This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Drawing PR7 - PROPOSED ELEVATIONS BLDG A
Appendix

Drawing PR7 - PROPOSED ELEVATIONS BLDG A

April 13, 2021Page 1481 section

Exterior architectural elevations for Building A showing material usage and rooflines.

9.1.3 Reports
Materials include fibre cement panels and asphalt shingle

ERSKINE MULTIFAMILY

PROPOSED ELEVATIONS BLDG A

FRONT ELEVATION

Red maple tree graphic
Red maple tree graphic
Coniferous tree graphic
Coniferous tree graphic
* TOP OF ROOF: 44.43 * FIFTH FLOOR T.O.W.: 42.75 * FIFTH FLOOR T.O. PLY: 40.0 * FOURTH FLOOR T.O. PLY: 37.25 * THIRD FLOOR T.O. PLY: 34.5 * SECOND FLOOR T.O. PLY: 31.75 * MAIN FLOOR T.O. PLY: 29.0
Coniferous tree graphic
Coniferous tree graphic
Columnar tree graphic
Columnar tree graphic

SIDE ELEVATION

Deciduous tree graphic
Deciduous tree graphic
  • TOP OF ROOF: 44.43
  • FIFTH FLOOR T.O.W.: 42.75
  • FIFTH FLOOR T.O. PLY: 40.0
  • FOURTH FLOOR T.O. PLY: 37.25
  • THIRD FLOOR T.O. PLY: 34.5
  • SECOND FLOOR T.O. PLY: 31.75
  • MAIN FLOOR T.O. PLY: 29.0
  • PROPERTY LINE: 29.0M

SIDE ELEVATION

  • TOP OF ROOF: 44.43
  • FIFTH FLOOR T.O.W.: 42.75
  • FIFTH FLOOR T.O. PLY: 40.0
  • FOURTH FLOOR T.O. PLY: 37.25
  • THIRD FLOOR T.O. PLY: 34.5
  • SECOND FLOOR T.O. PLY: 31.75
  • MAIN FLOOR T.O. PLY: 29.0

REAR ELEVATION

  • TOP OF ROOF: 44.43
  • FIFTH FLOOR T.O.W.: 42.75
  • FIFTH FLOOR T.O. PLY: 40.0
  • FOURTH FLOOR T.O. PLY: 37.25
  • THIRD FLOOR T.O. PLY: 34.5
  • SECOND FLOOR T.O. PLY: 31.75
  • MAIN FLOOR T.O. PLY: 29.0

MATERIAL LEGEND

SCALE: 1:128 METRIC

  1. FIBRE CEMENT PANELS: "IRON GREY" SMOOTH FINISH
  2. FIBRE CEMENT PANELS: "GREY SLATE" SMOOTH FINISH
  3. FIBRE CEMENT PANELS: "LIGHT MIST" SMOOTH FINISH
  4. WINDOW BOXES: FIBRE CEMENT LAPPED "CEDARTONE"
  5. ASPHALT SHINGLE ROOFING: "CHARCOAL GREY"
  6. VINYL WINDOWS - BLACK
  7. HANDRAILS, FASCIAS, DOWNSPOUTS, FLASHING PAINTED: BLACK
  8. ARCHITECTURAL CAST IN PLACE CONCRETE
  9. SOFFIT: CEDAR RENDITIONS IN 'TIMBERLINE'

REVISIONS

NO. DATE
ISSUED FOR REVIEW JUL 07 2019
ISSUED FOR REVIEW AUG 13 2019
ISSUED FOR REVIEW OCT 23 2019
ISSUED FOR REZONE NOV 04 2019
ISSUED FOR REZONE JAN 23 2020
ISSUED FOR REVIEW MAR 09 2020
ISSUED FOR REZONE MAY 21 2020
REISSUED FOR REZONE AUG 06 2020
UPDATED NOV 25 2020
ISSUED FOR DP FEB 17 2021
REISSUED FOR DP MAR 24 2021

PROJECT INFORMATION

Tanis Frame Architect AIBC LEED AP 41289 Horizon Dr. Squamish BC V8B 0Y7 T: 250.650.7901 E: info@thujaarchitecture.ca

PROJECT: ERSKINE MULTIFAMILY DRAWING: PROPOSED ELEVATIONS BLDG A SCALE: AS NOTED PROJECT NO: 20-- DRAWN BY: TF/SW SHEET: PR7

NOTES

CONTRACTOR TO VERIFY ALL LINES, LEVELS, SURVEYS, DIMENSIONS, LOCATION OF BUILDING ON SITE AND LOCATION OF ALL SERVICES PRIOR TO CONSTRUCTION. ALL WORK TO BE DONE IN ACCORDANCE WITH THE B.C. BUILDING CODE, CURRENT EDITION AND ALL LOCAL BUILDING BYLAWS.

COPYRIGHT RESERVED. THESE PLANS ARE THE PROPERTY OF THUJA ARCHITECTURE STUDIO. TO BE USED SOLELY FOR THE PROJECT SHOWN. UNAUTHORIZED REPRODUCTION OR USE IN ANY MANNER IS NOT PERMISSIBLE.

Page 148

Document Images

(2)
Document image
Document image
Extracted from: 2021 04 13 Committee of the Whole Agenda - Agenda - Pdf