Committee of the Whole/Documents/Civil Engineering Drawings – McElhanney Consulting Services Ltd. – July 25, 2019
Appendix

Civil Engineering Drawings – McElhanney Consulting Services Ltd. – July 25, 2019

September 10, 2019Page 1041 section

Civil site plan detailing utilities, site boundaries, and building footprints.

2. APPROVAL OF AGENDA
June 25, 2019McElhanney Consulting Services Ltd.

Eagle Nest Residences

View Royal, B.C.

Title: Site Plan Consultant: McElhanney Consulting Services Ltd. (500 - 3960 Quadra Street, Victoria, BC V8X 4A3) Date: June 25, 2019 Drawing No.: 18-095-SK.1 Status: ISSUED FOR REZONING

Sheet Notes

  1. Existing water service to be capped & abandoned by CRD forces at developer's expense or be utilized for boulevard irrigation.
  2. Utility pole to be removed / relocated. Details to be confirmed with BC Hydro/Telus/Shaw.

Notes

  1. For building information, see drawings by de Hoog Kierulf Architects.
  2. For landscaping including trees (proposed, to be removed and to remain), see drawings by Murdoch de Greeff Inc. Landscaping Planning & Design.
  3. For geotechnical assessment, see report by Ryzuk Geotechnical Engineering & Materials Testing.
  4. Utility sizes and locations to be confirmed during detailed design.
  5. Offsite watermain upgrades, if required, to be determined during detailed design.
  6. Fire department connection locations to be confirmed.
  7. Connection to existing offsite storm drainage to be confirmed.
  8. Main floor elevations subject to change during detailed design.
  9. All existing houses, driveways, retaining walls, sheds, etc. to be removed and disposed off-site.
  10. Hydro-servicing will, if required, to be coordinated with FortisBC during detailed design.
  11. Location of bus bay to be confirmed during detailed design with BC Transit and Town of View Royal.
  12. Refer to landscape drawings for trees to be removed/retained.

Benchmark

Drawing coordinates are local based on UTM NAD 83 Reference Monument MON M-1 (G101030).

  • Northing: 5368550.003
  • Easting: 468628.026
  • Elevation: 41.691m
  • Mean C.S.F.: 0.9996106

All distances are ground level distances and elevations are geodetic elevations.

Revisions

No. Date By Description
1 2018-09-14 ND ISSUED FOR REZONING
2 2019-06-25 ND ISSUED FOR REZONING

Project Information

  • Project No.: 18-095
  • Scale: Horiz: 1:250 / Vert: N/A
  • Date: June 25, 2019
  • Title: SITE PLAN
Page 104
Extracted from: 2019 09 10 Committee of the Whole Agenda - Agenda - Pdf