9 ERSKINE LANE STORMWATER MANAGEMENT - FIGURE 4

September 15, 2020Page 3651 section

Plan illustrating the proposed stormwater management strategies, flow directions, and rain water management areas.

9 Erskine LaneOctober 9, 2019

9 ERSKINE LANE - STORMWATER MANAGEMENT - FIGURE 4

TOWN OF VIEW ROYAL

CIVIC ADDRESS: 9 ERSKINE LANE, LOT B, TOWN OF VIEW ROYAL, PLAN VIP26648

OCTOBER 2, 2019 FOR DISCUSSION PURPOSES ONLY

LEGEND

  • ON-SITE CATCHMENT AREA
    • NORTH — 0.8586 ha
    • SOUTH — 1.4927 ha
  • EXISTING FLOW DIRECTION (White Arrow)
  • PROPOSED FLOW DIRECTION (Green Arrow)

Project Details

Description Information
IEL PROJECT 2253
ISSUED OCT 09, 2019
DRAWN BY KK
CHECKED BY MJA
SCALE 1:1250

Site Plan Map Labels

Buildings and Infrastructure

  • BLDG A (79 UNITS)
  • BLDG B (79 UNITS)
  • BLDG C (107 UNITS)
  • BLDG D (107 UNITS)
  • WATKISS WAY
  • ERSKINE LANE
  • GALLOPING GOOSE TRAIL
  • TRANS CANADA HIGHWAY
  • 9000 CSP (labeled in two locations)

Environment and Stormwater Features

  • STONERIDGE WETLAND PARK
  • CRAIGFLOWER CREEK
  • PROPOSED RAINWATER MANAGEMENT AREA (labeled in two locations)
  • MIX OF OPEN DITCH AND CULVERTS TO CREEK
  • Catchment Boundaries: NORTH and SOUTH
  • Elevation Contours: 30.00, 25.00, 20.00