Proposed Road Layout (SK-01)
September 15, 2020Page 4971 section
Civil engineering drawing detailing the proposed 4-building multi-family development and its site layout.
9 Erskine LaneHerold Engineering336 total units proposed across Buildings A, B, C, and DAugust 11, 2020 revision date
9 Erskine Lane Multi-Family Development Rezoning Application
Town of View Royal Client: Westurban Developments Ltd. Drawing Title: Proposed Road Layout Drawing No: SK-01 Project No: 4689-006 Date: 2020.08.11
Building Summary
| Building | Storeys | Units | Main Floor Elevation |
|---|---|---|---|
| Building A | 5 Storey | 79 Units | 29m |
| Building B | 5 Storey | 79 Units | 29m |
| Building C | 5 Storey | 89 Units | 21m |
| Building D | 5 Storey | 89 Units | 21m |
Notes
- FOR DISCUSSION PURPOSES ONLY.
- SEE LEGAL SURVEY DRAWING FOR SITE DETAILS AND ELEVATIONS.
- SEE ARCHITECTURAL DRAWINGS FOR BUILDING DETAILS.
- EXISTING INFORMATION PROVIDED BY OTHERS.
Issues
| No. | Date | Description |
|---|---|---|
| 1 | 2020.08.11 | REZONING |
Site and Infrastructure Annotations
- Road Requirements: Road section as per TOVR Std. Dwg. No. VRSD-R14 including:
- Barrier curb and gutter
- 1.50m boulevard
- 1.80m concrete sidewalk
- 1.50m boulevard
- Streetlighting
- Transit: Relocate existing bus stop; details to be established by TOVR and BC Transit.
- Accessibility: Wheelchair access ramp as per MMCD Std. Dwg. No. C8.
- Intersections: Extent of potential intersection roundabout at Watkins Way and Erskine Lane.
- Parking/Traffic:
- Reinstate "No Parking" signs as required.
- Driveway crossings as per TOVR Std. Dwg. No. VRSD-C7b (Width between 5.00m to 10.00m).
- Utilities and Services:
- Storm drain infrastructure required for installation of barrier curb.
- Provide curb letdown and access for CRD/MD maintenance vehicles, as per CRD/MD requirements.
- Community mailbox to be relocated as per Canada Post requirements.
- Existing utility pole to remain; anchor to be relocated.
- Catch basins and storm manholes to be adjusted, relocated, or installed as noted.
- Existing water gate valves to be adjusted to suit or relocated.
- Electrical kiosks to be adjusted in boulevard.
- Landscaping: Existing trees to be removed (typ.).
- Regional Features: Site adjacent to Galloping Goose Regional Trail.
Engineering Firm
Herold Engineering 1051 Vancouver St, Victoria, BC V8V 4T6 Tel: 250-590-4875 Fax: 250-590-4392 Email: vic@heroldengineering.com