Committee of the Whole/Documents/APPENDIX C: TRAFFIC SIGNAL WARRANT RESULTS
Appendix

APPENDIX C: TRAFFIC SIGNAL WARRANT RESULTS

September 12, 2023Pages 219–2202 sections

Detailed table comparing traffic volumes against BC MoTI warrant requirements for the installation of a traffic signal.

Identifies 9 specific warrants assessedWarrant 2 (Interruption of Continuous Traffic) and Warrant 5 (System Warrant) were met for AM peak conditions
Page 219–220

APPENDIX C: TRAFFIC SIGNAL WARRANT RESULTS

Traffic Signal Warrant Results

Development Scenario Opening Day Pre-Development AM Opening Day Pre-Development PM Opening Day Post-Development AM Opening Day Post-Development PM 2035 10-year Horizon Pre-Development AM 2035 10-year Horizon Pre-Development PM 2035 10-year Horizon Post-Development AM 2035 10-year Horizon Post-Development PM
Traffic Volumes
Major Leg (EB + WB) 1427 1667 1449 1727 1607 1876 1631 1938
Minor Leg (NB, peak direction only) 17 13 91 51 19 14 93 53
Warrant Warrant Met?
Warrant 1: Minimum Vehicular Volume N N N N N N N N
- Major Street combined Vol (vph) > 500? Y Y Y Y Y Y Y Y
- Minor Street combined Vol (vph) > 150? N N N N N N N N
Warrant 2: Interruption of Continuous Traffic N N Y N N N Y N
- Major Street combined Vol (vph) > 750vph? Y Y Y Y Y Y Y Y
- Minor Street combined Vol (vph) > 75vph? N N Y N N N Y N
- Will signal seriously interrupt traffic flow? Y Y Y Y Y Y Y Y
Warrant 3: Progressive Movement NA
Warrant 4: Collision Experience 6 COLLISIONS IN LAST 5 YEARS (4 PDO + 2 CASUALTY)
Warrant 5: System Warrant N N Y N N N Y N
- Total entering volumes > 1000vph? Y Y Y Y Y Y Y Y
- Meets Warrant 1 N N N N N N N N
- Meets Warrant 2 N N Y N N N Y N
- Meets Warrant 6 N N N N N N N N
- Meets Warrant 7 N N Y N N N Y N
- Meets Warrant 9 N N N N N N N N
Warrant 6: Combination Warrant NA
Warrant 7: Four Hour Volume Warrant LACK DATA TO RUN WARRANT BUT LIKELY MET FOR POST DEVELOPMENT AM PEAK
- Minor Street combined Vol (vph) > 80vph? N N Y N N N Y N
Warrant 8: Peak Hour Delay (All 3 Conditions must be met) N N N N N N N N
- One leg of minor >= four vehicle-hours delay (vhd) N N Y (4.02) N (2.95) N N Y (7.21) Y (6.51)
- One leg of minor >= 100 vph N N N N N N N N
- Total intersection volumes >= 800 vph N N Y N N N Y Y
Warrant 9: Peak Hour Volume N N N N N N N N
- One leg of minor >= 100 vph N N N N N N N N
Total Number of Warrants Met? 0 0 2 0 0 0 2 0
Page 219–220
Extracted from: 2023 09 12 Committee of the Whole Agenda - Agenda - Pdf