacKenzie2:07:19

And um just to clarify, and I think it's building on what uh councillor Lemon was asking, the municipalities in your table, they don't have um permit programs because they require everyone to meet the building codes.

Alison MacKenzie2:07:36

So we're kind of being more lenient because we have these ones that don't comply, but all the other municipalities require them as part of the building permit.

Leanne Taylor2:07:44

Through the chair, just to clarify a little bit.

Alison MacKenzie2:07:46

So is that correct?

Leanne Taylor2:07:51

So to legalize the secondaries, if you want to legalize a secondary suite, um one would have to apply for a building permit to ensure that it meets the life and safety, health and safety requirements.

Leanne Taylor2:08:09

But the the um it would be like through the building permit process um where we would ensure that a suite complies with zoning, so parking, for example, and then also um that it meets the minimum health and safety requirements of the VC building code.

Alison MacKenzie2:08:28

Okay, okay.

Alison MacKenzie2:08:29

I think not sure if that quite answered my question.

Alison MacKenzie2:08:35

Um in in your tape um table.

Alison MacKenzie2:08:42

Yeah, so these ones, all the ones with no next to it, would require them to meet the building code or VC building code, no.

Leanne Taylor2:08:54

If if they uh if they um apply for a building permit.

Leanne Taylor2:08:58

But yes, I guess the answer is yes.

Leanne Taylor2:09:00

Um, and um, but one would have to apply for yes, a building permit.

Leanne Taylor2:09:05

Right.

Leanne Taylor2:09:05

Okay.

Alison MacKenzie2:09:06

Um thank you.

Alison MacKenzie2:09:08

And then okay, I I think I'm good.

Alison MacKenzie2:09:10

Thank you.

Sid Tobias2:09:12

Uh Councillor Brown and Councillor Roger.

Don Brown2:09:14

Just a couple of comments and a couple of questions.

Don Brown2:09:14

Uh I agree.

Don Brown2:09:20

Uh sorry, number one, no longer requiring new and renewal for type one permits.

Don Brown2:09:25

I think that's uh kind of an over here.

Don Brown2:09:27

It was definitely save some staff type.

Don Brown2:09:30

The only concern I might have, and I just wonder statistically wise and emergency preparedness wise, if there's not some value to having people at least apply at the on the first instant and then not renew.

Don Brown2:09:42

Uh just so we know uh we we have we have numbers.

Don Brown2:09:47

Um and if there was a major disaster or something, we we might be able to uh know where the people are.

Don Brown2:09:53

I don't know.

Don Brown2:09:53

Is there some value to that or not?

Don Brown2:09:56

Probably not.

Leanne Taylor2:09:57

Through the chair, we can um track that through the building permit process.

Don Brown2:09:59

Okay, and I guess the other comment, sort of along the same lines as counselor Lemon.

Don Brown2:10:07

Um a few people have noticed this and mentioned it to me.

Don Brown2:10:11

And I think the only concern anybody had was the increase from the 100 to 200.

Don Brown2:10:16

I don't think either if it's 100 to 200, I don't think it's really much of an incentive.

Don Brown2:10:20

And I think I'm very happy to hear you're not issuing any more type two permits.

Don Brown2:10:25

That's great.

Don Brown2:10:26

Um, I don't think that's a big incentive um for them to switch over.

Don Brown2:10:30

And I think over time you're gonna find houses get torn down.

Don Brown2:10:33

People move, they no longer rent the suites out anyway.

Don Brown2:10:37

Um so yeah, I think number one's great.

Don Brown2:10:40

That's gonna save a lot of time, definitely.

Don Brown2:10:43

Um the only issue I have is yeah, I'd be happier to leave it at $100.

Don Brown2:10:48

That that then that's just me.

Sid Tobias2:10:52

Councilor Rogers, please.

John Rogers2:10:55

Yeah, I I was back there in the day along with Councillor Mattson, and um um uh we we were really making uh great strides to uh to be the first and and uh be um uh flexible on um on non compliant suites.

John Rogers2:11:11

Um the uh fee at that time when we started, I think was considerably more than 200 or 300 or 400.

Leanne Taylor2:11:21

We were we when we were starting this up, I I think there was uh you know some um you know we we because we wanted to make sure this was revenue neutral okay that it paid for uh the work that was involved so um but that's that's my rec recollection other meetings uh uh have different points uh recollections the um when you when you listed the hours um did that include uh enforcement so I I um I did check with the bylaw enforcement um department and there this year there's been no enforcement associated with secondary suites and secondary suite permits and renewals but uh of course, in and um the fines and so forth, it there is a requirement for secondary suite people to have their vehicles, their tenants on the property, right?

Leanne Taylor2:12:17

Yeah, so through the chair.

Leanne Taylor2:12:18

So um when um we receive uh secondary suite permit application, um our planners um check to ensure that there's there's parking.

Leanne Taylor2:12:29

However, that would that is also done through the building permit process.

John Rogers2:12:33

And uh so what happens on that uh first check is uh you know, two years later the tenants move, the new ones come in, and they have two cars, not one car.

John Rogers2:12:43

And so, you know, we uh I I wonder how much enforcement we have um in that regard, and that might be um you know an issue of people complaining about parking on on on streets.

Leanne Taylor2:12:57

Um so just to just to answer that that um counselor rogers so when we carry out type one we cut turn yeah sorry when we carry out the renewals we we don't do um a zoning review for 465 or whatever the number is um renewals like we we just don't have the staff capacity to do that so we do the the first check when they at the at the first sort of point in time when when we see the secondary suite permit application um or the building permit application however we're not doing um parking reviews as part of renewals.

John Rogers2:13:35

Mm-hmm.

John Rogers2:13:35

No, it's just gonna be on a complaint basis.

John Rogers2:13:38

So the um so and again, so if I get this right, type two are those uh suites that at the time were did not comply with the building code.

John Rogers2:13:46

Uh it may be those individuals might want to have another re-evaluation because maybe now it does comply with the building code.

John Rogers2:13:54

Is that a possibility that they can initiate that request?

Leanne Taylor2:13:58

Absolutely.

John Rogers2:13:59

Yeah.

Leanne Taylor2:14:00

Okay.

John Rogers2:14:00

So that uh and I think the um so there there's some question whether or not um the fees collected and again it there's a revenue neutral aspect so if you if you calculated 165 hours um does um people were wondering about the math that uh 44,000 is um um works out to a a considerable dollar per hour fee.

John Rogers2:14:27

Is that they didn't seem to think that there was um uh uh a logic in that rate if uh staff were at $50 an hour or whatever.

Leanne Taylor2:14:38

So um through the chair, the so again, this is average average number of hours.

Leanne Taylor2:14:44

I'll give you an example.

Leanne Taylor2:14:45

Like we um my staff um were dealing with um uh secondary suite permits um application renewal that took like I would say 20 plus hours to deal with.

Leanne Taylor2:14:59

So when I say when I mentioned like anomalies, that we do have a couple anomalies um throughout the year that requires some significant um attention and um and uh and back and forth between um staff and the applicant.

Leanne Taylor2:15:15

So it's again, it is a um sort of an approximate number of hours.

Leanne Taylor2:15:23

And um and it just sort of also builds upon what our CO just mentioned too regarding um incentivizing um the the compliance.

Leanne Taylor2:15:35

Yeah.

John Rogers2:15:35

Yeah, thank you.

John Rogers2:15:36

Um as far as the comment is concerned right now, I I I agree that um the fee should come off the uh type one compliant that would be consistent with the municipalities, the other municipalities because they do not charge fees for those who are in compliant.

John Rogers2:15:53

However, for those when that are um not in compliant, no, yeah, I agree.

John Rogers2:15:58

There should be that incentive.

John Rogers2:15:59

There's an incentive for those ancient homes that have sump pumps or um on properties and when a property changes hands it's now the homeowner's responsibility, not the town.

John Rogers2:16:11

So I I see a parallel in in uh shifting that responsibility to the uh the homeowner.

John Rogers2:16:19

And um and I I guess the uh you know people talk about it being a hundred percent increase a hundred bucks just an additional hundred dollars which is you know when you consider uh if they uh they have a tenant and they're gonna they're only permitted three point five percent increase, well that's more like 12 what twelve hundred dollars a a year who for you know obviously that pays for the uh increase in in uh this administrative fee that uh I think is entirely reasonable.

John Rogers2:16:44

I agree with the report.

John Rogers2:16:50

Thank you.

Sid Tobias2:16:51

Uh before I go to you uh for a second round uh for questions, Counselor Brown, I just had one of my own, and that is when was the last time it was increased?

Sid Tobias2:17:00

Um do we know or or what won that we've got a hundred dollars currently for the type two secondary suite.

Sid Tobias2:17:07

Did that come up or down, or is that always been the case since the bylaw?

Sid Tobias2:17:12

Kim, you might not know that right off your head.

Kim Anema2:17:14

That's before my arrival.

Sid Tobias2:17:16

Okay.

Sid Tobias2:17:16

All right, so it's so it's been a while uh for a hundred percent increase on what it is.

Sid Tobias2:17:23

Um, what would the impact be um if we just didn't have a permit for type one or type two?

Sid Tobias2:17:31

You know, we're we're we're talking around, you know, trying to streamline our processes and taking the onus off of staff.

Sid Tobias2:17:38

Um, they've already had a building permit.

Sid Tobias2:17:41

That's how we're organizing our type one.

Sid Tobias2:17:44

The reality is, you know, we're having people that are boarding rooms that are living rough, um, that these these places are are livable right now.

Sid Tobias2:17:55

What would the impact on staff be if we didn't have a permit and just relied on the building inspection to initially do it?

Sid Tobias2:18:03

Like, is this is this really making a difference?

Sid Tobias2:18:06

I don't think a hundred dollars is going to um have a homeowner suddenly feel compelled to um do a sixty thousand dollar renovation to bring it into compliance.

Sid Tobias2:18:14

I don't think that's gonna happen at all.

Sid Tobias2:18:22

So why are we doing it at all?

Sid Tobias2:18:24

It's just a question that I'd like to that would take it off of staff's hands, liberate X number of hours off of them to do more highly valuable things than perhaps a permit that really isn't doing much.

Sid Tobias2:18:39

It served its purpose at the time and V Royal was a leader but I'm just curious now like what would the impact on SNAP B if we just said no permit?

Kim Anema2:18:49

Mayor Tobias, the um if we if we did nothing, if we eliminated both permits, we would be going back to 2005 pre regulation.

Kim Anema2:19:01

And it could well be that we'd have an increase in secondary suites without any kind of building permit process.

Sid Tobias2:19:12

I think that um sorry Kim, I meant the renewal fee for the type two.

Sid Tobias2:19:17

They've already had a building permit, but this is a renewal fee, right?

Kim Anema2:19:21

If we don't have success with the type two by adding doubling the fee, then we probably should reconsider to um increase the fee to something that does provide incentive.

Kim Anema2:19:35

The goal here is is not to increase the fee and generate revenue.

Kim Anema2:19:39

The goal here is can we encourage them to actually come into compliance with the building code?

Kim Anema2:19:44

And if this fee doesn't do it, then we should be increasing the fee to something that does.

Sid Tobias2:19:51

Understand.

Sid Tobias2:19:52

Councilor Brown.

Don Brown2:19:55

I'm prepared to make a motion to accept the uh uh posted proposed changes with the exception of retaining the renewal fee for type two secondary suites at $100.

Don Brown2:20:09

If I can get a seconder.

Gery Lemon2:20:11

So I will second that.

Don Brown2:20:20

So we've got now it's time for comments that we've done our questions.

Don Brown2:20:25

So Councillor McKenzie.

Alison MacKenzie2:20:32

I personally feel very uncomfortable with allowing rental units that don't meet building standards as of 2007 or five, which are have only increased.

Alison MacKenzie2:20:47

For instance, I'm thinking back to a year or so ago in Victoria where there was a landlord who didn't have a fire escape for their tenants.

Alison MacKenzie2:20:56

And that's possible, I believe, under this um kind of permit.

Alison MacKenzie2:21:01

So I would prefer to see either um the option that staff recommended or to require them to come up to building code by, I guess you would eliminate the permits and do as the other municipalities have done, which is require them to get a building a new building code.

Alison MacKenzie2:21:23

Is that correct?

Don Brown2:21:26

Go ahead, Leah.

Leanne Taylor2:21:28

Um so through the chair, um just r regarding the second point, I think we would have to reach out to uh our legal counsel to find out if we can force someone to apply for a a building permit.

Leanne Taylor2:21:44

I uh it's um that was something we we would have to look into in terms of given the whole program.

Alison MacKenzie2:21:53

Okay, thank you.

Damian Kowalewich2:21:54

Councilor Wallowage.

Damian Kowalewich2:21:57

Thank you.

Damian Kowalewich2:21:58

Uh I I'll support that as well, Councillor Brown.

Damian Kowalewich2:22:00

And just for the the comments up here, uh I am not in support of the town of U Royal inspecting every single home in the municipality to look for uh meeting building codes.

Damian Kowalewich2:22:12

In that case, I don't think a lot of residents would have homes.

Damian Kowalewich2:22:16

Um, it's just not practical.

Damian Kowalewich2:22:18

Um, the spirit of it uh I get, but uh it's not practical, unfortunately.

Damian Kowalewich2:22:23

I like the idea of this in general.

Damian Kowalewich2:22:25

It's gonna provide more housing for individuals in need.

Damian Kowalewich2:22:28

It's going to basically come in line with what the provincial government is going to uh come down the pipe with, anyways.

Damian Kowalewich2:22:34

So they've they've openly said that that they're going to basically uh legalize every suite in the province.

Damian Kowalewich2:22:40

They've made that very clear, and it's likely coming in the fall.

Damian Kowalewich2:22:43

Uh nonetheless, it seems to be very prevalent in other municipalities as well, anyways, and we're following suit.

Damian Kowalewich2:22:48

And matter of fact, I think it's time uh we did it, and I think we're behind.

Damian Kowalewich2:22:52

So I'm happy to support this.

Don Brown2:22:55

Council Rogers.

John Rogers2:22:58

Health and safety.

John Rogers2:23:00

I think that's the uh the key, the crux of this.

John Rogers2:23:03

Uh, this and um um I think we've all known landlords that um did not consider well considered the uh the uh their bottom line, their profit before the uh the safety of their tenants.

John Rogers2:23:19

And if they don't put escalators, they don't have windows, they don't have proper ceiling heights, you know, it's um then yeah, you're right.

John Rogers2:23:26

They the individuals will have a space, but it's gonna be a hole and it could be a dangerous hole and these are not just individuals bachelors or you know solitary people they could be with families and kids so let's raise the bar and ensure with with staff's uh careful guidance and um uh that that the very basic building code is met and uh if we want to have a free frontier here then and we want to do away with licenses yeah sure let's do away with the business licenses.

John Rogers2:24:01

Why are we bothering with those?

John Rogers2:24:03

So it's uh there is a purpose and a function.

John Rogers2:24:06

And um, you know, if uh if we don't have these fees, then we shouldn't have garbage fees, we shouldn't have sanitation fees, we shouldn't have collection, all those other dog license fees.

John Rogers2:24:17

We should leave it all up to the taxpayer to pay for those that individuals that are you know having this additional revenue come in.

John Rogers2:24:27

So um uh let's let's get back to reason here.

John Rogers2:24:31

Um if the province uh wants to legalize all the secondary suites, well then they can have the responsibility of being a frontier um you know landlord first.

John Rogers2:24:41

I understand the the need for housing, but we want to have proper, safe, comfortable housing that that um these individuals can be proud and and happy to live in.

John Rogers2:24:52

I support the I do not support this motion.

Sid Tobias2:24:55

I think we um uh staff's recommendation is is fair okay so we got a motion on the floor i believe it's for um just want to confirm council lemon first i think it's for um the uh hundred dollars so not increasing it with the with staffs that's the motion on the floor right now that's against staff's recommendation so I just want to clear that for everybody so if we were to vote on this um for the hundred dollars and it was defeated then we would vote on uh staff's motion, but I think procedurally um we've got it in reverse.

Gery Lemon2:25:36

But I'll go to council elemon next yes, and the motion as that I seconded uh would eliminate the first bullet.

Gery Lemon2:25:46

Um but to I I I agree with my colleagues.

Gery Lemon2:25:50

Certainly it's about health and safety.

Gery Lemon2:25:53

Um but I don't see a hundred dollar addition being effective in that.

Gery Lemon2:26:03

What I do think is that communication strategy, you know, um sending out a sending out a letter to people saying you will have absolutely no fee.

Gery Lemon2:26:13

There'll be no renewal fee if you do this.

Gery Lemon2:26:17

And I think that would be as effective or perhaps more effective than chart double doubling the fee.

Gery Lemon2:26:24

So that yeah, I'm I'm I remain in support of keeping the type two fee at $100.

Sid Tobias2:26:34

Okay.

Sid Tobias2:26:34

Um, I think this is final arguments at this point.

Sid Tobias2:26:37

So, Councillor Brown, go ahead and we'll stop it there.

Don Brown2:26:40

And I don't I don't really think it's going to create a wild, wild west.

Don Brown2:26:44

And we are going to have to um we need more space.

Don Brown2:26:48

And really, we're dealing with 245 properties, which could be less now, maybe, as these are older homes, probably, and people may have already moved on, or the houses may be eventually being demolished.

Don Brown2:26:59

I don't know.

Don Brown2:26:59

But we're dealing with a very small number.

Don Brown2:27:02

And uh yeah, I'm sure some of these spaces are very nice, quite likely could be nice, but uh you know, we're kind of splitting hairs between talking 100 to 200.

Don Brown2:27:12

Either way, it's not gonna be a big, but I'll agree with counselor lemon.

Don Brown2:27:16

It is an incentive for them not to have to have that uh have to come down and renew every year, and they save 100 bucks, so it's kind of moot, but however, uh that there's it is a little bit of an incentive.

Sid Tobias2:27:30

Okay, so I think we're ready to call the question on the motion on the floor.

Sid Tobias2:27:34

The motion on the floor deviates from staff's recommendation and keeps um bullets one and three remain the same.

Sid Tobias2:27:42

Bullet two is um a maintaining the hundred dollars vice increasing to 200.

Sid Tobias2:27:48

So with that, we've got a uh mover and a seconder, all in favor of the motion as proposed uh by councillor brown and counselor lemon.

Don Brown2:28:02

So uh all those opposed.

Sid Tobias2:28:08

So now we're in a spot.

Sid Tobias2:28:10

Um so we tied, uh the motion was defeated.

Sid Tobias2:28:16

Um so now we can go to move to 200.

Sid Tobias2:28:21

I suspect there will be very similar results.

Sid Tobias2:28:24

Uh but knowing that we can't uh can't move forward to it, um there may be some uh play there.

Sid Tobias2:28:32

So this vote I'm proposing would go on staff's recommendation as proposed.

John Rogers2:28:38

Shall move.

Sid Tobias2:28:39

I moved by councilor rogers, seconded.

Sid Tobias2:28:43

Seconded by Counselor McKenzie all those in favor and it's threes uh one moment so is the only change here the 100 to 200 affirmative yep i'll go with you guys on that okay yep uh so that is uh four uh three and that passes and i think uh staff if you could take away if you want it in a motion form i think counselor lemon had an excellent point is there a way with their permitting that we can put a communication in there you can avoid paying this $200 fee if and by the way the province is offering this grant loan whatever uh as an incentive for compliance um uh in that I think that's not bad.

Sid Tobias2:29:28

Uh counselor brown motion my vote against isn't this recorded yes uh counselor brown and counselor lemon voted against and in favor was counselor qualwich mayor to bias uh counselors rogers and makenzie for the record okay so that was um that and uh item b was residential development update report is that you again, Leanne?

Don Brown2:30:01

You're busy.

Don Brown2:30:22

Thank you, Chair.

Leanne Taylor2:30:29

So again, it's Leanne Taylor, Director of Development Services, and I will be presenting on the residential development major projects update.

Leanne Taylor2:30:38

Council committee may recall that back in May on May 8th, 2023, staff brought forward a similar presentation in terms of giving the committee sort of a snapshot on the major projects that are currently active will have been approved through a development permit or a building permit or currently active.

Leanne Taylor2:31:08

So this presentation, well, the next few slides are snapshots of the table within the report.

Leanne Taylor2:31:18

And as I noted, this update is on the total number of dwelling units in large projects, including mixed use and multi-unit residential developments that are currently under construction or approved by council, but not yet under construction.

Leanne Taylor2:31:32

So no building permits.

Leanne Taylor2:31:34

So I am going to go through the seven projects underway, and I'm just going to highlight where the projects are at.

Leanne Taylor2:31:46

So the first one is 244 Island Highway, so Skyview and across the street from not too far from here.

Leanne Taylor2:31:54

And again, the building permit was issued on April April 18th, 2021.

Leanne Taylor2:32:00

And this particular project was stalled, but it is now in progress.

Leanne Taylor2:32:06

The next project is 258 Helmkin Road, which is also known as the Royale.

Leanne Taylor2:32:11

The BP was issued on December 9th, 2022 for 55 units, strata units.

Leanne Taylor2:32:18

And this project is also underway, and they are currently doing concrete pours.

Leanne Taylor2:32:28

So the next three images are the buildings that are under construction on Erskine Lane, also known as the Blueprint.

Leanne Taylor2:32:36

The this in this development, there are a total of 316 rental units.

Leanne Taylor2:32:42

The BP issued for buildings C and D, also known as 15 and 17 Erskine Lane, was issued on July 26, 2022, for 158 rental units.

Leanne Taylor2:32:54

And the BP for issued for buildings A and B, which is also known as 9 Erskine Lane, was issued on July 31st, 2023, so a couple of months ago for 158 units.

Leanne Taylor2:33:06

So four out of the four buildings are all in progress.

Leanne Taylor2:33:12

The next project is the Aspire, and that's located at 1449 Burnside Road West.

Leanne Taylor2:33:18

And the building permit for these for both for all buildings was issued on September 27th, 2023 for 234 rental units.

Leanne Taylor2:33:30

And this project is in progress.

Leanne Taylor2:33:33

The next project at called Portage Park at 167 Island Highway, which is adjacent to the Four Mile Pub.

Leanne Taylor2:33:41

This we have received the building permit for this project on September 8th, 2023, so about a month ago, and it's currently under review.

Leanne Taylor2:33:50

And this project is proposing 82 strata units.

Leanne Taylor2:33:58

The next project is 2000 West Park Lane, also known as West Park 1.

Leanne Taylor2:33:59

And this multiunit residential building is for 48 strata units.

Leanne Taylor2:34:08

And the building permit was issued on July 6, 2023 for all 48 units.

Leanne Taylor2:34:13

And the project is in progress.

Leanne Taylor2:34:15

Lastly, 7 Erskine Lane.

Leanne Taylor2:34:18

This particular building was approved by the development permit was approved by Council on May 2nd, 2023.

Leanne Taylor2:34:24

And we have not received a building permit yet for this building.

Leanne Taylor2:34:27

The building is proposing 71 uh rental dwelling units.

Leanne Taylor2:34:32

This map here shows um the number of dwelling units um currently under construction in the town.

Leanne Taylor2:34:42

So there are 690 dwelling units currently under struction under construction.

Leanne Taylor2:34:46

And this includes 550 rental units and 140 strata units.

Leanne Taylor2:34:52

These projects would likely be will likely be completed within the next couple of years.

Leanne Taylor2:34:57

There are two large developments with development permits.

Leanne Taylor2:35:00

However, building permits have not been issued.

Leanne Taylor2:35:04

And if these building permits are issued for these projects, then they will deliver 153 dwelling units, including 71 rental units and 82 strata units.

Leanne Taylor2:35:14

This concludes my presentation and happy to answer any questions.

Sid Tobias2:35:19

Leanne, thank you for this.

Sid Tobias2:35:21

This is a great report and the one that we ask.

Sid Tobias2:35:24

Um, and I'd be very much willing to work with you and turn this into a website because I think once the province sets our housing targets in six months certain counting, um, it will be something that they will be monitoring closely.

Sid Tobias2:35:38

So I tried to ask the question and get from the province um uh what their housing targets were based on.

Sid Tobias2:35:48

What I managed to glean is that it is built within five years.

Sid Tobias2:35:55

So the our numbers here may be if it's gonna seed the construction point, um, and and you're estimating in in most cases a couple of years, we're we're gonna see build would apply to meet the housing targets for the province.

Sid Tobias2:36:13

Um, unless I heard differently, that's what I'm assuming now, because they want to see something delivered in a five-year period.

Sid Tobias2:36:21

Um one of the things looking at Oak Bay of comparable um uh population, uh they were looking at I think a housing target of about 400 units.

Sid Tobias2:36:33

So I think we're exceeding that with what we've got here.

Sid Tobias2:36:37

Um a little concerned about, I think they they had within that mix about 40 affordable, um, which we have yet to kind of be able to wrap our heads around securing.

Sid Tobias2:36:51

Um, but it's something that I I think will come out uh in due course.

Sid Tobias2:36:56

But thank you very much for piecing this together for us.

Sid Tobias2:37:00

And this, of course, is the big stuff.

Sid Tobias2:37:01

I notice there's also um lots of other houses, especially up around Thetis Lake, that are uh duplexes and stuff that have just come online as well.

Sid Tobias2:37:14

Um so I know there'll be questions about the everything as well, realizing that this is only the big one.

Sid Tobias2:37:20

So it'll probably be worth your effort to keep those numbers updated because I think you're gonna just be repeatedly asked for them by municipal affairs and housing and council and and everybody else.

Sid Tobias2:37:33

So uh I thank you.

Sid Tobias2:37:34

Does uh do my colleagues have questions for Leanne?

Sid Tobias2:37:37

Start with questions, then move to comments.

Sid Tobias2:37:39

Let's go to Councillor Brown and then Councillor Rogers.

Don Brown2:37:42

Sorry, just a comment.

Don Brown2:37:44

Just nice to see there's 73 three-bedroom units.

Don Brown2:37:44

I think it's important to get those units where families can move in.

Don Brown2:37:50

Um Eagle View, I think it's not too bad, but I know View Royal Elementary, their enrollment's quite a ways down.

Don Brown2:37:57

Um I know a lot of these wouldn't be in the current catchment areas, but I know the school board has already changed some of the catchment areas, so hopefully that'll help um alleviate that problem.

Don Brown2:38:05

It's really strange in these days to see a school um getting lower enrollment numbers.

Don Brown2:38:10

That's probably uh one of the few anomalies in the whole province.

Don Brown2:38:15

But that's just a comment.

Don Brown2:38:16

Thank you.

Don Brown2:38:17

Good great report, thank you.

Don Brown2:38:19

Councilor Roger.

John Rogers2:38:20

Yeah, yeah, very helpful.

John Rogers2:38:21

It's um interesting to see the the uh places that there's also um um, you know, with the you know, I guess it's for the province and uh who knows what and when, but you know, the Portage uh inlet uh Portage Park um development and um Erskine Lane number 10, number seven, you know, uh if it we all we can do is approve.

John Rogers2:38:44

And um I guess my can my concerns in terms of these numbers is that uh you know the province is going to give us a hard time because we approved and the developer didn't move.

John Rogers2:38:53

I hardly feel that we should be uh penalized for the developers' um uh issues, be it interest rates or lack of employment or lack of uh skilled staff, whatever.

John Rogers2:39:04

And I'm wondering, um, our annual reports, does the RNA reports itemize the significant developments that have been approved that year?

John Rogers2:39:14

This report is a great example.

John Rogers2:39:17

I would love to see that.

John Rogers2:39:21

Let's let's do that.

John Rogers2:39:22

Let's build that in.

John Rogers2:39:24

Because uh, I'm certainly got a great interest.

John Rogers2:39:26

I've just gone on the CRD map and gone back to 2015 and looked at all the changes that have happened since 2015.

John Rogers2:39:34

Um, you know, what was it, uh the last two phases of TIOCO were done.

John Rogers2:39:39

Uh the list goes on and on.

John Rogers2:39:41

So um where we we can do our calculations um when we know the properties, we know the addresses, we should be able to, you know, find out when they were done in relation to uh that all critical 2016 census and since then.

John Rogers2:39:57

Anyway, I'll have some homework for you later.

Sid Tobias2:39:59

Thank you, Councillor Rogers.

John Rogers2:40:02

Any other questions for Leanne for this?

Sid Tobias2:40:06

Any other comments?

Sid Tobias2:40:08

So I think uh we've got a recommended uh motion to receive.

Sid Tobias2:40:12

Uh can I get a mover?

Speaker_Unknown2:40:14

Moved.

Sid Tobias2:40:15

Moved by Councillor McKenzie, seconded by Councillor Lemon.

Sid Tobias2:40:19

All those in favor?

Sid Tobias2:40:20

Any opposed?

Sid Tobias2:40:21

Seeing none opposed.

Sid Tobias2:40:22

Motion carries.

Sid Tobias2:40:23

Leanne, thanks again for a very wonderful report.

Sid Tobias2:40:26

Um and parking review terms of reference.

Sid Tobias2:40:29

Are you gonna be able to pass this over to anybody else or Leanne?

Sid Tobias2:40:32

This is yours too.

Don Brown2:40:33

Okay.

Leanne Taylor2:40:42

Thank you, Chair.

Leanne Taylor2:40:43

Um, I don't have a PowerPoint presentation for this one.

Leanne Taylor2:40:44

It'll just be a verbal um a verbal presentation.

Leanne Taylor2:40:49

So the purpose of this report is to present the committee with the draft terms of reference and objectives for the off-street parking review.

Leanne Taylor2:40:57

The off-street parking review is a non-core project to be in the 2023 2027 financial plan to be completed over two years, so 2023 and 2024.

Leanne Taylor2:41:10

The project objectives include undertaking a comprehensive review and updating of the town's parking regulations, including accessible and bicycle parking requirements, ensuring that the parking requirements reflect current policies, local parking needs, and best practices, and carrying out extensive stakeholder and public engagement to test parking innovations.

Leanne Taylor2:41:34

The overarching goal of this project is to modernize the town's off-street parking bylaw.

Leanne Taylor2:41:40

The deliverables would include a review of the vehicle and bicycle parking requirements, minimum parking dimensions, the location design and use of on site parking areas, EV charging, landscaping, and the cash only requirements.

Leanne Taylor2:41:55

Staff have prepared the draft terms of reference and objectives um for the our request for proposal, which are listed in the staff report.

Leanne Taylor2:42:07

And I won't go through every bullet, but they're there and um a staff welcomed feedback from the committee on the draft terms um prior to us moving forward on completing the rfp for this project by the end of this month thanks Leanne uh two questions for me to kick off my colleagues one would could it include um I know on some of the roadways in the Harbor district um you'd be challenged to do on street parking there.

Sid Tobias2:42:39

And you know I'm not only talking about um the policy for secondary suites maybe everywhere without um council approval but also the province's interest in rezoning to um multi um uh the impact on the town.

Sid Tobias2:42:58

These are questions without a study we may have to answer anyway um to the province when they come with options for us to consider so i certainly parking i've heard uh several times on some of the roadways being um a concern of development of really older infrastructure that currently cannot accommodate it so i would i would value very much saying if to these two policies that the province is pondering uh what would the impact be on on our traffic and what mitigations might we have.

Sid Tobias2:43:34

One is um R1 lots to multi-dwelling, I guess would be the I think what the province is interested in.

Sid Tobias2:43:43

And the other one would be um, you know, essentially secondary suites uh in in in each house and what that that might do.

Sid Tobias2:43:52

Um from my own personal experience where everybody has a secondary suite around me uh it's it's not just the parking of um of the the folks that that are occupying it's the your guests now their guests now and uh and uh it can get out of control uh pretty quickly but um I'm living on a relatively wide street and when I go down to the Harbor District I realize that really it's a single car only lane road and if you had somebody forced on the street it would be hard.

Sid Tobias2:44:27

So so those two things to take into consideration, Leanne, did you have a question?

Leanne Taylor2:44:29

Thank you, Mary Tobias.

Leanne Taylor2:44:32

Thank you.

Leanne Taylor2:44:34

Um just a point of clarification actually to ensure I've captured your your point.

Leanne Taylor2:44:38

So the scope of work for this project is looking at off street parking um requirements.

Leanne Taylor2:44:43

So basically coming up with a new parking bylaw.

Leanne Taylor2:44:47

And so uh what I'm hearing from you is that um you're uh wanting us and and again I should preface this by saying when we look at the parking bylaw we look at all the uses so all the residential uses from single family dwelling, duplex townhouse, um multi-unit residential, then mixed use, uh, um commercial uses, like the whole, the whole gamut.

Leanne Taylor2:45:09

Um, and so what I'm hearing is that um sort of what are the what would be the part on street parking impacts from rezoning from like a single family dwelling to zone to a multi-unit residential zone.

Leanne Taylor2:45:23

Um and um as part of this project um we would be looking at um the the variances like an analysis of past parking variances um within the community and and that would I think tie into kind of what you're saying in terms of perhaps those those impacts yeah as long as we can go back to the to the province who is trying to suggest that this would be, you know, something that the the municipality should consider.

Sid Tobias2:45:52

We would have some analysis to say we've done some look at this, and this is what the impact would be off-street parking in reality, that it might you know challenge our our uh on street parking um because of overflow and whatnot.

Sid Tobias2:46:11

So uh yeah, it would just inform us both on um uh for um secondary suites that were kind of more broadly available, as well as what happens if we take that R1 and turn it into a multi.

Sid Tobias2:46:26

So it would help us.

Sid Tobias2:46:28

And if we can use this study to answer some of those questions, uh it it might just give us the sharp edges around what the capacity is there, Leanne.

Sid Tobias2:46:37

Is I think that that maybe what council would be concerned with is that we've got uh some analysis that would provide an argument to say um this is what would hurt.

Sid Tobias2:46:48

Um counselor McKenzie and then Councillor McKenzie.

Alison MacKenzie2:46:53

I'm just curious about the timing of this uh in relation to the OCP, because I see well it originally was as a result or during the previous version of the OCP.

Alison MacKenzie2:47:06

And I think in order to determine where the pockets of cars might be, it would be informed by the OCP.

Leanne Taylor2:47:15

So I'm just wondering it, I guess, what is the rationale for having it before or um uh through the chair working on a um so again, parking is looking at like parking um for um for developing parking ratios for for uses and and reviewing those and obviously um location is a factor so um when there's a building that is located on a corridor on a transit corridor and there's other like alternative modes of transportation, um potentially there is um an opportunity for um uh um less parking.

Leanne Taylor2:47:56

So in some municipalities they do have um different um areas within a municipality that have different parking ratios based on um transportation options.

Leanne Taylor2:48:09

And so um the in terms of of um doing this ahead of the OCP, this particular project has sort of been on the action list for quite a long time, and it's something that staff has been wanting to get to as well.

Leanne Taylor2:48:24

Um and um because our parking bylaw has not been looked at since 2014, it's quite it's been quite a long time.

Leanne Taylor2:48:32

Um and there's also um a new, there's also there's been a lot of research in parking over the last several years, and um there may be some innovative ways um and um just opportunities that we can incorporate and embed into our parking rig into our parking regulations, and so it's um it's something that I think can be dealt with, could be completed concurrently with the OCP.

Leanne Taylor2:48:59

Great, thank you.

Sid Tobias2:49:07

Counselor Rogerson.

John Rogers2:49:09

Yeah, I looking at the uh the project um summary in June 2021, the you know the staff, council of director staff, I think that was my motion.

John Rogers2:49:19

And as soon as I realized that the developers um and the strata councils and the tenants and the uh landlords of new buildings would not hold their tenants uh responsible with um rules, regulations, uh strata rules, whatever, and um, you know, ensure that these individuals did not park on outside their building.

John Rogers2:49:44

I went through the motion.

John Rogers2:49:48

The um, so it I guess it's you know, we have all these developments that uh that are being proposed of all these units, all these parkings uh going on, but we've seen on Choco, uh, prime example, six mile, where now six miles got is a parking lot.

John Rogers2:50:04

And the parking lot is because we did not have adequate parking uh for those individuals, and and maybe because we still have an inferior bus service uh of the number 53.

John Rogers2:50:16

So I hope this this uh terms of reference uh does assess um you know those things like ensuring that we do have adequate bus service so that individuals won't have to take their car.

John Rogers2:50:29

That that's a um you know a balancing act.

John Rogers2:50:34

I I think the the other issue is um um look at all the roads that we do not permit parking on.

John Rogers2:50:40

This is not like downtown.

John Rogers2:50:41

You can park anywhere on any street.

John Rogers2:50:43

You can't park on Island Highway, you can't park on Helmaken, you can't park parks on Watch this way.

John Rogers2:50:50

There's three major roads that we will not allow parking, and maybe it's because of the hospital employees.

John Rogers2:50:56

But um uh if we're not going to provide and be like um those other municipalities that have and allow parking on street on those busy streets, um then I don't see we can change our our parking regulations on site.

John Rogers2:51:14

So that um I would be interested as a as a consultant to tackle that question.

John Rogers2:51:20

And if uh there's going to be innovations that will make um these things we can put into conditions, ironclad conditions, uh, I would be interested in that.

John Rogers2:51:29

So I I hope that the uh consultant um will um respond to that.

John Rogers2:51:36

There's going to be a lot of public interest in this one.

John Rogers2:51:39

If we're going to um there was an example that um Eagle Creek has too much parking.

John Rogers2:51:45

I disagree.

John Rogers2:51:46

I understand that Rexhall has too much parking, but uh and Canadian tire will soon have too little parking, I am sure.

John Rogers2:51:56

Uh so you know it it we're gonna have some very interesting practical examples, but I do worry that um about the list of consultants uh uh or sorry, uh consultation uh other stakeholders uh outside of residents.

John Rogers2:52:11

When I look at that engagement plan, goodness gracious, those external stakeholders definitely outnumber the residents.

John Rogers2:52:20

So I would hope that um uh we um we will clearly the consultant will clearly identify the source and that we don't get a um lopsided lobby group um campaigning for one particular aspect that um uh may not be in the resident's' ultimate best interests.

John Rogers2:52:41

So I I uh I know it's if it's difficult for you to put that in a terms of reference, but uh the magic bullet is if uh we reduce the parking on a on a complex, then that's what they get.

John Rogers2:52:54

Period.

John Rogers2:52:55

Thanks.

Don Brown2:52:57

Any other questions, comments?

Don Brown2:52:59

Uh Councilor Brown, please.

Don Brown2:53:00

And just a quick one.

Don Brown2:53:02

If you ever go to uh Royal Jubilee Hospital, there's lots of streets where you can't park.

Don Brown2:53:06

Well, it's residential only, so that's not right.

Don Brown2:53:08

And then they've got a huge park aid there.

Don Brown2:53:10

So um and again, I'm just throwing this out there, but C or D wants to charge parking for all these parks.

Don Brown2:53:17

Well, maybe they should put a higher parquet in there.

Don Brown2:53:20

I mean, they're trying to raise tons of money to by park charging everyone to park.

Don Brown2:53:25

Uh, people aren't gonna park there, there.

Don Brown2:53:26

There's gonna be even more people parking on the street, and yeah, six miles bad.

Don Brown2:53:29

It's gonna be really bad.

Don Brown2:53:30

Wait till that comes in.

Don Brown2:53:33

So maybe build the 8th Street Parkade like Tiger, I don't know, on at uh Cedas Lake.

Don Brown2:53:41

I mean, and that's wrong to say there's no uh there's there's lots of streets in Victoria where you can't park.

Don Brown2:53:48

Tons, tons.

Sid Tobias2:53:53

I don't think there's a conversation about parking in general, but about the study.

Sid Tobias2:53:57

Does anybody have any further questions or comments specifically for the study?

Sid Tobias2:54:03

Uh Council Demon.

Gery Lemon2:54:05

No questions, just a comment.

Gery Lemon2:54:07

I think this will be a very tricky brief for the consultant to take on.

Gery Lemon2:54:16

But if he or she is successful, it will go a long way to informing how we develop and how much we develop and where and and the parameters of the development.

Gery Lemon2:54:36

So thank you.

Sid Tobias2:54:39

I I I guess if I may over share um one of the expectations, I don't know how we would word this, but I would hope that um the consultants when they're looking at reducing the parking and um how and the realities of whether or not we're shifted simply are shifting the parking from on site and it's just going to spill over on site off site and um so i hope that they also weigh in the um public safety um aspects you know because suddenly you're gonna have to uh build a lot of sidewalks if uh you don't allow parking you reduce the parking on site the cars could move off site and now you gotta build the sidewalks to protect the pedestrians so I hope I think Councillor Rogers that goes out of the scope of the report there's a report as you're you're talking about a consequence of the report maybe but this report is probably not going to talk about sidewalks.

John Rogers2:55:31

Well, then, you know, they don't speak of consequences.

John Rogers2:55:34

There's, you know, where's the credibility?

Sid Tobias2:55:37

Well, there could be, but I mean, I don't I don't think that's what we're asking for in this one.

Sid Tobias2:55:41

This was just solely parking, right?

Gery Lemon2:55:43

Move the seat.

Sid Tobias2:55:44

All in favor.

Sid Tobias2:55:45

We've got uh move receipt.

Sid Tobias2:55:47

Do we have a seconder?

Sid Tobias2:55:48

Seconder by Councillor Rogers.

Sid Tobias2:55:51

Any opposed?

Sid Tobias2:55:52

Not opposed.

Sid Tobias2:55:53

Thanks, Leanne, for a series of briefs.

Sid Tobias2:55:56

Um, I don't think we've got any committee reports, other reports, or new business.

Sid Tobias2:56:02

So I'll pass the chair to Councillor Rogers for Public Works and Transport.

John Rogers2:56:08

And I don't think there's anything on the list, though.

John Rogers2:56:12

Um, the only thing I will uh let you know that we've gone through the um Regional Water Supply Commission's uh re um annual budget reports, and uh one of the uh significant asks is to see about getting um post-disaster equipment uh for fire halls to um be able to distribute potable water uh for V Wall and uh First Nations.

John Rogers2:56:39

So we have those blue hydrants, and and uh we're now looking to have equipment for the fire hall to uh be able to implement that uh um delivery system.

Don Brown2:56:53

Thank you, counselor Rogers.

Sid Tobias2:56:55

Uh for correspondence, we've got a single I'd like uh motion to receive.

Sid Tobias2:57:00

So moved.

Sid Tobias2:57:00

Seconded.

Sid Tobias2:57:01

Moved and seconded.

Sid Tobias2:57:02

All in favor.

Sid Tobias2:57:05

Seeing none opposed, I think we can move to question period.

Sid Tobias2:57:09

Um this wasn't a very exciting council hole, obviously.

Sid Tobias2:57:12

It's not jammed.

Sid Tobias2:57:13

Uh Carl, anybody online?

Elena Bolster2:57:17

Mayor Tobias, we've had no callers this evening.

Sid Tobias2:57:20

So we got to do upper game, folks.

Sid Tobias2:57:23

Make this more entertaining.

Sid Tobias2:57:25

Uh motions and notice of motions.

Sid Tobias2:57:27

I don't think we have anything, nor a closed meeting.

Sid Tobias2:57:29

So can I get a move to terminate?

Sid Tobias2:57:32

Move by Councillor Brown, seconded by Councilor Mackenzie.

Sid Tobias2:57:37

All in favor, everyone.

Sid Tobias2:57:39

So thank you, staff.