Proposed Road Layout (SK-01)

September 15, 2020Page 4971 section

Civil engineering drawing detailing the proposed 4-building multi-family development and its site layout.

8.2.a)i. Email dated September 14, 2020 from K. Gilbert, 68-14 Erskine Lane, Re: Erskine Lane/Watkiss Way Amenities Petition
9 Erskine LaneHerold Engineering336 total units proposed across Buildings A, B, C, and DAugust 11, 2020 revision date

9 Erskine Lane Multi-Family Development Rezoning Application

Town of View Royal Client: Westurban Developments Ltd. Drawing Title: Proposed Road Layout Drawing No: SK-01 Project No: 4689-006 Date: 2020.08.11

Building Summary

Building Storeys Units Main Floor Elevation
Building A 5 Storey 79 Units 29m
Building B 5 Storey 79 Units 29m
Building C 5 Storey 89 Units 21m
Building D 5 Storey 89 Units 21m

Notes

  1. FOR DISCUSSION PURPOSES ONLY.
  2. SEE LEGAL SURVEY DRAWING FOR SITE DETAILS AND ELEVATIONS.
  3. SEE ARCHITECTURAL DRAWINGS FOR BUILDING DETAILS.
  4. EXISTING INFORMATION PROVIDED BY OTHERS.

Issues

No. Date Description
1 2020.08.11 REZONING

Site and Infrastructure Annotations

  • Road Requirements: Road section as per TOVR Std. Dwg. No. VRSD-R14 including:
    • Barrier curb and gutter
    • 1.50m boulevard
    • 1.80m concrete sidewalk
    • 1.50m boulevard
    • Streetlighting
  • Transit: Relocate existing bus stop; details to be established by TOVR and BC Transit.
  • Accessibility: Wheelchair access ramp as per MMCD Std. Dwg. No. C8.
  • Intersections: Extent of potential intersection roundabout at Watkins Way and Erskine Lane.
  • Parking/Traffic:
    • Reinstate "No Parking" signs as required.
    • Driveway crossings as per TOVR Std. Dwg. No. VRSD-C7b (Width between 5.00m to 10.00m).
  • Utilities and Services:
    • Storm drain infrastructure required for installation of barrier curb.
    • Provide curb letdown and access for CRD/MD maintenance vehicles, as per CRD/MD requirements.
    • Community mailbox to be relocated as per Canada Post requirements.
    • Existing utility pole to remain; anchor to be relocated.
    • Catch basins and storm manholes to be adjusted, relocated, or installed as noted.
    • Existing water gate valves to be adjusted to suit or relocated.
    • Electrical kiosks to be adjusted in boulevard.
  • Landscaping: Existing trees to be removed (typ.).
  • Regional Features: Site adjacent to Galloping Goose Regional Trail.

Engineering Firm

Herold Engineering 1051 Vancouver St, Victoria, BC V8V 4T6 Tel: 250-590-4875 Fax: 250-590-4392 Email: vic@heroldengineering.com