Committee of the Whole/Documents/Engineering Drawing - Rock Wall Mesh West Perimeter / Soil Retaining Wall West Perimeter
Appendix
Engineering Drawing - Rock Wall Mesh West Perimeter / Soil Retaining Wall West Perimeter
May 11, 2021Page 2341 section
Sections showing details for rock wall mesh stabilization and soil retaining walls on the west perimeter.
Drawing No: 7877-7-1Date: March, 2020Issued for Discussion: 2020-03-26Anchor rock embedment: minimum 2.0 m
ROCK WALL/SOIL STABILIZATION
Proposed Residential Development - 1938 West Park Lane, View Royal, B.C.
Project Information
- Client: Seymour Pacific Developments Ltd.
- Engineering Firm: RYZUK GEOTECHNICAL Engineering & Materials Testing
- Drawing No: 7877-7-1
- Date: March, 2020
- Status: ISSUED FOR DISCUSSION: 2020-03-26
- Drawn By: CPAS
- Scale: NTS
SECTION - Rock Wall Mesh West Perimeter
Engineering diagram illustrating rock mesh stabilization on a fractured bedrock slope.
- Property Line (P/L)
- Anchorage System:
- Auxiliary cable and Auxiliary anchor (see detail F).
- Galvanized main anchor with eye nut for connection of mesh and top suspension cable. Minimum rock embedment of 2.0 m and 1.0 m stickup. Angle: 10° max.
- Galvanized anchor plate and nut.
- Local rock support anchors (galvanized) to stabilize unstable blocks, 3 m embedment.
- Slope Characteristics:
- Fractured in-place bedrock.
- Existing, unstable rock slope (approximate).
- Approximate height: 12 m.
- Containment and Catchment:
- Rock mesh covering the slope face.
- Catchment area height: 1.2 m.
- Catchment to be inspected seasonally and cleaned when more than 20% full by height.
- Lock-block concrete or alternate wall to provide adequate catchment width behind. Wall height: 1.2 m.
- Fence by others.
- Finished parking grade.
SECTION - Soil Retaining Wall West Perimeter
Engineering diagram illustrating a lock-block retaining wall with geogrid soil reinforcement.
- Property Line (P/L)
- Excavation and Backfill:
- Backfill comprising blast rock to be sloped at 1.5H: 1V. If soils, 2H: 1V.
- Temporary excavation cutslope.
- Backfill to consist of approved granular material compacted to 95% Standard Proctor Maximum Dry Density (SPMDD).
- Reinforcement:
- Geogrid length = 0.75H (where H is the wall height).
- MiraGrid 10XT or equivalent geogrid layers.
- Construction Details:
- Concrete wedge to connect the bottom up to 3 block courses. Dowels should have a depth into the blocks and bedrock a minimum 0.2 m with 15 M bar with hook.
- Concrete pour to be staged such that height of concrete does not exceed 2 blocks at a time.
- Base preparation: Place block on existing well-compacted blast rock fill, native hard glacial till, or concrete leveling pad upon such. If fill, the subgrade is to be recompacted after bulk excavation is completed.
DETAIL - Block and Rock Anchors
Lock-Block Rebar Anchor Detail
- 15M rebar anchors to be installed in back side of lock-block.
- Two per lock-block spaced evenly at half lock-block height.
- Non-shrink microsil grout or approved equivalent.
- Hole/anchor to be inclined or measures to be taken to avoid grout loss.
- Indicated dimensions: 0.1 m, 0.2 m, 0.3 m.
Rock Anchor Detail
- 15M rebar rock anchors. Size and spacing to be determined based on observed rock quality.
- Depth to be determined based on rock quality.
- Non-shrink microsil grout or approved equivalent.
- Hole/anchor to be inclined or measures to be taken to avoid grout loss.
- Indicated dimensions: 0.1 m, 0.3 m.
Notes:
- Mesh and rock anchor locations to be confirmed with Ryzuk Geotechnical on site following hydro-scaling.
- Actual lock-block retaining wall height will be determined at the time of construction based on the encountered conditions.
Page 234
Extracted from: 2021 05 11 Committee of the Whole Agenda - Agenda - Pdf