This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Esquimalt Harbour – Small Project Environmental Screening Report
Other

Esquimalt Harbour – Small Project Environmental Screening Report

September 15, 2020Pages 578–5971 section

An environmental screening report for a private dock installation at 275 Kerwood, outlining project details, construction steps, and mitigation strategies.

275 Kerwood, Victoria, B.C. V9B 4C6EIA Tracking #: 2019-21-102529Proponent: Dennis LawProject: Installation of a 60' x 12' replacement dock and 50' x 4' aluminum gangwayInstallation of 6 new steel pilings (40' x 12")Removal of old creosote treated timber pilings

An environmental screening report for a private dock installation at 275 Kerwood, outlining project details, construction steps, and mitigation strategies.

Page 578–597

Document Images

(12)
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Document image
Extracted from: 2020 09 15 Committee of the Whole Agenda - Agenda - Pdf