Engineering Drawing SK-19 - North Property Line Retaining Plan
Technical drawing showing the layout and block legend for the north property line retaining wall.
THETIS LAKE APARTMENTS
NORTH PROPERTY LINE RETAINING PLAN
Project Address: 1938 WEST PARK LANE, VIEW ROYAL, BC Project Status: ISSUED FOR CONSTRUCTION
Contact Information: 100 St Anns Street, Campbell River, B.C. (T) 250.286.8045 (F) 250.286.8046 www.seymourpacific.ca
Revision Schedule
| No. | Description | Revision Date |
|---|---|---|
| 0 | ISSUED FOR CONSTRUCTION |
Drawing Information
| Item | Details |
|---|---|
| Drawn By: | BC |
| Checked By: | BC |
| Date: | 01/11/2020 |
| Scale: | NTS |
| Drawing #: | SK-19 |
| Rev #: | 0 |
1 NORTH PROPERTY LINE RETAINING PLAN NTS
Block Legend:
- Half-height full keyed
- Right corner half-height full keyed
- Right corner half-height half keyed
- Left corner half-height half keyed
- Standard full keyed
- Left corner standard full keyed
- Right corner standard full keyed
- Full bench block
- Right corner bench block
- Right corner half flat top
- Left corner half flat top
Notes:
- Return to rock wall fit to suit. Infill with large rocks or concrete as necessary.
- Street lighting conduits close to surface. Take precaution when excavating for base preparation.
- Orientation of corner blocks referenced by looking at the face of the wall.
- Refer to geotechnical design drawing for geogrid requirements.
Trade Contractor Notes:
TRADE CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND REPORT ANY DISCREPANCIES OR INCONSISTENCIES TO SEYMOUR PACIFIC DEVELOPMENTS LTD., WITHOUT DELAY, FOR CLARIFICATION AND/OR CONFIRMATION. DO NOT SCALE DRAWINGS. DESIGNS REPRESENTED AND DRAWINGS USED AS INSTRUMENTS OF SERVICE SHALL REMAIN THE COPYRIGHT AND PROPERTY OF SEYMOUR PACIFIC DEVELOPMENTS LTD. ANY REPRODUCTION OR USE FOR ANY PURPOSE OTHER THAN THAT AUTHORIZED BY SEYMOUR PACIFIC DEVELOPMENTS LTD. IS PROHIBITED.
CONTRACTORS SHALL REMAIN FAMILIAR WITH, SHALL REFER TO, AND SHALL PERFORM IN ACCORDANCE WITH LOCAL LAWS, REGULATIONS AND BUILDING CODES. CONTRACTORS SHALL MAINTAIN GOOD INDUSTRY BUILDING AND SAFETY PRACTICES CONSISTENT WITH THE CONTRACT INTENT AND THE REQUIREMENTS OF JURISDICTIONAL AUTHORITIES.
ADDITIONAL CLAIMS AND COSTS RELATED TO NON-MATERIAL CHANGES WILL NOT BE ACCEPTED BY SEYMOUR PACIFIC DEVELOPMENTS LTD. NON-MATERIAL CHANGES ARE DEEMED TO BE PLAN CHANGES OR SPECIFICATION ADJUSTMENTS THAT DO NOT SUBSTANTIALLY AFFECT THE VALUE, TIME, COST AND QUALITY OF CONSTRUCTION.
CONTRACTORS SHALL MAKE EVERY REASONABLE EFFORT TO MAINTAIN SCHEDULE TARGETS AND PROVIDE GOOD EFFICIENCY, PROGRESS, WORKMANSHIP AND QUALITY TOWARD DEFICIENCY-FREE RESULTS.