This site is in beta — data may be incomplete and features are still being added.
Committee of the Whole/Documents/Sewage Calculations for 298 Island Highway
Other

Sewage Calculations for 298 Island Highway

September 15, 2020Pages 786–7871 section

Handwritten engineering calculations for Peak Wet Weather Flow (PWWF) and average daily wastewater generation.

August 24, 202032,435 L/day total daily flow0.375 L/s peak daily flow

298 Island

Sewage Calculations

Proposed Building

Assumptions

  • 300 L/c/d (MMCD)
  • 1.8 cap/unit (CRD - for High density)
  • 5 L/m² for retail/commercial (VIHA)
  • Rest as per MMCD design guidelines.

Given

  • 54 units.
  • 655 m² retail/commercial.

Calc's

ADWF

  • 54 units x 1.8 cap/unit x 300 L/cap/day = 29,160 L/day
  • 655 m² x 5 L/m² = 3,275 L/day
  • Total: 32,435 L/day
  • => 0.375 L/s

Calc Peaking Factor

  • Pop equivalent = (32,435 L/day) / (300 L/cap/day) = 108 cap.

PF (Peaking Factor)

  • PF = 6.75 P⁻⁰·¹¹ = 6.75 (108)⁻⁰·¹¹
  • PF = 4.032

PWWF (Peak Wet Weather Flow)

  • * Assume no I/I since building take whole site.
  • ∴ = 4.032 (0.375 L/s) = 1.512 L/s
Page 786–787
Extracted from: 2020 09 15 Committee of the Whole Agenda - Agenda - Pdf