Appendix
LAW RESIDENCE 275 KERWOOD STREET PLANTING PLAN
September 15, 2020Page 5504 sections
Detailed landscape and planting plan for the property, including a schedule of native species and boulder placement.
August 25, 2019KB Design
LAW RESIDENCE - 275 KERWOOD STREET - PLANTING PLAN
Project Details
- Address: 275 KERWOOD STREET
- Date: AUGUST 25, 2019
- Scale: 1 : 100
- Project Number: 472 15 01
- File Number: LAW RES - L1R28.DWG
- Revision: 1. 02/16/20 J.P. COMMENTS

Page 550
PLANT LIST
| KEY | QTY | BOTANICAL NAME | COMMON NAME | SIZE | ROOTS | COMMENTS |
|---|---|---|---|---|---|---|
| A | 4 | CORNUS KOUSA | KOUSA DOGWOOD | 3.0 - 3.5 M HT. | B & B | MULTI-STEM, FULL, MIN. 3 STEMS |
| B | 7 | FAGUS SYLVATICA 'DAWYK'S GOLD' | PYRAMIDAL GOLD BEECH | 5.0 C.M. CAL. 3.0-3.5 M HT. | B & B | MULTI-STEM, FULL, MIN. 3 STEMS |
| C | 8 | RIBES SANGUINEUM 'WHITE ICICLE' | WHITE ICICLE FLOWERING CURRANT | 1.0 M HT | 27 CM POT | MULTI-STEM, FULL |
| AS | 23 | ARTEMISIA SUKSDORFII | COASTAL SAGE | 40 CM HT. | 21 CM POT | FULL |
| D | 17 | CALAMAGROSTIS ACUTIFLORA 'KARL FOERSTER' | FEATHER REED GRASS | 60 CM HT. | 21 CM POT | FULL |
| E | 4 | HOLODISCUS DISCOLOR | OCEAN SPRAY | 1.0 M HT | 27 CM POT | MULTI-STEM, FULL |
| F | 10 | LIRIOPE MUSCARI 'SAMANTHA' | SAMANTHA LILY TURF | 30 CM SPR. | 21 CM POT | FULL, PLANT 45 CM O.C. |
| G | 68 | MAHONIA AQUIFOLIUM | OREGON GRAPE | 40 CM HT. | 27 CM POT | FULL |
| H | 12 | POLYSTICHUM MUNITUM | SWORDFERN | 30 CM HT. | 21 CM POT | FULL |
| J | 24 | POTENTILLA FRUTICOSA 'ABBOTSWOOD' | ABBOTSWOOD POTENTILLA | 45 CM HT. | 27 CM POT | FULL |
| K | 43 | ROSA WOODSII | WOODS ROSE | 40 CM HT. | 21 CM POT | FULL |
| L | 77 | ARCTOSTAPHYLLOS UVA URSI | KINNICKINNICK | 30 CM SPR. | 15 CM POT | MIN. 3 LEADERS, PLANT 45 CM O.C. |
| FC | 35 | FRAGARIA CHILOENSIS | COASTAL STRAWBERRY | 30 CM SPREAD | 15 CM POT | FULL, PLANT 45 CM O.C. |
| M | 225 | GAULTHERIA SHALLON | SALAL | 30 CM SPR. | 15 CM POT | FULL, PLANT 30 CM. O.C. |
| WILDFLOWER MIX | DIVERSE MEADOW MIX | SAANICH NATIVE PLANTS MIX |
NOTE: PLANTS MUST MEET SIZE AND POT SPECIFICATION AND MAY EXCEED BCLNA STANDARDS. AREA OF PLANT MATERIAL SOURCING TO INCLUDE WESTERN NORTH AMERICA.
Page 550
NOTES
- CONTRACTOR TO REPORT ALL ERRORS, OMISSIONS AND DISCREPANCIES TO LANDSCAPE ARCHITECT IMMEDIATELY AND PRIOR TO COMMENCEMENT OF WORK.
- CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND SERVICES AND ANY DAMAGE TO SAME CAUSED BY HIS WORK.
- CONTRACTOR TO ENSURE SMOOTH CONTINUOUS POSITIVE DRAINAGE AWAY FROM BUILDING TO ALL DRAINAGE PICKUP POINTS.
- ALL LANDSCAPED AREAS TO BE IRRIGATED WITH A FULLY AUTOMATIC UNDERGROUND IRRIGATION SYSTEM. COORDINATE IRRIGATION SLEEVES, TIMER CLOCK LOCATION AND WATER CONNECTIONS WITH GENERAL CONTRACTOR.
- ALL PLANT MATERIALS SHALL BE GUARANTEED FOR A PERIOD OF (1) YEAR AFTER DATE OF ACCEPTANCE. ALL REPLACEMENT PLANTS TO BE GUARANTEED FOR AN ADDITIONAL 12 MONTHS FROM TIME OF PLANTING.
- AREAS DESIGNATED AS RIVER ROCK TO HAVE 125 MM TO 300 MM CLEAN WASHED RIVER ROCK TO LANDSCAPE ARCHITECT APPROVAL, TO A DEPTH OF 300 MM PLACED ON BLACK FILTER CLOTH. FILL VOIDS W/ 10MM CLEAN, WASHED PEA GRAVEL, RIVER ROCK TO STAND PROUD.
- WHERE PLANTING BEDS ABUT LAWN AREA INSTALL MAINTENANCE STRIP - 2 X 4 PRESSURE TREATED FIR EDGER, STAKED WITH 2 X 2 X 45CM, PRESSURE TREATED FIR STAKES, STAKE 1.2 M. O.C. AND AT ALL JOINTS AND ENDS. TOP OF STAKE TO BE 2.5CM BELOW TOP OF EDGER.
- ALL LAWN AREAS TO BE SODDED.
- COMPOST TO BE PLACED TO 75 MM DEPTH AFTER SETTLEMENT IN ALL PLANTING BEDS.
- ALL LANDSCAPE WORK ON CITY PROPERTY TO TOWN OF VIEW ROYAL STANDARD AND APPROVAL.
- REFER TO ARCHITECTURAL/CIVIL FOR HARD LANDSCAPE & SITE GRADING.
Page 550
BOULDER SCHEDULE
- BOULDERS FOR SITE TO BE WELL ROUNDED, CLEAN & WASHED TO MATCH RIVER ROCK TO LANDSCAPE ARCHITECT PRE-APPROVAL.
- BOULDERS ARE TO BE PLACED IN LANDSCAPE AREAS AS FOLLOWS:
- LARGE: 1.25 M DIA. TOTAL (2)
- MEDIUM: 1.00 M DIA. TOTAL (2)
- SMALL: .75 M DIA. TOTAL (2)
- LAYOUT & PLACEMENT OF ALL BOULDERS AS PER PLAN TO THE APPROVAL OF THE LANDSCAPE ARCHITECT.
Page 550
Extracted from: 2020 09 15 Committee of the Whole Agenda - Agenda - Pdf