Attachment 7. Civil Cut/Fill Matrix

April 9, 2019Page 1371 section

Engineering chart and map detailing the depth of excavation (cut) and deposit (fill) across the site.

2 APPROVAL OF AGENDA
Associated Engineering7-9.2m CUT

SEYMOUR PACIFIC DEVELOPMENTS LTD

THETIS LAKE SUBDIVISION

CIVIL CUT/FILL MATRIX

Civil cut/fill matrix drawing for Thetis Lake Subdivision, showing building footprints, parking layout, and color-coded zones indicating varying depths of earthwork cut and fill across the site.
Civil cut/fill matrix drawing for Thetis Lake Subdivision, showing building footprints, parking layout, and color-coded zones indicating varying depths of earthwork cut and fill across the site.

LEGEND

(AS DETERMINED FROM PROPOSED SUBGRADE TO ORIGINAL GROUND)

  • 7-9.2m CUT
  • 5-7m CUT
  • 3-5m CUT
  • 2-3m CUT
  • 0-2m CUT
  • 0-2m FILL
  • 2-3m FILL
  • 3-4m FILL
  • 4-6.7m FILL

Revision History

REV DATE DESIGN DRAWN DESCRIPTION
A 2019/MAR/11 DD DAH ISSUED FOR DEVELOPMENT PERMIT

Drawing Information

Project Number 2019-2522-00
Scale 1:250
Drawing No. 2522-00-C-103
Revision A
Sheet 3 / 3