Committee of the Whole/Documents/Attachment 7: Site Servicing Plan
Appendix

Attachment 7: Site Servicing Plan

February 12, 2019Page 941 section

Engineering drawing showing proposed utilities, watermain upgrades, and drainage for the site.

2. APPROVAL OF AGENDA
Islander EngineeringApril 27, 2018

Site Servicing Plan - 7 Erskine Lane

General Notes and Plan Labels

  • Watermain upgrade likely required to accommodate maximum allowable fire flow velocity.
  • New water service C/W domestic meter and domestic fire backflow preventor.
  • View Royal crews to install new drain service.
  • Proposed gas service.
  • View Royal crews to install new sanitary service.
  • Proposed multi-unit residential building over concrete parking structure (70 units).
  • Stormwater treatment within planted areas.
  • Removal of existing private hydro poles to be confirmed.
  • Extent of underground parking garage.
  • Existing flush valve. Existing ditch / stormwater detention beneath parking lot.
  • Disclaimer: The location and elevation of existing underground services on this drawing may not be accurate or complete. The actual horizontal and vertical location must be confirmed by utility companies and the contractor prior to the start of any excavations.

Legend - Proposed Services Shown Dashed

Feature Feature Feature Feature Feature
WATER CURB EXISTING U/G UTIL. MANHOLE HYDRANT
DRAIN SIDEWALK PROPOSED U/G UTIL. CLEANOUT VALVE
DITCH EDGE PAVE. LIGHT STANDARD CATCHBASIN FLUSH VALVE
SEWER BUSHLINE POWER POLE SILTRAP AIR VALVE
GAS TREE ANCHOR CONC. BOX METER
REDUCER CAP CULVERT HEADWALL ROAD SIGN
MONUMENT LOT PIN LEAD PLUG

Revisions

No. Description Date
1 CONCEPTUAL SERVICING PLAN [Blank]

Project Information

  • Project: Proposed Condo Development
  • Address: 7 Erskine Lane
  • Location: Town of View Royal
  • Client: 1132785 BC LTD
  • Drawing Title: Site Servicing
  • Date: 27/4/18
  • Project No: 2046
  • DWG No: C01
  • Sheet: 1 of 1
  • Revision: 1
  • Design: JMB
  • Drawn: SB
  • Checked: SB
  • Scales: Hor. 1:200, Vertical 1:200
Page 94