A table comparing View Royal's current and proposed tree bylaws with those of Victoria, Saanich, and Oak Bay.

Comparison factors: protected species, size, pruning rules, penalties, and replacement ratiosProposed View Royal pruning branch diameter change: from 5 cm to 10 cm

Tree Bylaw Comparison - 2021

General

General Current TVR Bylaw No. 695 Proposed amendments to new TVR Bylaw No. 1069 Victoria Saanich Oak Bay
Amended 2014 (add cash in lieu for replacement trees) 2021 Nov 2019 Sept 2019 July 2020
1. Protected Species/Size 11 species 12 species 7 species 8 species 6 species
Garry Oak
Arbutus
Pacific Dogwood
Pacific Yew
Douglas Fir
Grand Fir
Big Leaf Maple
Western Red Cedar
Sitka Spruce
Sequoia
Coast Redwood
add Shore Pine Garry Oak
Arbutus
Pacific Dogwood
Pacific Yew
Douglas Fir
Big Leaf Maple
Western Red Cedar
Garry Oak
Arbutus
Pacific Dogwood
Pacific Yew
Douglas Fir
Grand Fir
Big Leaf Maple
Western Red Cedar
Garry Oak
Arbutus
Pacific Dogwood
Pacific Yew
Shore Pine
Black Hawthorne
Protected - size dbh 30cm dbh 30cm dbh 30cm dbh 60cm dbh 30cm
2. Protected - other restrictive covenant add replacement trees, any tree with evidence of a nest used by raptors, osprey, heron; Town-owned property; trees planted or retained as a rqmt of a subdivision permit, development permit or building permit n/a over 10cm/5m in streamside; evidence of nest for raptors, ospreys, herons; tree on saanich property any tree with evidence of a nest used by raptors, osprey, heron; and tree with scientific value
3. Significant Trees Schedule A (no trees listed on schedule) removed Schedule A (no trees listed on schedule) many private & muni; includes community, heritage, landmark or wildlife habitat; 50% maintenance grant 9 trees on public lands; private can be included but property owner must agree
4. Pruning/alter - branch 5 cm 10 cm 10 cm 5cm; permit not req'd (except for Significant) when done in accordance with sound aboriculture practices 5 cm if protected by species; 10cm of other protected
5. Emergency Removal severely damaged in past 24 hrs/imminent danger; contact Town within 72 hrs with photos severely damaged in past 24 hrs/imminent danger; contact Town within 1 business day with photos severely damaged by natural causes, imminent danger n/a under supervision of arborist, report in 1 business day, provide written report from qualified assessor
6. Watercourse no removal within 15m no removal within 30m 15m Streamside dev permit
7. Penalties $3k 1st, $10k sub, plus various specific listed in MTI $3k 1st, $10k sub, plus various specific listed in MTI $1,500 1st; $3,000 sub; $250 seedling; max $10k; each day a separate offence not less than $1k for first offence, not less than $2k for subsequent; $5k for significant trees, misc not less than $250; each tree is a separate offence not more than $10k, and not less than the fines prescribed in bylaw schedule ($1,000-2,500 - see schedule B)
Cash in lieu $150 (species) $100 (size) $500 per tree $2,000 $300 $500 per tree
9. Building Envelope Exemption building envelope, bldg addition, or accessory bldg not exempt exempt for building envelope, bldg addition, or accessory bldg not exempt not exempt

Private Property

Private Property Current TVR Proposed amendments to new TVR Bylaw No. 1069 Victoria Saanich Oak Bay
Permit Fee 0 up to 12 weeks wait, no fee; priority 2-4 wks $100 $50 for first 3 trees + $5/tree for additional (no charge for pruning/removal of dead, dying diseased, hazardous, emergency) 0 $50 (type 1 permit)
Security 120% as req'd by DoE 120% as req'd by DoE $700 (mandatory; cash or letter of credit) $300 (mandatory) $700 (mandatory) tree
Replacement trees 2/1; height 1.5m, caliper 5cm; species approved by DoE; arbutus replace w/arbutus 2/1; height 2m, caliper 5cm 2/1 same species as removed; or as auth by Director; 1.5m/4cm; arbutus #5 pot 3/1; deciduous-4cm@15cm above ground; coniferous-3m high; native to be selected from predetermined list - 2.5cm/1.8m (reduced size req for native plantings) 1/1; list of trees provided on a schedule
Replacement period 6 months of permit issuance or prior to occupancy 6 months of permit issuance or prior to occupancy n/a 90 days from date of permit issuance not specified
Maintenance Period 2 yr no change n/a 1 yr 1 yr

Development/Construction

Development/Construction Current TVR Proposed amendments to new TVR Bylaw No. 1069 Victoria Saanich Oak Bay
Permit Fee 0 0 (up to 12 weeks); $100 priority processing (2-4 weeks) $40 $50+$30/tree for building, subdiv, blast, plumb, demo; $100+$30/tree for dev permit; $40 for amendments $500 (type 2 permit)
Security same as private property $700 $700 - 50% released on planting; 50% after 1 yr $700/replacement tree ; or $1k-$10k during construction
Building Envelope exempt remove from exemption exempt for building envelope, bldg addition, or accessory bldg not exempt not exempt
Replacement Ratio 2/1 n/c 2/1 dead/dying, hazardous/wrong place trees replaced at 1/1; footprint or driveway 2/1; installation of roads, access, service of bare land strata 3/1 2/1
Insufficient Area $100/150 per tree $500/tree $2,000 $300 dead/dying, hazardous/wrong place; construction $700; $1350 on public property $500 per tree
Maintenance Period 2 yr 2 yrs n/a n/a 3 yrs
Other $100 reinspection fee; muni trees must be replaced @ 3/1 Zoning - owner must plant on same parcel replacement trees up to or exceeding defined target, eg neighbourhood 35/45%, commercial