This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/APPENDIX B: PRELIMINARY LEFT TURN LANE DESIGN
Appendix

APPENDIX B: PRELIMINARY LEFT TURN LANE DESIGN

September 12, 2023Pages 217–2182 sections

Engineering drawing showing the conceptual design for a left turn lane on Island Highway at Prince Robert Drive.

Drawing number: 3425-B01Date: 2022-11-5Specified 20m storage length for the turn lane

339 / 341 / 345 Island Highway Traffic Impact Assessment

Page 217–218

APPENDIX B: PRELIMINARY LEFT TURN LANE DESIGN

Project Details

  • Title: Island Highway / Prince Robert Drive Left Turn Lane Concept Design
  • Project: 339-345 Island Highway TIA
  • Date: 2022-11-5
  • Project No: 3425.B01
  • Design Speed: 50 km/h
  • Permit Number: 1001432
  • Consultant: Watt Consulting Group Ltd.

Design Annotations and Notes

  • Ditch needs to be covered by road paving
  • Vegetation clearance required for sight line improvements
  • Power pole relocation required
  • Power pole relocation may be required
  • 20m Storage Length
  • Buffered Bike Lane
  • Paved Shoulder
  • Sidewalk
  • Landscaped Boulevard (Assumed)
  • Existing property line

Street Names and Property References

  • Island Highway
  • Prince Robert Dr
  • Property References: 349, 347, 345, 589, 585, 585C, 585D, 590, 594, 633-640, 631-640

Typical Cross-Section Dimensions (m)

  • Travel Lanes: 3.5m - 4.0m
  • Buffered Bike Lane: 1.8m
  • Sidewalk: 1.8m
  • Paved Shoulder: 1.8m
  • Other indicated widths: 1.7m, 3.3m, 3.6m
Page 217–218
Extracted from: 2023 09 12 Committee of the Whole Agenda - Agenda - Pdf