Engineering map modeling storm sewer capacity during a 25-year storm event.

July 2017Aplin Martin

25 YEAR EVENT FUTURE LAND USE STORM SEWER ASSESSMENT

NOTICE TO CONTRACTOR

IT IS THE RESPONSIBILITY OF THE CONTRACTOR'S SURVEYOR TO VERIFY THAT ALL LEGAL SURVEY DIMENSIONS SHOWN ON THE ENGINEERS DRAWINGS AGREE WITH THOSE ON THE REGISTERED LEGAL SURVEY PLAN. SHOULD THERE BE ANY DISCREPANCIES, THEN IMMEDIATELY NOTIFY THE ENGINEER OF RECORD.

LEGEND

  • 25 YEAR STORM FLOODED MANHOLE
  • 25 YEAR STORM SURCHARGED MANHOLE
  • MANHOLE
  • STORAGE
  • OUTFALL
  • STORM SEWERS & CULVERTS
  • DITCH
  • 25 YEAR STORM SURCHARGED PIPE (>900mm)
  • 25 YEAR STORM SURCHARGED PIPE (≤900mm DIA.)
  • SURCHARGED PIPES UNDER HIGH TIDE BOUNDARY CONDITION
  • LEGAL LINES
  • MUNICIPAL BOUNDARY
  • TRANS CANADA HWY
  • STREAM
  • RAILWAY
  • NEIGHBORHOOD BOUNDARY

REVISION HISTORY

REV. NO. DESCRIPTION DR CH DATE APP
1 FOR REVIEW JS VL 14/07/2017 WY

PROJECT INFORMATION

CLIENT: TOWN OF VIEW ROYAL 45 VIEW ROYAL AVENUE, VICTORIA, BC V9B 1A6

PROJECT: TOWN OF VIEW ROYAL MASTER DRAINAGE PLAN 2016-2017

TITLE: 25 YEAR EVENT FUTURE LAND USE STORM SEWER ASSESSMENT

FIELD VALUE
PROJECT NO. 16-282
DRAWING NO. 16-282
SCALE HORZ. 1:7,500, VERT. N/A
A & M DRAWING NO. FIGURE 6
DESIGN VL
CHECK VL
DRAWN JS
APPR WY
DRAWING DATE JULY 2017
SHEET NO. 02 OF 03
REV. 1